BLD-Grading Inspection | 4/5/2002 | 4/5/2002 | 4/5/2002 | | PASS |
Rita DeYoung
|
|
|
Grading and drainage is complete and approved.
|
BLD-Final | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 09:43:49. Contact: ###-####.
|
DOC - Permit Finaled | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 4/5/2002 2:17:58 PM
|
BLD-Final | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 08:12:23. Contact: ###-####.ok for c of c after sign-off from public works on hillside. 4/3/2002 3:08:45 PM
|
BLD-Final | 4/2/2002 | 4/2/2002 | 4/2/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/02/2002 at 10:11:27. Contact: ###-####.
c/n mostly ok, lacking p/w sign off,,,, working on temp. glass and fire caulking 4/2/2002 2:48:18 PM
|
BLD-Conference | 4/1/2002 | 4/1/2002 | 4/1/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/1/2002 11:46:30 AM w/ bldr re b.e.c., etc. keep c/n
|
BLD-Final | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 12:43:38. Contact: ###-####. see c/n, need p. wks, htg, verify temp glass... 3/28/2002 11:49:48 AM
|
BLD-Conference | 3/27/2002 | 3/27/2002 | 3/27/2002 | P | PASS |
Steven Webb
|
|
|
No firesprinker required on this dwelling. Approved by Dave Miller. Letter on file.
|
BLD-Conference | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | PART |
Tony Young
|
|
|
go over project w/ super. about trades and sprinkler system that is not installed 3/25/2002 6:59:08 AM
|
BLD-Final | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | FAIL |
Tony Young
|
|
|
key code 4915enter ###-####
need trades, and sprinkler system 3/22/2002 11:12:16 AM
|
Case Summary (BLD) | | | 3/21/2002 | | DONE |
|
|
|
|
BLD-Aging Inspection | 12/24/2001 | 12/24/2001 | 12/24/2001 | | PART |
Tony Young
|
|
|
wip 12/26/2001 2:29:06 PM
|
BLD-Aging Inspection | 10/24/2001 | 10/24/2001 | 10/24/2001 | | PART |
Tony Young
|
|
|
wip? 10/24/2001 2:29:00 PM
|
BLD-Framing/Rough-in | 8/22/2001 | 8/24/2001 | 8/24/2001 | A | PASS |
Tony Young
|
|
|
###-#### ted please call before 10
conf. only w/ ted, garage fire wall and ceiling, ok w/ one layer 5/8 in garage w/ rated doors, all sealed per plans will be ok 8/24/2001 11:44:30 AM
|
BLD-Framing/Rough-in | 8/10/2001 | 8/13/2001 | 8/13/2001 | A | PASS |
Tony Young
|
|
|
check fireblocks, energy code ok also 8/13/2001 11:04:55 AM
|
BLD-Energy code compliance | 8/9/2001 | 8/10/2001 | 8/10/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 07:56:11. Contact: 85088030.
not all the way done w/ framing corrections but ok to start rocking unaffected areas. 8/10/2001 4:11:55 PM
|
BLD-Framing/Rough-in | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | FAIL |
Dave Hannah
|
|
|
###-####- ALLAN FR INSP 8/7/2001 9:38:14 AM 8/7/2001 10:50:16 AM c/n on site ok to insulate 8/7/2001 10:53:01 AM
|
BLD-Framing/Rough-in | 8/1/2001 | 8/6/2001 | 8/6/2001 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 11:30:52. Contact: ###-####.--PER BETTY CANCEL
|
BLD-Framing/Rough-in | 8/1/2001 | 8/2/2001 | 8/1/2001 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 11:03:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/01/2001 at 11:28:30.
|
BLD-Framing/Rough-in | 6/14/2001 | 6/15/2001 | 6/15/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/14/2001 at 13:35:30. Contact: ###-####.no plans 6/15/2001 9:13:47 AM
|
BLD-Framing/Rough-in | 6/15/2001 | 6/15/2001 | 6/15/2001 | P | PART |
Tony Young
|
|
|
shear
ext. shear ok 6/15/2001 3:09:04 PM
|
BLD-Framing/Rough-in | 6/8/2001 | 6/11/2001 | 6/11/2001 | A | PART |
Dave Hannah
|
|
|
shear nailing ted ###-#### ext panel nailing looks good but hold downs need to have engineer come out and make so changes 6/11/2001 10:43:26 AM
|
BLD-Aging Inspection | 5/16/2001 | 5/16/2001 | 5/16/2001 | | CANC |
Tony Young
|
|
|
This is an aging activity , ok 5/16/2001 8:28:31 AM
|
BLD-Foundation | 2/7/2001 | 2/8/2001 | 2/8/2001 | P | PART |
Tony Young
|
|
|
###-####
wip 2/8/2001 2:31:09 PM
|
Override - Parcel Holds | | | 2/7/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 2/7/2001 | | |
|
|
|
|
BLD-Footing | 1/25/2001 | 1/26/2001 | 1/26/2001 | P | PART |
Tony Young
|
|
|
###-####
wip//verbal corrections on grade of footing depth to 12" 2/1/2001 9:28:24 PM
|
BLD-Grading Inspection | 1/26/2001 | 1/26/2001 | 1/26/2001 | P | PASS |
Rita DeYoung
|
|
|
Added by Inspector: 415 On 1/26/2001 2:11:38 PM ok per T.R. verbal via ph.
|
Override - Parcel Holds | | | 1/25/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/19/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/19/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 1/12/2001 | 1/12/2001 | 1/18/2001 | | PASS |
Dan Overy
|
|
|
1/18/2001 11:08:02 DJO - activity updated through activity BLDA022 from case BLD00-03627.
|
Plan Reviewer's activity | | | 1/18/2001 | | DONE |
|
|
|
spoke with ted mason about shear transfer to basement footing and log column engineering and connection details. have red-lined information into plan sets. calculations to be provided by frame inspection. united water has upgraded flow to eliminate sprinkler requirements. documentation will be provided to fire department.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/18/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/18/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/18/2001 | | DONE |
|
|
|
called permit ready
|
Plan Reviewer's activity | | | 1/17/2001 | | PEND |
|
|
|
received fax with calculations from engineer and ok to red line as long as it does not effect structural. still have questions about strap attachment thru basement frame wall and information on log products.
|
Case Summary (BLD) | | | 1/17/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 1/17/2001 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 1/16/2001 | | PEND |
|
|
|
spoke with Hutchinson Smith about engineering and plans not matching. will submit revisions and ok from engineer to correct calculations by red-line.
|
Plans ACCEPTED BY PLAN CHECK | | | 1/12/2001 | | |
|
|
|
|
Routing - PLANNING | 1/10/2001 | | 1/10/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/14/2000 | 12/14/2000 | 1/10/2001 | | PASS |
|
|
|
nw boise sewer district per lw/pe
|
Routing - PUBLIC WORKS GRADING | 12/14/2000 | 12/14/2000 | 1/9/2001 | | DONE |
Rita DeYoung
|
|
|
took to terry records 12/14/2000. Failed because grading plan needs corrections and soils report was incomplete. Sent letter explaining deficiencies. 12/20/00. Revised plans approved 1/9/00
|
Application received | | | 12/14/2000 | | |
|
|
|
|
Pending Assignment by DJO | 12/14/2000 | | | | PEND |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 1/11/2001 | | | | PEND |
|
|
|
|