Name WASHINGTON GROUP INTERNATIONAL
Site Address 12438 W BRIDGER ST
Project NameBRC BLDG #1
Customer Number 
ePlanReviewNo
Description
To install a backup generator for power to be located on the west side of an existing office building per approved plans on file and CZC01-00005, CZC00-00154, and CUP01-00003. The back up generator to be located within a 7 foot high block unroofed enclosure. Work will also include closing office one exterior door to tenant Space130 in adjacent building. Above ground fuel tank requires a conditional use and Fire Department approval. Generator to provide backup power for Washington Group International tenant space in adjacent building. NOTE: Occupant load analysis provided for Ste. 130 to substantiate only one exit required for tenant space. Therefore, closing off door on east side for this work is acceptable. See plan for calculations. (P.C. #1033-00) mys
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/9/2004  
Fee Review-notes12/8/200012/8/20005/24/2001 DONE
Letter of compliance  4/2/2001 DONE
Letter of Compliance #21449 issued 4-2-01.
FIRE-Final Inspection3/28/20013/29/20013/29/2001APASS
DetailsJoe Tawney
Final OK for certificate of completion 3/29/2001 12:44:25 PM
BLD-Final3/28/20013/29/20013/29/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/28/2001 at 13:14:30. Contact: ###-####.
Code Occupancy Approval  3/29/2001 PASS
Inspected for Final - Complies with Z.C. and CUP01-00003 - Signed Final.
BLD-Footing2/26/20012/26/20012/26/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/26/2001 at 10:43:19. Contact: ###-####. footing and wall OK. 2/26/2001 11:46:43 AM
Routing - PLAN CHECK2/15/2001 2/23/2001 DONE
Susan Riggs released permit for issuance at 3:15 p.m. on 2/23/01. Permit can now be issued.
PLANS/APPL TAKEN TO FRONT DESK  2/23/2001 DONE
Inspection Record Card- Bld  2/23/2001 DONE
Print Occupancy Form  2/23/2001 DONE
Issue PAID IN FULL permit  2/23/2001 DONE
Plan assigned to (MYS)1/17/2001 2/23/2001 PASS
DetailsMarlene Southard
2/23/2001 15:16:38 MYS - activity updated through activity BLDA022 from case BLD00-03595.
Routing - PLANNING1/17/2001 2/15/2001 DONE
PLEASE NOTE: this progect was granted CU approval by the Hearing Examiner on Feb. 7, 2001. The project has a 10 day appeal period which endS at 5:00 on Feb. 23, 2001. No one was present at the public hearing so it is highly unlikley that it will get appealed. The applicant is anxious to pull the permit. If he does pull his permit before the appeal period ends, this is at his own risk. If I am not in, please check with Scott Spjute if he decides to pull a permit prior to the appeal period endng. Approved by CUP01-00003
Routing - PLANNING2/13/2001 2/15/2001 PASS
Routed to Susan Riggs. CUP01-00003.
Plan resubmittals received  1/31/2001 DONE
Received one copy of letter from Cole associates and two copies of generator data sheets. Routed to Marlene. KMM
Routing - FIRE1/31/2001 1/31/2001 PASS
Routing - PLAN CHECK1/31/2001 1/31/2001 HOLD
Waiting for CUP01-00003 approval.
Routing - FIRE1/17/2001 1/24/2001 FAIL
Request manuf spec sheets & listing info
Routing - PLAN CHECK1/24/2001 1/24/2001 HOLD
Waiting for approvals from Planning & Fire, then I can issue.
Plan Review Completed(1st rev)  1/24/2001 FAIL
Plan Reviewer's activity  1/17/2001 DONE
Zoning Certificate CZC01-00005 issued on 1/17/01 which allows proceeding with the installation of the above ground fuel tank pending conditional use approval. Therefore, plans can begin routing. If CU is not approved then the tank must be removed within 30 days of the denial letter from Planning.
Pending Assignment by MYS12/13/2000 1/17/2001 DONE
DetailsMarlene Southard
1/17/2001 10:15:43 MYS - activity updated through activity BLDA165 from case BLD00-03595.
Additional plans submitted  12/28/2000 DONE
Received additional plans from Cole and Associates. Originally received plans on 12/22/00 but there was no permit number on the transmittal and the plans were attched to a incorrect permit number. The plans were sent back and Matt put a permit number on the transmittal. Two sheets of A3.0 forwarded to Marlene. 12/28/00 DAR
Plan Reviewer's activity  12/28/2000 HOLD
PLANS STILL ON HOLD. Discussed with Tempra Wilson. She informed me that they still need the zoning certificate (which hasn't been approved yet) and will need an additional conditional use for the above ground diesel storage tank. She said she would let Marty Santoyo know.
Plans ACCEPTED BY PLAN TECH  12/11/2000 DONE
Received Certificate of Value  12/8/2000 DONE
Application received  12/8/2000  
Recd Pcfee & Taken To Pln CK  12/8/2000 DONE