BLD-Final | 5/2/2001 | 5/3/2001 | 5/3/2001 | P | PASS |
Steven Webb
|
|
|
###-#### 0474 send is the code C. of C. #21441 issued. 5/3/2001 1:20:27 PM
|
BLD-Energy code compliance | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | PASS |
Tom Arcoraci
|
|
|
Nick ###-####
|
BLD-Framing/Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PART |
Steven Webb
|
|
|
Nick ###-####c/n issued---ok to insulate 2/7/2001 12:49:23 PM
|
BLD-Framing/Rough-in | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Steven Webb
|
|
|
shear wall bob-- ###-#### ok to side 1/29/2001 2:12:15 PM
|
BLD-Framing/Rough-in | 1/24/2001 | 1/25/2001 | 1/25/2001 | A | FAIL |
Steven Webb
|
|
|
SHEAR WALL -NICK ###-#### c/n issued, 1) Hd missing corner of moring room, 2) renail shear panels in compliance of shear plan, 3) Blocks needed at plywood joints on shear panels at various locations, 4) instal MSTC 40 straps per plans on upstair bedroom 4 per plans, 5) Nailing needed above hd straps 1/25/2001 12:00:18 PM
|
Plan assigned to (SAM) | 12/11/2000 | | 12/19/2000 | | PASS |
Steve Munroe
|
|
|
12/19/2000 08:14:31 SAM - activity updated through activity BLDA022 from case BLD00-03598.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/19/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/19/2000 | | DONE |
|
|
|
###-#### called permit ready for pickup
|
Issue PAID IN FULL permit | | | 12/19/2000 | | DONE |
|
|
|
|
BLD-Foundation | 12/15/2000 | 12/18/2000 | 12/18/2000 | A | PASS |
Steven Webb
|
|
|
FOUND BRENT ###-####: 12/18/2000 8:02:17 AM Added on 12/15/2000 by phone request. 12/18/2000 8:02:57 AM
|
BLD-Foundation | 12/15/2000 | 12/15/2000 | 12/15/2000 | P | PART |
Steven Webb
|
|
|
Added by Inspector: 420 On 12/15/2000 2:48:48 PM Early Start permit, no approved plans on site.
|
BLD-Footing | 12/13/2000 | 12/14/2000 | 12/14/2000 | A | PART |
Steven Webb
|
|
|
late am please Brent ###-####Early Start, appears ok. 12/14/2000 11:03:16 AM
|
Routing - PUBLIC WORKS | 12/11/2000 | 12/11/2000 | 12/11/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 12/11/2000 | 12/11/2000 | 12/11/2000 | | PASS |
|
|
|
|
Application received | | | 12/11/2000 | | |
|
|
|
came in 12/4 wasn't address untill 12/11/2000 by mapping div. pe
|
Pending Assignment by DJO | 12/11/2000 | | 12/11/2000 | | DONE |
Dan Overy
|
|
|
12/11/2000 14:10:40 SAM - activity updated through activity BLDA183 from case BLD00-03598.
|
Routing - PLAN CHECK | 12/11/2000 | 12/11/2000 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/13/00 14:15 I called and talked to the engineer about walls considered in his calculations. He said he will have to get a set of plans and call me later. I then called and left a message for Nick with Nemec to call me, to inform him of what is happening on the plans.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/15/00 Waiting for fire department release. Plan review is done.
|
Early Start Permit | | | | | PEND |
|
|
|
early start ok per steve m /pe
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/13/00 Called and talked to Todd with Media One. Asked some minor questions and asked him to contact Riley Mahaffey, engineer, and have him call me. I have question on trib area for formal dining/foyer/den wall line. I also have questions on how tall overheight wall is and where wall lines 3, 4 and 5 are.
|
Case Summary (BLD) | | | | | |
|
|
|
|