Fee Review-notes | 12/20/2000 | 12/20/2000 | 11/9/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/26/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8840 issued 9-26-01 to Met Life in the Waterfront Bldg.
|
Permanent Occupancy | | 9/21/2001 | 9/21/2001 | | DONE |
|
|
|
|
BLD-Final | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/21/2001 at 10:13:50. Contact: ###-####.
|
BLD-Final | 9/20/2001 | 9/20/2001 | 9/20/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/20/2001 4:07:48 PM Reinsp OK for permanant occupancy
|
BLD-Aging Inspection | 8/20/2001 | 8/20/2001 | 8/20/2001 | | PASS |
Tony Young
|
|
|
wip 8/20/2001 11:54:37 AM
|
BLD-Aging Inspection | 6/18/2001 | 6/18/2001 | 6/18/2001 | | PASS |
Tony Young
|
|
|
wip 6/18/2001 8:47:10 AM
|
BLD-Conference | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Joe Tawney
|
|
|
Scheduled by Inspector: 406 On 4/17/2001 5:08:34 PM Delivered C/N requested by contr 4/18/2001 11:25:38 AM
|
FIRE-Final Inspection | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | FAIL |
Joe Tawney
|
|
|
. 4/3/2001 5:36:28 PM Reinsp Fail Spklr heads overspaced 4/3/2001 5:36:49 PM
|
FIRE-Final Inspection | 3/21/2001 | 3/22/2001 | 3/22/2001 | A | PART |
Joe Tawney
|
|
|
Reinsp OK for temporary occupancy. 3/22/2001 12:53:41 PM
|
BLD-Final | 3/21/2001 | 3/22/2001 | 3/22/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 15:20:18. Contact: . ok for perm occ after fire signs perm occ 3/22/2001 2:19:34 PM
|
BLD-Conference | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 3/9/2001 12:43:28 PM Adv contr via note on existing C/N that Omega S/W heads have been recalled and must be replaced.
|
FIRE-Final Inspection | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | FAIL |
Joe Tawney
|
|
|
3/7/2001 1:09:54 PM Final Fail C/N issued 3/8/2001 8:18:30 AM
|
BLD-Other | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 16:30:14. Contact: .
ceiling grid 2/16/2001 10:38:44 AM
|
BLD-Framing/Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 12:27:18. Contact: .
ok to cover interior walls, need to see demising wall and ceiling grid later 2/7/2001 12:15:19 PM
|
Issue PAID IN FULL permit | | | 2/2/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/25/2001 | | 1/30/2001 | | PASS |
|
|
|
Approved drawings, with conditions, after response from the architect. The owner has agreed to apply for a permit to upgrade the restrooms within this portion of the building (Building "A") by January 22, 2003.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2001 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 1/30/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/30/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/30/2001 | | DONE |
|
|
|
LEFT MESS FOR DOUG STORKY THAT PERMIT IS READY
|
Plan assigned to (CJW) | 12/21/2000 | | 1/30/2001 | | PASS |
Carl Westfall
|
|
|
1/30/01 09:47:54 CJW - activity updated through activity BLDA022 from case BLD00-03682.
|
Routing - FIRE | 1/19/2001 | | 1/25/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/25/2001 | | |
|
|
|
Failed first UBC plan review.
|
Routing - PLAN CHECK | 12/22/2000 | | 1/19/2001 | | |
|
|
|
Failed first UBC plan review.
|
Plan Reviewer's activity | | | 1/18/2001 | | |
|
|
|
UBC plan review was started January 18, 2001 and finished the next day. A response from the architect was required. See the conditions list.
|
Routing - PUBLIC WORKS | 12/21/2000 | | 12/22/2000 | | PASS |
|
|
|
|
Pending Assignment by MYS | 12/20/2000 | | 12/21/2000 | | DONE |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/21/2000 | | DONE |
|
|
|
plans not dimensioned.
|
Received Certificate of Value | | | 12/20/2000 | | DONE |
|
|
|
|
Application received | | | 12/20/2000 | | |
|
|
|
|