Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03684
StatusFinaled
Name TRADEWINDS BUILDING COMPANY
Site Address 4880 E ARROW JUNCTION DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1843 sq. ft. two story single family dwelling with a 512 sq. ft. attached two car garage, a 130 sq. ft. covered entry porch and a 160 sq. ft. concrete patio at side of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1062 sq. ft.)(2nd floor 781 sq. ft.) PC #1070 DJO CUP #98-0116 (job #99-1540)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/28/20013/29/20013/29/2001ACANC
DetailsSteven Webb
###-#### Cancel by contractor 3/29/2001 9:29:57 AM
BLD-Final3/29/20013/29/20013/29/2001PPASS
DetailsSteven Webb
Rick ###-#### C. Of C. # 21415 issued. 3/29/2001 12:36:30 PM
DOC - Permit Finaled3/29/20013/29/20013/29/2001PPASS
DetailsSteven Webb
Added by Inspector: 420 On 3/29/2001 12:36:54 PM
BLD-Final3/27/20013/28/20013/28/2001AFAIL
DetailsSteven Webb
Rick ###-#### C/n on site--rim joist needs insulation, pipe protection in garage. 3/28/2001 12:14:21 PM
BLD-Energy code compliance2/28/20013/1/20013/1/2001PPART
DetailsSteven Webb
###-####: Ok to cover--Energy report needed prior to final. 3/1/2001 1:53:41 PM
BLD-Framing/Rough-in2/28/20012/28/20012/28/2001PPART
DetailsSteven Webb
###-#### Ok to insulate--Need to verify bci repair above kitchen at energy. 2/28/2001 1:44:43 PM
BLD-Framing/Rough-in2/26/20012/27/20012/27/2001PFAIL
DetailsSteven Webb
###-####C/N posted on site--do not insulate. 2/27/2001 3:23:58 PM
BLD-Other2/19/20012/20/20012/20/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/19/2001 at 16:06:32. Contact: ###-####.
BLD-Wall cover2/20/20012/20/20012/20/2001AFAIL
DetailsSteven Webb
Scheduled by Inspector: 420 On 2/20/2001 10:51:13 AM
BLD-Framing/Rough-in2/20/20012/20/20012/20/2001PPASS
DetailsSteven Webb
###-#### ok to side. 2/20/2001 1:38:06 PM
BLD-Framing/Rough-in2/14/20012/15/20012/15/2001ACANC
DetailsSteven Webb
###-####: cancelled by contractor 2/15/2001 9:07:56 AM
BLD-Foundation1/23/20011/24/20011/24/2001PPART
DetailsSteven Webb
###-####hd not installed at time of inspection 1/24/2001 1:14:06 PM
BLD-Footing1/22/20011/23/20011/23/2001PPART
DetailsSteven Webb
###-#### setbacks ok, reviewed rebar and HD. 1/23/2001 3:11:49 PM
Issue PAID IN FULL permit  1/22/2001 DONE
Plan assigned to (DJO)1/3/20011/3/20011/19/2001 PASS
DetailsDan Overy
1/19/2001 07:20:58 DJO - activity updated through activity BLDA022 from case BLD00-03684.
Plan Reviewer's activity  1/19/2001 DONE
received two sets of revised plans on 01-17-2001. (job #99-1540). elevations incorrect. spoke with ted martinez at front counter just before lunch on 01-18-2001. i will modify plans this time only in order to permit this structure. mr. martinez advises me that he has changed designers. (robert pedersen)(dakota design)
Print Pending Permit.LaserJet4  1/19/2001 DONE
Plan Review Report  1/19/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/19/2001 DONE
Inspection Record Card- Bld  1/19/2001 DONE
Telephone call  1/19/2001 DONE
Plan Reviewer's activity  1/4/2001 PEND
have spoken with riley mahaffey (structural engineer) about differences between his calculations and what is indicated on plans. will bring in his files 01-05-2001 for comparison. will advise builder.
Plan Reviewer's activity  1/3/2001 PEND
plans still do not comply. missing brg., holdown locations are to be verified, plans are not to scale, floor framing is not complete, nailing schedules need clarification (3 out of 4 are identical), elevations do not match floor plans, various areas of structure do not meet wall bracing and/or are not called out, all beams and headers to be indicated and seperation not met between garage/house area.
Plan Reviewer's activity  1/3/2001 PEND
plans rejected 12-14-2000. at this time correction list was supplied to builder. plans were accepted 12-21-2000.
Plans ACCEPTED BY PLAN CHECK  1/3/2001  
Routing - PUBLIC WORKS12/21/200012/21/200012/21/2000 PASS
Routing - PLANNING12/21/200012/21/200012/21/2000 PASS
Application received  12/21/2000  
Routing - PLAN CHECK12/21/200012/21/2000  PEND
Pending Assignment by DJO12/21/2000   PEND
DetailsDan Overy