Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03601
StatusFinaled
Name THE J.A. HOLMES CORPORATION
Site Address 4184 S BARBER STATION WAY
Project Name 
Customer Number939-8289
ePlanReviewNo
Description
This project is to build a 2650s.f. 2-story single family dwelling with 1186s.f. on the 1st level and 1464s.f. on the upper level including a 408s.f. bonus room; an attached 1008s.f. 2-car garage, all per the approved plans as noted and attached conditions. Zoned R-1C/DA per CUP98-00116 per rhj..PC#1046...pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/6/20014/9/20014/9/2001APASS
DetailsJim Sly
Matt ###-#### C/C issued. 4/9/2001 11:05:18 AM
DOC - Permit Finaled4/9/20014/9/20014/9/2001APASS
DetailsJim Sly
Added by Inspector: 316 On 4/9/2001 11:04:57 AM
BLD-Framing/Rough-in2/16/20012/16/20012/16/2001PPASS
DetailsSteven Webb
reinspection Matt ###-####
BLD-Energy code compliance2/16/20012/16/20012/16/2001PPASS
DetailsSteven Webb
Matt ###-####
BLD-Framing/Rough-in2/15/20012/15/20012/15/2001PPART
DetailsSteven Webb
reinspection Matt ###-####c/n issued--eng. needed on 2 ply ml with hole penetration, gable trusses of m. bed and b.r. # 2 needs stiffbacks or standard gable truss detail indicating not needed, solid bearing under m.l in closet off formal gathering room, marked with black x. 2/15/2001 1:03:01 PM
BLD-Framing/Rough-in2/13/20012/14/20012/14/2001PPASS
DetailsSteven Webb
###-####Shear not framing, ok to side. 2/14/2001 2:17:58 PM
BLD-Framing/Rough-in2/12/20012/12/20012/12/2001PCANC
DetailsSteven Webb
###-####: CANCELLED BY CONTRACTOR 2/12/2001 12:46:44 PM
BLD-Framing/Rough-in2/6/20012/6/20012/6/2001PFAIL
DetailsSteven Webb
###-####c/n issued--missing hd's (4) in front. Mispositioned hd's (2 in front), additional nailing required. 2/6/2001 2:19:22 PM
BLD-Foundation1/4/20011/5/20011/5/2001APART
DetailsSteven Webb
FOUND TODD ###-#### Already pourted, appeared ok. 1/5/2001 11:57:57 AM
BLD-Footing1/3/20011/4/20011/4/2001ANR
DetailsTony Young
FT INSP- TODD ###-####
BLD-Footing1/3/20011/3/20011/3/2001PPART
DetailsSteven Webb
FT INSP-- TODD ###-#### rebar not totally installed.1/3/2001 3:33:29 PM 1/3/2001 3:33:37 PM 1/3/2001 3:33:51 PM
Issue PAID IN FULL permit  1/2/2001 DONE
Inspection Record Card- Bld  12/14/2000 DONE
Telephone call  12/14/2000 DONE
talked to JA Holmes-gave dollar amount
Plan Review Report  12/13/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/13/2000 DONE
Routing - PUBLIC WORKS12/11/200012/11/200012/11/2000 PASS
Routing - PLANNING12/11/200012/11/200012/11/2000 PASS
Application received  12/11/2000 PASS
Routing - PLAN CHECK12/11/200012/11/2000  PEND
(F) Reprint permit     
Pending Assignment by DJO12/11/2000   PEND
DetailsDan Overy