Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD00-03634
StatusFinaled
Name FIRST BAPTIST CHURCH YOUTH CENTER
Site Address 1408 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To convert a 4,983 sq.ft. one story office building (with mechanical basement) to a youth activity center with classrooms per approved plans on file and zoning certificate CZC00-00145. Work to include construction of interior non-bearing walls to create new classroom & office areas; to relocate required second exit from south wall to the east wall; provide two accessible restrooms; install rated 2-hour parapet extension on north & west walls; Class "C" rof cover or better & drainage per Ch. 15; exit signage, egress illumination, panic hardware, electrical, mechanical & plumbing in compliance with adopted codes. (P.C.#1044-00)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/14/200012/14/20002/20/2003 DONE
BLD-Aging Inspection1/22/20031/22/20031/22/2003 PASS
DetailsCarl Dependahl
previously finalled by 415 & 409 1/22/2003 9:16:05 AM
DOC - Permit Finaled1/22/20031/22/20031/22/2003APASS
DetailsCarl Dependahl
Finaled by inspector at 1/22/2003 9:16:07 AM
BLD-Final4/24/20024/25/20024/25/2002PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 04/24/2002 at 16:56:37. Contact: ###-####.
pending all trades 4/25/2002 2:45:27 PM
BLD-Final2/27/20022/27/20022/27/2002PFAIL
DetailsCarl Dependahl
ken ###-####; need ACHD, arch's letter re asbuilt landing ( has other ADA compliant entry...also, add'l work. proposed at main entry at rear.) provide 18"for ADA toilet to wall at mens room. 2/27/2002 3:16:58 PM
FIRE-Final Inspection2/7/20022/7/20022/7/2002PPASS
DetailsRick Jackson
###-#### KEN
BLD-Aging Inspection12/18/200112/18/200112/18/2001 NR
DetailsCarl Dependahl
awaiting fire, etc. 12/20/2001 6:53:26 PM
BLD-Aging Inspection10/16/200110/16/200110/16/2001 NR
DetailsCarl Dependahl
spoke w/ Ken Grover...locks to be in by 11-1-01...obtain all finals for occupancy or notice to be issued. Time Zone is church youth center. 10/16/2001 10:13:10 AM
BLD-Aging Inspection8/16/20018/16/20018/16/2001 PASS
DetailsCarl Dependahl
wip per Ken 8/16/2001 10:47:18 AM
BLD-Footing8/16/20018/16/20018/16/2001ACANC
DetailsCarl Dependahl
Added by Inspector: 340 On 8/16/2001 10:44:07 AM
BLD-Conference8/16/20018/16/20018/16/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/16/2001 10:46:51 AM w/ Ken re final status...need call for reinsp's.
BLD-Conference6/15/20016/15/20016/15/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/15/2001 10:20:57 AM w/ owner's rep... need all finals prior to occupancy
Code Occupancy Approval  6/5/2001 PASS
Passed today.
FIRE-Final Inspection6/4/20016/4/20016/4/2001PFAIL
DetailsRick Jackson
###-#### door hardware and repair exit sign 6/4/2001 1:45:26 PM
BLD-Conference5/31/20015/31/20015/31/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/31/2001 9:54:34 AM w/ Ken, church proj mgr...need all other finals as req'd for occupancy.
BLD-Conference5/31/20015/31/20015/31/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/31/2001 1:09:41 PM w/ Ken, proj. mgr....have card signed off or verify approvals for occupancy.
BLD-Aging Inspection5/21/20015/21/20015/21/2001 FAIL
DetailsCarl Dependahl
called 5/21/2001 5:23:16 PM
BLD-Conference3/21/20013/21/20013/21/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/21/2001 12:12:33 PM w/ Pastor at site, removed urethane foam at lid; ok
BLD-Framing/Rough-in3/14/20013/15/20013/15/2001APART
DetailsTony Young
###-#### grouting at 11:30
wip, grouting before 11:00 verbal conference w/ contractor, corrections taken care of, ok to continue, pending S. I. reort on eppoxy dowels. 3/15/2001 11:36:33 AM
BLD-Framing/Rough-in3/15/20013/15/20013/15/2001PPART
DetailsCarl Dependahl
Ken Grover ###-#### ok to cover int walls, urethane removed from lid 3/15/2001 4:02:30 PM
BLD-Conference3/13/20013/13/20013/13/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/13/2001 6:38:52 PM ok to coverint partitions...submit for new clg & protection for interior per ch. 26.
BLD-Framing/Rough-in3/5/20013/6/20013/6/2001AFAIL
DetailsCarl Dependahl
###-####; c/n, fireblocks, insul. face paper exposed at "plenum", need specs for monokote for thermal barrier & foam sprayed at lid...complete 2hr parapet. 3/6/2001 11:51:21 AM
Issue PAID IN FULL permit  2/21/2001 DONE
Plan assigned to (DRS)12/15/2000 2/20/2001 PASS
DetailsDan Stuart
2/20/2001 06:37:57 DRS - activity updated through activity BLDA022 from case BLD00-03634.
Routing - PLAN CHECK2/2/2001 2/20/2001 PASS
Re-submittal complete. Routing to permit desk for issuance. Note on plans concerning possible use of foamed plastics within the "Gathering Place" exposed ceiling area & review with Margie Kennedy, Armstrong Arch.
PLANS/APPL TAKEN TO FRONT DESK  2/20/2001 PASS
To permit desk to issue.
Inspection Record Card- Bld  2/20/2001 DONE
Print Occupancy Form  2/20/2001 DONE
Telephone call  2/20/2001 DONE
talked to margie kennedy to verify plans are ready
Plan resubmittals received  2/14/2001 DONE
Received three copies of revised sheets A1.0, A2.0, A3.0, A4.0, structural calcs. and spray insulation specs. Routed to Dan S. KMM
Routing - FIRE1/30/2001 2/2/2001 PASS
Plan Review Completed(1st rev)  2/2/2001 FAIL
Plan resubmittals received  1/31/2001 DONE
Received three copies of revised sheets A2.0 and A4.0. Routed to Dan S. KMM
Routing - PLAN CHECK12/19/2000 1/30/2001 FAIL
Resubmittals & clarification required. Copy to architect for response with plans routed to fire code analyst for review.
Plan resubmittals requested  1/30/2001 FAIL
Resubmittals required.
Routing - PUBLIC WORKS12/15/2000 12/19/2000 PASS
Routing - PLANNING12/19/2000 12/19/2000 PASS
Approved per CZC00-145.
Pending Assignment by MYS12/15/2000 12/15/2000 DONE
DetailsMarlene Southard
Application received  12/14/2000  
Recd Pcfee & Taken To Pln CK  12/14/2000 DONE