Permit Information
Permit NumberBLD00-03645
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 1352 S EAGLE FLIGHT WAY
Project NamePINTAIL CENTER
Customer Number 
ePlanReviewNo
Description
(MICRON TECHNOLOGY INFORMATION SYSTEMS) This building is fire sprinklered for unlimited building area. To construct interior improvements within a 37,300 square foot office space. Work is to include interior nonbearing walls, 4 restrooms accessible to the disabled, 1 shower room accessible to the disabled, interior doors, interior windows, an electrical duct system in the floor, and suspended ceilings all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-1046-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/27/2009  
Case Summary (BLD)  4/27/2009  
Fee Review-notes12/15/200012/15/20004/19/2001 DONE
DOC - Permit Finaled4/5/20014/5/20014/5/2001PPASS
DetailsRuss Owen
Added by Inspector: 407 On 4/5/2001 2:27:58 PM oc perm oc
FIRE-Final Inspection4/4/20014/5/20014/5/2001PPASS
DetailsJoe Tawney
JC ###-#### Reinsp OK for permanant occupancy 4/5/2001 6:10:15 PM
BLD-Final4/4/20014/5/20014/5/2001PPASS
DetailsRuss Owen
###-####
Permanent Occupancy 4/5/20014/5/2001 DONE
Details
Permanent occupancy  4/5/2001 DONE
Perm. Occ. Cert. #8622 issued 4-5-01 to Micron Technology, Inc.
BLD-Final4/5/20014/4/20014/4/2001PFAIL
DetailsJoe Tawney
Added by Inspector: 406 On 4/5/2001 8:30:30 AM Final Fail C/N issued
BLD-Other3/20/20013/20/20013/20/2001PPASS
DetailsRuss Owen
Scheduled by Inspector: 407 On 3/20/2001 11:56:30 AM grid. 3/20/2001 1:55:39 PM
BLD-Framing/Rough-in3/15/20013/19/20013/19/2001PNR
DetailsRuss Owen
###-####
BLD-Other3/6/20013/7/20013/7/2001PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/06/2001 at 09:57:06. Contact: ###-####.
BLD-Other2/22/20012/23/20012/23/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/22/2001 at 10:45:56. Contact: ###-####.east side of building ok grid. 2/23/2001 11:11:37 AM
BLD-Other2/20/20012/22/20012/22/2001ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/20/2001 at 08:48:43. Contact: ###-####.will recall . 2/22/2001 10:13:45 AM
BLD-Framing/Rough-in2/9/20012/12/20012/12/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/09/2001 at 15:20:25. Contact: ###-####.ok to complete all rock. 2/12/2001 12:35:33 PM
BLD-Framing/Rough-in2/5/20012/6/20012/6/2001PPART
DetailsRuss Owen
interior non bearing walls ok to cover. 2/6/2001 5:12:40 PMonly small office section left 90 percent complete. 2/6/2001 5:13:09 PM
BLD-Framing/Rough-in1/26/20011/29/20011/29/2001APART
DetailsRuss Owen
JC ###-####ok to cover east portion of area A. with rock no ceiling grid at this time. 1/29/2001 11:13:27 AM
BLD-Framing/Rough-in1/26/20011/26/20011/26/2001APART
DetailsRuss Owen
Added by Inspector: 407 On 1/26/2001 12:15:26 PM partial inspection of the planed 3 phase interior,left east side at this time,no approved plans on site will recall for inspection on 1/29/01.
Inspection Record Card- Bld  1/24/2001 DONE
Print Occupancy Form  1/24/2001 DONE
Issue & PRINT to be Invoiced  1/24/2001 DONE
Routing - PLAN CHECK1/16/2001 1/23/2001 PASS
Passed 2nd UBC plan review, with conditions.
Plan assigned to (CJW)12/19/2000 1/23/2001 PASS
DetailsCarl Westfall
1/23/01 12:53:49 CJW - activity updated through activity BLDA022 from case BLD00-03645.
PLANS/APPL TAKEN TO FRONT DESK  1/23/2001 PASS
Plan resubmittals received  1/22/2001 DONE
Received plan resubmittals from Richard Kizer of Power Engineers, two sets , forwarded same to Carl Westfall. 1/22/01 DAR
Routing - PLUMBING1/16/2001 1/16/2001 PASS
Plan Review Completed(1st rev)  1/12/2001  
Failed first UBC plan review.
Routing - FIRE1/8/2000 1/12/2001 PASS
Routing - PLAN CHECK12/22/2000 1/8/2001  
Failed first UBC plan review.
Plan Reviewer's activity  12/28/2000  
Failed first UBC plan review. UBC plan review started December 28, 2000 and finished December 29, 2000. A response from the architect was required. See the conditions list.
Routing - PUBLIC WORKS12/19/2000 12/22/2000 PASS
Print Pending Permit.LaserJet4  12/19/2000 DONE
Pending Assignment by MYS12/19/2000 12/19/2000 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  12/15/2000 DONE
Received Certificate of Value  12/15/2000 DONE
Application received  12/15/2000  
Plan Review Report