DOC - Permit Finaled | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 1/14/2002 3:09:26 PM
|
BLD-Final | 6/14/2001 | 6/14/2001 | 6/14/2001 | P | PASS |
Russ Owen
|
|
|
fn occ pat-- ###-####
|
BLD-Final | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 07:07:52. Contact: ###-####. C/N issued-tempered glass next to patio door and provide energy report--was not provide on 4-4-01 at energy inspection. 6/12/2001 1:34:48 PM
|
BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 | | PASS |
Steven Webb
|
|
|
wip 6/4/2001 7:55:02 AM
|
BLD-Energy code compliance | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 11:01:02. Contact: ###-####. C/n issued--Provide energy report to inspector prior to issuance of C. of O. at final. 4/4/2001 3:28:43 PM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 09:22:01. Contact: ###-####. C/N posted-ok to insulate. 4/3/2001 2:21:18 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 10:53:49. Contact: ###-####. Contractor cancelled. 4/2/2001 1:23:20 PM
|
BLD-Framing/Rough-in | 3/19/2001 | 3/20/2001 | 3/20/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 12:37:39. Contact: ###-####. ok to side 3/20/2001 11:34:16 AM
|
BLD-Foundation | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 15:34:10. Contact: ###-####. hd not installed at time of inspection. 2/20/2001 10:31:39 AM
|
BLD-Footing | 2/15/2001 | 2/16/2001 | 2/16/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 16:22:40. Contact: ###-####.wip--soil and setbacks ok 2/16/2001 2:34:44 PM
|
Issue PAID IN FULL permit | | | 2/12/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 12/21/2000 | 12/21/2000 | 1/25/2001 | | PASS |
Dan Overy
|
|
|
1/25/2001 09:02:58 DJO - activity updated through activity BLDA022 from case BLD00-03607.
|
Plan Reviewer's activity | | | 1/25/2001 | | DONE |
|
|
|
plans resubmitted 01-24-2001. only one set of approved plans is being issued as Prestige Homes still did not address all alternate panels, re-inforcing or grid lines call-outs. engineered shear wall lengths in calculations do not match wall lengths shown on plans. additional holdowns called out that meet Boise City Conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/25/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 1/25/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/25/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2001 | | DONE |
|
|
|
called Prestige Homes at ###-####
|
Plans ACCEPTED BY PLAN CHECK | | | 12/21/2000 | | |
|
|
|
|
Plan Reviewer's activity | | | 12/20/2000 | | PEND |
|
|
|
have called designer due to problems with engineering, wall bracing, footing design and energy requirements.
|
Routing - PUBLIC WORKS | 12/12/2000 | 12/12/2000 | 12/14/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 12/12/2000 | 12/12/2000 | 12/13/2000 | | PASS |
|
|
|
|
Application received | | | 12/12/2000 | | |
|
|
|
|
Pending Assignment by DJO | 12/12/2000 | | | | PEND |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 12/14/2000 | | | | PEND |
|
|
|
|