BLD-Final | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PASS |
Dave Hannah
|
|
|
Terry ###-#### 5/18/2001 9:16:37 AM c.c.#20344 issued 5/18/2001 9:22:04 AM
|
DOC - Permit Finaled | 5/18/2001 | 5/18/2001 | 5/18/2001 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 5/18/2001 9:22:10 AM
|
BLD-Final | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/15/2001 at 16:57:34. Contact: . need a elec and a mec final 5/16/2001 11:09:22 AM
|
BLD-Final | 4/12/2001 | 4/13/2001 | 4/13/2001 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/12/2001 at 14:41:32. Contact: . Disp set to [CANC] by a contractor via Hello! on 04/13/2001 at 10:56:01.
|
BLD-Wall cover | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 11:59:35. ok to cover, received engineering on grider truss in garage per plan reviewer request, indicating this will carry load of bonus and roof. 2/22/2001 11:36:57 AM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 14:31:03. Contact: . c/n posted on site. 2/21/2001 11:05:23 AM
|
BLD-Framing/Rough-in | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 15:40:58. Contact: .Mechanical needed--no approved plans on site. 2/20/2001 9:17:58 AM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 10:50:13. Contact: . Mechanical rough in not completed. 2/20/2001 2:26:07 PM
|
BLD-Other | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 14:06:45. Contact: . Shear OK---Ok to side. 2/13/2001 10:07:24 AM
|
BLD-Other | 2/6/2001 | 2/7/2001 | 2/7/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 13:49:01. Contact: .c/n issued--hd straps not nailed, many shear panels not stapled per plans, staples needed above hd straps, site address needs posted. 2/7/2001 2:49:55 PM
|
BLD-Foundation | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Steven Webb
|
|
|
Mana ###-#### Appears ok, not totally ready for concrete at time of inspection, hd not inplace. 1/17/2001 3:48:48 PM
|
Override - Parcel Holds | | | 1/17/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/17/2001 | | |
|
|
|
|
BLD-Footing | 1/16/2001 | 1/16/2001 | 1/16/2001 | P | PART |
Steven Webb
|
|
|
setback & 1/16/2001 3:07:57 PM soil conditions ok, reviewed rebar & HD with contractor. 1/16/2001 3:08:33 PM
|
Override - Parcel Holds | | | 1/16/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/16/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/16/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/16/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/16/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 1/8/2001 | 1/8/2001 | 1/8/2001 | | PASS |
|
|
|
house on different lot.
|
MISC ACTIONS | | | 1/8/2001 | | DONE |
|
|
|
Steve took plans they are changing the lot a new card will need to be printed. AJC
|
Inspection Record Card- Bld | | | 1/3/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/3/2001 | | DONE |
|
|
|
called permit ready
|
Plan Reviewer's activity | | | 1/2/2001 | | DONE |
|
|
|
received reduced plan sets indicating where all SS-1 thru SS-6 shear panels are located.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 12/27/2000 | | 1/2/2001 | | PASS |
Steve Munroe
|
|
|
1/2/2001 16:20:59 DJO - activity updated through activity BLDA022 from case BLD00-03641.
|
Pending Assignment by DJO | 12/15/2000 | | 12/27/2000 | | DONE |
Dan Overy
|
|
|
12/27/2000 09:30:17 SAM - activity updated through activity BLDA183 from case BLD00-03641.
|
Routing - PUBLIC WORKS | 12/15/2000 | 12/15/2000 | 12/15/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 12/15/2000 | 12/15/2000 | 12/15/2000 | | PASS |
|
|
|
|
Application received | | | 12/15/2000 | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Routing - PLAN CHECK | 12/15/2000 | | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/27/00 10:20 I called and left a message for Dale Swink, the engineer. I need to ask him where the walls are that he indicated in his engineering. I then called and left a message for Bill Thorton that I called Dale.
10:45 Dale called me back and said I need to call Bill.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/27/00 11:50 Talked to Bill about the question I had. (truss bearing, garage header size, getting engineered drawings and who did the BC drawings) Bill will get the engineered drawings from Dale and bring in and give to Dan O.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|