Permit Information
Permit NumberBLD00-03671
StatusFinaled
Name STEIN DISTRIBUTING
Site Address 601 N PHILLIPPI ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel a 4,883 sq.ft. area within the interior of the existing warehouse area to convert from uncooled to cooled space per approved plans on file. Work to include adding insulated wall panels, insulating roof, mechanical refrigeration equipment with structural supports and upgrade the electrical service. Adding 3-hr fire door assemblies to the existing four hour area separatioin wall and upgrading area separation wall, new roofing, Existing building area noted by architect as 50,177 sq.ft. This building does NOT have fire sprinklers. OWNER HAS AGREED TO ADD FIRE SPRINKLERS TO THE BUILDING WITHIN A FIVE YEAR PLAN TO MEET FIRE DEPARTMENT REQUIREMENT FOR HIGH PILED STORAGE, THIS AGREEMENT IS ON FILE AND SIGNED BY THE OWNER AND DAVE MILLER. (P.C.#1059-00)*RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/19/200012/19/20001/18/2002 DONE
Letter of compliance  12/26/2001 DONE
Letter of Compliance #22092 issued 12-26-01.
BLD-Aging Inspection12/24/200112/24/200112/24/2001 PART
DetailsTom Arcoraci
ok for perm occ 12/26/2001 8:28:03 AM 12/26/2001 8:37:02 AM
BLD-Aging Inspection10/22/200110/22/200110/22/2001 PASS
DetailsTom Arcoraci
done 10/22/2001 9:29:39 AM
BLD-Final8/17/20018/20/20018/20/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/17/2001 at 10:21:37. Contact: ###-####. ok for perm occ 8/19/2001 10:58:37 PM
FIRE-Final Inspection8/8/20018/8/20018/8/2001PPASS
DetailsJoe Tawney
Added by Inspector: 406 On 8/8/2001 3:03:51 PM Reinsp OK for certificate of completion
FIRE-Conference7/31/20018/1/20018/1/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 8/1/2001 10:58:40 AM
BLD-Framing/Rough-in7/30/20017/31/20017/31/2001PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/30/2001 at 15:52:26. Contact: ###-####. need letter from struc eng for struc observation 7/31/2001 2:40:32 AM
BLD-Final7/30/20017/31/20017/31/2001PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/30/2001 at 15:52:59. Contact: ###-####. needs fire insp 7/31/2001 2:39:45 AM
BLD-Framing/Rough-in7/30/20017/31/20017/30/2001ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/30/2001 at 14:31:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/30/2001 at 15:50:39.
BLD-Final7/30/20017/31/20017/30/2001ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/30/2001 at 14:32:31. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/30/2001 at 15:51:13.
BLD-Aging Inspection6/4/20016/4/20016/4/2001 PASS
DetailsTom Arcoraci
WIP 6/5/2001 8:05:41 AM
BLD-Framing/Rough-in3/30/20014/2/20013/30/2001PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/30/2001 at 14:44:50. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/30/2001 at 16:34:26.
Plan assigned to (R_H)12/20/2000 3/23/2001 PASS
Details
3/23/2001 13:53:34 RMH - activity updated through activity BLDA022 from case BLD00-03671.
Routing - PLAN CHECK3/14/2001 3/23/2001 PASS
DetailsRon Hill
Case Summary (BLD)  3/23/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/23/2001 PASS
DetailsRon Hill
Inspection Record Card- Bld  3/23/2001 DONE
Print Occupancy Form  3/23/2001  
Issue PAID IN FULL permit  3/23/2001 DONE
Routing - FIRE3/14/20013/14/20013/14/2001 PASS
PER DAVE MILLER'S AGREEMENT - SPRINKLER SYSTEM INSTALLED BY MARCH, 2006
Plan resubmittals received  3/14/2001 FAIL
Received two copies of reviesed sheets 1, 2, 3, 5 and 8A. However they were not signed. Contacted CH2MHILL to have them signed. Plans signed and returned.Forwarded to Jason Blais. 3/19/01 DAR
Plan resubmittals received  3/14/2001 DONE
Received two copies of response to review letter, supplemental calculations, refrigenant system analyses and factory information on insulated sandwich panels. Routed to Ron Hill
Routing - FIRE1/23/2001 2/2/2001 PASS
Plan Review Completed(1st rev)  2/2/2001 FAIL
Routing - PLAN CHECK12/22/2000 1/23/2001 HOLD
faxed requirements to the architect, larry fettkether, on 01-23-01, I am holding plans until I receive response from arhcitect. RMH
Plan Reviewer's activity  1/22/2001 FAIL
DetailsRon Hill
faxed & mailed requirements to the architect, I am holding the plans until I receive resonse from architect.
Application received  1/22/2001 DONE
Additional plans submitted  1/19/2001 DONE
Received two copies of Drawing sheets A-1, A-2 and A-3 from 1976 warehouse addition. Two copies of title block with Boise City plan review number from 1976 warehouse addition. Two copies of parcel number plan fpr warehouse location.
Two copies of electrical panel schedules for the current. work. Routed to Ron Hill. KMM
Routing - PUBLIC WORKS12/20/2000 12/22/2000 PASS
Pending Assignment by MYS12/19/2000 12/20/2000 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  12/20/2000 DONE
Waiting for Cert. of Value  12/19/2000 DONE