Case Summary (BLD) | | | 2/1/2016 | | DONE |
|
|
|
|
Fee Review-notes | 7/2/2003 | 7/2/2003 | 7/2/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/23/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9148 issued 5-23-02 to the Nez Perce Apts.
|
Permanent Occupancy | | 5/22/2002 | 5/22/2002 | | DONE |
|
|
|
|
Temporary occupancy | | | 11/29/2001 | | DONE |
|
|
|
issued 11/29/01 #4667 to the Nez Perce Apts. - waiting on landscaping and structural for perm aml
|
BLD-Final | 11/27/2001 | 11/28/2001 | 11/28/2001 | A | PART |
Tom Arcoraci
|
|
|
DARRELL ###-#### --FN ok for temp when code enforcement signs ok for perm when others sign perm occ 11/28/2001 11:22:46 AM
|
FIRE-Final Inspection | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | PASS |
Rick Jackson
|
|
|
###-#### APRIL address on permit reflects 3842; address on building reflects 3818; address on approved plans reflects 3820; April went to addressing and corrected address - 3818!!! 11/26/2001 4:16:57 PM
|
BLD-Footing | 11/1/2001 | 11/1/2001 | 11/1/2001 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 11/1/2001 9:58:08 AM holes for parking canopys
|
BLD-Footing | 10/30/2001 | 10/31/2001 | 10/31/2001 | P | FAIL |
Dave Hannah
|
|
|
Phillip, ###-####no plans on site 10/31/2001 3:24:39 PM
|
BLD-Footing | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 10/26/2001 | 10/29/2001 | 10/29/2001 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 15:23:01. Contact: ###-####. BY CONTRACTOR 10/29/2001 9:20:47 AM
|
BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | | PASS |
Jim Storey
|
|
|
wip 9/10/2001 7:55:24 AM
|
BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | DONE |
Dave Hannah
|
|
|
fr insp-- dwayne ###-####
|
BLD-Energy code compliance | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | PASS |
Dave Hannah
|
|
|
energy code dwayne ###-####
|
BLD-Energy code compliance | 7/3/2001 | 7/6/2001 | 7/6/2001 | A | NR |
Russ Owen
|
|
|
Daryl ###-####left c/n to complete and recall. 7/6/2001 10:16:08 AM
|
BLD-Framing/Rough-in | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PASS |
Jim Storey
|
|
|
Darrel ###-####
|
BLD-Framing/Rough-in | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | PART |
Jim Storey
|
|
|
shear nail on the first floor April ###-#### first floor stair wells sheer nailling ok for gyp. cover. 6/6/2001 4:53:16 PM
|
BLD-Framing/Rough-in | 6/1/2001 | 6/4/2001 | 6/4/2001 | P | PART |
Jim Storey
|
|
|
###-#### second floor exterior nailling ok 6/4/2001 3:29:54 PM
|
BLD-Foundation | 5/23/2001 | 5/24/2001 | 5/24/2001 | A | PASS |
Steven Webb
|
|
|
Duane ###-#### Already poured--contractor said had special inspection (MTI). 5/24/2001 11:23:59 AM
|
BLD-Foundation | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | FAIL |
Russ Owen
|
|
|
slab DAryl ###-#### all int footings are required to 16 in wide accross the bottom,also rebar is not held inplace laying in bottom of footing. notified contractor at site. 12/23/2001 2:40:30 PM
|
BLD-Conference | 5/11/2001 | 5/11/2001 | 5/11/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/11/2001 8:42:15 AM w/ bldr re insp req's
|
BLD-Footing | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PART |
Carl Dependahl
|
|
|
Darrell ###-####...ftgs, pour at own risk , pend soils report 5/2/2001 5:28:13 PM
|
Additional plans submitted | | | 4/25/2001 | | DONE |
|
|
|
Received additional plans from Tamura and associates, forwarded same to Jim Storey. 4/25/01 DAR
|
Issue PAID IN FULL permit | | | 4/24/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/6/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/6/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/6/2001 | | DONE |
|
|
|
called mark gave dollar
|
Routing - PLAN CHECK | 4/4/2001 | | 4/5/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/5/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 12/6/2000 | | 4/5/2001 | | PASS |
Mike Phillips
|
|
|
4/5/2001 15:08:34 M_P - activity updated through activity BLDA022 from case BLD00-03569.
|
Routing - FIRE | 4/3/2001 | | 4/4/2001 | | PASS |
|
|
|
revised construction to type v-1hour to decrease fire flow requirement. - OK
|
Plan Reviewer's activity | | | 4/3/2001 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - PLAN CHECK | 3/23/2001 | | 4/3/2001 | | PEND |
|
|
|
Routing to fire and planning.
|
Plan resubmittals received | | | 4/2/2001 | | DONE |
|
|
|
Received plan resubmittals from Mark Sanders, forwarded same to Mike Phillips. 4/2/01 DAR
|
Plan resubmittals received | | | 3/29/2001 | | DONE |
|
|
|
Received one copy of revised struct. calcs. sheets 5 & 6. Routed to Mike P. KMM
|
Routing - FIRE | 3/22/2001 | | 3/23/2001 | | FAIL |
|
|
|
INADEQUATE WATER SUPPLY
|
Routing - PLAN CHECK | 12/27/2000 | | 3/22/2001 | | FAIL |
|
|
|
Routing to fire
|
Plan Reviewer's activity | | | 3/22/2001 | | FAIL |
|
|
|
Additional information required for further review.
|
Override - Parcel Holds | | | 3/22/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 3/22/2001 | | |
|
|
|
|
Plan resubmittals received | | | 3/22/2001 | | DONE |
|
|
|
received two copies of revised A1.0 sheet. Put with plans. KMM
|
Plan resubmittals received | | | 3/6/2001 | | DONE |
|
|
|
Received three copies of revised sheets A0.0, A1.0, A2.0, A2.1, A3.0, A4.0, A5.0, A7.0, A7.1, A8.0, A10.0. Routed to Mike P. KMM
|
Meeting | | | 2/23/2001 | | |
|
|
|
Discussed with Mark about deficiencies in plans.
|
Plan Reviewer's activity | | | 2/1/2001 | | FAIL |
|
|
|
Called an talked to Mark Sanders needed additional informaiton on plans prior to doing my review.
|
Routing - PLUMBING | 12/22/2000 | | 12/27/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 12/15/2000 | | 12/22/2000 | | DONE |
|
|
|
cross reference with CUP00-00126
|
Routing - PUBLIC WORKS | 12/11/2000 | | 12/15/2000 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/11/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/11/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/7/2000 | | HOLD |
|
|
|
Plans on hold in my hold box. Requires.
1. Three extra civil sets/ Received 3 sets of drainage plans.12/8/00 DAR
2. O&M manual/received 12/8/00
3. Drainage Calculations./ 12/8/00 received drainage calculations
Contacted Mark Sanders and Matt of Hubble. KMM
|
Received Certificate of Value | | | 12/7/2000 | | DONE |
|
|
|
Just a project value of $14,04.04 listed.
|
Plan routing begun/NEW & ADDTN | | | 12/7/2000 | | HOLD |
|
|
|
|
Application received | | | 12/6/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 12/6/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 12/6/2000 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|