Case Summary (BLD) | | | 11/15/2010 | | |
|
|
|
|
BLD-Conference | 12/15/2001 | 12/15/2001 | 12/15/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 12/15/2001 1:35:20 PM 12/15/2001 2:43:21 PM went over exterior system will be useing STO efis approved by icbo research report. 12/15/2001 2:44:24 PM
|
BLD-Wall cover | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 12/11/2001 3:20:59 PM need architect ext wall eifs submitals, c/n pos
|
BLD-Wall cover | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | CANC |
Russ Owen
|
|
|
Added by Inspector: 407 On 12/10/2001 10:41:13 AM . I did not schedule this inspection ? 12/10/2001 2:29:09 PM 12/10/2001 2:29:37 PM
|
Fee Review-notes | 3/20/2001 | 3/20/2001 | 7/16/2001 | | DONE |
|
|
|
changed value on bld00-03580
|
Fee Review-notes | 12/7/2000 | 12/7/2000 | 7/16/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/2/2001 | 7/2/2001 | | DONE |
|
|
|
|
BLD-Final | 6/29/2001 | 7/2/2001 | 7/2/2001 | A | PASS |
Tom Arcoraci
|
|
|
kelly ###-#### ok for perm occ 7/1/2001 9:37:58 PM
|
Permanent occupancy | | | 7/2/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8744 issued 7-1-01 to Nowalk Furniture Store.
|
Code Occupancy Approval | | | 7/2/2001 | | PASS |
|
|
|
ALL CONDITIONS HAVE BEEN MET FINAL SIGNED OFF.
|
PubWorks Occupancy Approval | 6/29/2001 | 6/29/2001 | 6/29/2001 | | DONE |
|
|
|
|
BLD-Final | 6/27/2001 | 6/29/2001 | 6/29/2001 | A | CANC |
Russ Owen
|
|
|
###-####
|
FIRE-Final Inspection | 6/28/2001 | 6/29/2001 | 6/29/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 6/29/2001 11:55:29 AM
|
FIRE-Final Inspection | 6/27/2001 | 6/28/2001 | 6/28/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 6/28/2001 11:27:16 AM
|
Print Occupancy Form | | | 6/25/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/8/2001 | | DONE |
|
|
|
Record of Survey, recorded as Instrument No. 101052406 on May 31, 2001. Received copy of recorded survey on 6/8/01. Parcel hold was removed based on this recordation.
|
BLD-Framing/Rough-in | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | PASS |
Russ Owen
|
|
|
Kelly ###-####ok to rock 12/23/2001 3:48:12 PM
|
Override - Parcel Holds | | | 5/23/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PART |
Russ Owen
|
|
|
kelly ###-#### ok to insulate,fire block,and bolt connection of post /beam c/n posted. 12/22/2001 4:14:17 PM
|
Override - Parcel Holds | | | 5/21/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/9/2001 | 5/10/2001 | 5/10/2001 | A | FAIL |
Russ Owen
|
|
|
shear wall nailing kelly ###-####
|
BLD-Framing/Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PART |
Russ Owen
|
|
|
###-#### ROOF NAILING ,ok to cover 12/9/2001 1:52:12 PM
|
Override - Parcel Holds | | | 5/9/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/8/2001 | | |
|
|
|
|
BLD-Foundation | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | PART |
Russ Owen
|
|
|
FOUND WALL-KELLY -- ###-#### 3 int slab footings, and trash enclosure 4/6/2001 4:17:07 PM
|
Override - Parcel Holds | | | 4/6/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/6/2001 | | |
|
|
|
|
BLD-Foundation | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PASS |
Russ Owen
|
|
|
###-#### wall pour for retaining wall. 4/3/2001 4:07:51 PM
|
Override - Parcel Holds | | | 4/3/2001 | | |
|
|
|
|
BLD-Foundation | 3/28/2001 | 3/29/2001 | 3/29/2001 | A | PASS |
Dave Hannah
|
|
|
Kelly ###-#### late morning... retaining wall ftg 3/29/2001 10:43:20 AM
|
(F) Reprint permit | | | 3/28/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/28/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 3/27/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/27/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/21/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/21/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 12/7/2000 | | 3/20/2001 | | PASS |
Mike Phillips
|
|
|
3/20/2001 09:30:30 M_P - activity updated through activity BLDA022 from case BLD00-03580.
|
Routing - PLAN CHECK | 2/23/2001 | | 3/20/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/20/2001 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/20/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/20/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/20/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/20/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2001 | | DONE |
|
|
|
talked to brian ellsworth to verify plans are ready
|
Plan resubmittals received | | | 3/16/2001 | | DONE |
|
|
|
Received two copies of revised sheets A10 and A11. Routed to Mike P. KMM
|
Plan Reviewer's activity | | | 3/16/2001 | | PEND |
|
|
|
Waiting for no build agreement to be recorded.
|
Plan Reviewer's activity | | | 3/9/2001 | | FAIL |
|
|
|
Received call from engineer and advised me additional drawings will be submitted to reflect beam design changes at front entry canopy.
|
Plan Reviewer's activity | | | 3/6/2001 | | FAIL |
|
|
|
Waiting for informaiton from engineer about changed beams that do not match calculations.
|
Plan Reviewer's activity | | | 2/26/2001 | | |
|
|
|
Issued foundation permit.
|
Plan resubmittals received | | | 2/26/2001 | | DONE |
|
|
|
Received three copies of revised sheets A1, C1, L1, A2 and A5. One copy of reviesed cert. of value for the building and one revised cert. for grading/foundation permit. Routed to Mike P. KMM
|
Routing - PUBLIC WORKS | 2/23/2001 | 2/26/2001 | 2/23/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/21/2001 | | 2/23/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/23/2001 | | 2/23/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/22/2001 | | DONE |
|
|
|
Received 5 sets of sheet C1 from Philip Reitz, forwarded same to Mike Phillips. 2/22/01 DAR
|
Routing - PUBLIC WORKS | 2/16/2001 | | 2/21/2001 | | FAIL |
|
|
|
Requires drainage plan revision plus O&M manual per Brian Murphy. 2/21/01
|
Plan resubmittals received | | | 2/20/2001 | | DONE |
|
|
|
Received plan resubmittals from Philip Rietze Architect small documents and two sets of plans. 2/20/01
|
Routing - PLAN CHECK | 2/8/2001 | | 2/16/2001 | | |
|
|
|
Routing to P.W. and Plumbing
|
Plan resubmittals received | | | 2/16/2001 | | DONE |
|
|
|
Received two copies of revised sheets A1, C1, A11 and two copies of Roof Drains information. Routed to Mike P. KMM
|
Routing - FIRE | 2/5/2001 | 2/5/2001 | 2/5/2001 | | PASS |
|
|
|
resubmittal. Acceptable.
|
Routing - PLAN CHECK | 1/9/2001 | | 1/25/2001 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/9/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 1/4/2001 | | 1/9/2001 | | FAIL |
|
|
|
Comments faxed to architect
|
Routing - PLAN CHECK | 12/19/2000 | | 1/4/2001 | | |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 1/4/2001 | | FAIL |
|
|
|
Additional information required for further review.
|
Routing - PLUMBING | 12/14/2000 | | 12/19/2000 | | FAIL |
|
|
|
provide a site plan showing location and sizes of sewer and water services, provide a plan showing roof drainage system, sizes, routing and points of termination.
|
Routing - PUBLIC WORKS | 12/8/2000 | | 12/14/2000 | | FAIL |
|
|
|
Requires revision of O&M plan per Brian Murphy. 12/14/00 DAR
|
Routing - PLANNING | 12/14/2000 | | 12/14/2000 | | PASS |
|
|
|
Approve per DRH00-184.
|
Plans ACCEPTED BY PLAN TECH | | | 12/8/2000 | | DONE |
|
|
|
gave Brian Ellsworth a Arch./ Eng. record dec. form to bring back. KMM
|
Plan routing begun/NEW & ADDTN | | | 12/8/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 12/7/2000 | | DONE |
|
|
|
|
Application received | | | 12/7/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/7/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|