Case Summary (BLD) | | | 10/31/2007 | | |
|
|
|
|
BLD-Grading Inspection | 12/17/2001 | 12/17/2001 | 12/17/2001 | A | PART |
Rita DeYoung
|
|
|
House and garage demo'd lot graded flat.
|
BLD-Other | 12/11/2001 | 12/11/2001 | 12/10/2001 | A | PART |
Bob Archibald
|
|
|
Demo in progress.
|
BLD-Conference | 12/5/2001 | 12/5/2001 | 12/4/2001 | A | PART |
Bob Archibald
|
|
|
Spoke w/Cathy from C&C Salvage, removal of asbestos is in progress and will be completed this week with demo beginning monday 12/10/01.
|
BLD-Conference | 12/3/2001 | 12/3/2001 | 12/3/2001 | A | PEND |
Bob Archibald
|
|
|
Cathy w/C&C Demolition informed me they were waiting on asbestos test results and would contact me when received.
|
BLD-Conference | 11/27/2001 | 11/27/2001 | 11/26/2001 | P | PART |
Bob Archibald
|
|
|
Site visit confirmed house and garage have had all personal property removed. Power will not be terminated this date. Demo is scheduled to begin this friday and be completed by 12/5/01. Items in rear of property and construction of garage to be reviewed after demo of house/garage and out building.
|
BLD-Conference | 11/16/2001 | 11/16/2001 | 11/16/2001 | | PART |
Bob Archibald
|
|
|
Spoke w/dave roe he has received letter from attorney preventing access to property. Cathy w/C&C also called and may do demo job I informed her it had to be done by the 26th, no exceptions, she will get back with me.
|
BLD-Other | 11/16/2001 | 11/16/2001 | 11/16/2001 | | DONE |
|
|
|
Scott B. served Mr. Depple with letter revoking zoning certificate and building permit @ 3:08 p.m. on 11/15/01.
|
VOIDED CHANGE STATUS | | | 11/15/2001 | | DONE |
|
|
|
Revoking building permit due to revocation of zoning certificate per BCC 11-05-01.5 and pursuant to UBC Sections 106.4.3 and 106.4.5. Notification delivered to permit holder, Walter Deppel, on November 15, 2001 by Scott Brown from Code Enforcement.
|
BLD-Conference | 11/14/2001 | 11/14/2001 | 11/13/2001 | P | PART |
Bob Archibald
|
|
|
Mr. Lyman informed me that Mr. Depple didn't allow Cross Town Movers to enter property and remove personal property and that he had also retained an attorney, Jim Jones, and has fired American Wrecking for permited demolition. Cathy with C&C Salvage contacted me and said Depple had asked them to perform the required demolition after December 1st. Dave with American Wrecking was not aware of Mr. Depples reported actions. I contacted both demo contractors and told them we were on hold until conference and actions had been discussed with our legal dept..
|
BLD-Conference | 11/8/2001 | 11/8/2001 | 11/8/2001 | A | PART |
Bob Archibald
|
|
|
Conference with Dave Roe @ American wrecking. I informed him that Boise City was going to remove property owners property and that structures should be ready for demo on 11/12/01. I also informed him of an existing gas line that may be capped near meter on structure to be removed. Dave informed me he would call dig line and I left a voice message with Robert @ the gas co., ###-####, to contact me regarding this issue. I also informed Dave that structures were to be completly removed including all building debrie and lot backfilled and graded level. I will contact Dave 11/13/01 after performing field verification that personal property has been removed.
|
BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 | A | PART |
Bob Archibald
|
|
|
Extension granted untill 11/12/01. Mr. Lyman in the mayors office has informed Mr. Depple that the city will pay for Cross Town Movers to remove and place in storage remaining personal property.
|
BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Bob Archibald
|
|
|
Spoke with Dave Roe from American Wrecking and instructed him to begin demolition at this address on 11/13/01. Also instructed him to notify owner work will begin that date.
|
BLD-Aging Inspection | 10/16/2001 | 10/16/2001 | 10/16/2001 | | PART |
Steven Webb
|
|
|
Prior extension expires 10/22/01. 10/16/2001 8:40:00 AM
|
BLD-Other | 8/16/2001 | 8/16/2001 | 8/16/2001 | A | PART |
Bob Archibald
|
|
|
30 day extension given by mayors office 8/10/01. Expiration date 9/10/01.
|
BLD-Conference | 8/8/2001 | 8/8/2001 | 8/8/2001 | A | PART |
Bob Archibald
|
|
|
Return receipts for certified mail received for delivery to Walter and Dave Roe.
|
BLD-Conference | 8/7/2001 | 8/7/2001 | 8/6/2001 | A | PART |
Bob Archibald
|
|
|
Spoke with Dave Roe (American Wrecking) informed him he would be demo contractor on job and his bond would not be cashed and bids sought. He is in receipt of N&O.
|
BLD-Other | 8/2/2001 | 8/2/2001 | 8/2/2001 | A | PART |
Bob Archibald
|
|
|
Final N&O sent by certified mail to owner and demo contractor.
|
Case Summary (BLD) | | | 7/31/2001 | | DONE |
|
|
|
|
BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 | | PART |
Steven Webb
|
|
|
Issue CN for 30 notice. Posted CN and verbally informed owner of pending date for demolition per permit condition. 7/10/2001 2:48:41 PM
|
BLD-Aging Inspection | 6/11/2001 | 6/11/2001 | 6/11/2001 | | PASS |
Steven Webb
|
|
|
wip 6/11/2001 7:50:10 AM
|
BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 | A | PART |
Jim Sly
|
|
|
Walt Deppel ###-#### OK to Occupy MFG Home, .....C/N Have 120 days to demo house and 30 days after that to construct garage. 4/9/2001 9:50:39 AM
|
BLD-Final | 4/4/2001 | 4/6/2001 | 4/6/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### Gary C/N - posted on site. 4/6/2001 1:16:52 PM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Steven Webb
|
|
|
back patio cover ###-#### gary
|
BLD-Footing | 3/5/2001 | 3/7/2001 | 3/7/2001 | A | PART |
Steven Webb
|
|
|
###-#### wip-appears ok 3/7/2001 10:50:57 AM
|
Issue PAID IN FULL permit | | | 2/20/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2001 | | DONE |
|
|
|
|
Telephone call | | | 2/9/2001 | | DONE |
|
|
|
called no answer
|
CHANGE STATUS TO (PND) | | | 1/11/2001 | | DONE |
|
|
|
Per Angie B.
|
(F) Reprint permit | | | 1/9/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/26/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/26/2000 | | DONE |
|
|
|
called permit ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/14/2000 | 12/14/2000 | 12/21/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 12/14/2000 | 12/14/2000 | 12/20/2000 | | PASS |
|
|
|
site plan approved by wayne
|
Application received | | | 12/14/2000 | | |
|
|
|
|
Pending Assignment by DJO | 12/14/2000 | | | | PEND |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 12/21/2000 | | | | PEND |
|
|
|
took to steve
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/21/00 14:10 Called and left a message for Lisa Thomas with Honstead Homes to call me. I need to know the exact dimensions of the home to compare to perposed garage.
|