Case Summary (BLD) | | | 10/12/2009 | | |
|
|
|
|
Permanent occupancy | | | 6/27/2002 | | DONE |
|
|
|
perm. Occ. Cert. #9229 issued 6-27-02 to the Boise First Church of the Nazarene.
|
Permanent Occupancy | | 6/19/2002 | 6/19/2002 | | DONE |
|
|
|
|
BLD-Final | 6/19/2002 | 6/19/2002 | 6/19/2002 | | DONE |
|
|
|
Final - ok for perm. occ.
|
CHANGE STATUS TO (ISS) | | | 6/17/2002 | | |
|
|
|
|
Fee Review-notes | 1/30/2002 | 1/30/2002 | 1/30/2002 | | DONE |
|
|
|
3/12-left mesg. w/julie @ esi 1/30 left mesg with esi
|
Temporary occupancy | | | 10/8/2001 | | DONE |
|
|
|
Temp. Occ. Cert. #4611 issued 10-8-01 to the Boise First Church of the Nazarene.
|
FIRE-Final Inspection | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PASS |
Joe Tawney
|
|
|
OK for perm. occ. 10/5/2001 3:22:06 PM 10/5/2001 3:22:45 PM
|
BLD-Final | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 15:16:03. Contact: ###-####.
|
BLD-Final | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | PART |
Jim Sly
|
|
|
Jim Martin, ###-#### : ) OK for Temp Occ. 10/5/2001 3:56:10 PM
|
FIRE-Final Inspection | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 12:41:51. Contact: ###-####.
|
BLD-Final | 10/3/2001 | 10/4/2001 | 10/4/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 13:58:16. Contact: ###-####. NR 10/4/2001 5:05:53 PM
|
FIRE-Final Inspection | 10/3/2001 | 10/4/2001 | 10/3/2001 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 12:49:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/03/2001 at 13:43:00.
|
BLD-Conference | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 10:01:32. Contact: ###-####. Continuing firestop insp. 9/27/2001 3:43:27 PM
|
BLD-Conference | 9/24/2001 | 9/24/2001 | 9/24/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 06:00:53. Contact: ###-####. Walk thru.....firestopping. 9/24/2001 12:20:31 PM
|
BLD-Conference | 9/19/2001 | 9/19/2001 | 9/19/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 06:09:21. Contact: ###-####. C/N.....Firestop all penitr at 2hr floor/ceiling. Need approved labeling on both upper and lower Dutch type doors at corridor ..Label to be followed by the letter "S" l 9/19/2001 2:18:21 PM
|
BLD-Conference | 9/11/2001 | 9/12/2001 | 9/12/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 13:33:20. Contact: ###-####. Preliminary Walk Thru with Joe Tawney....Noted to superintendant of several code issues. 9/12/2001 1:29:39 PM
|
BLD-Conference | 9/7/2001 | 9/10/2001 | 9/10/2001 | P | PART |
Jim Sly
|
|
|
for conf-- jim martin -###-#### Check fire joint spray and check fire and smoke for ceiling painting. 9/10/2001 2:41:33 PM
|
CHANGE STATUS TO (ISS) | | | 9/7/2001 | | DONE |
|
|
|
expired permit by joe tawney/?????should not be expired/??? /mls
|
FIRE-Conference | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Joe Tawney
|
|
|
Conf with contr regarding FD access signs and striping 9/6/2001 11:51:13 AM
|
DOC - Permit Expired | 9/6/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Joe Tawney
|
|
|
Expired by inspector at 9/6/2001 8:24:39 AM
|
DOC - Permit Expired | 9/6/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Joe Tawney
|
|
|
Expired by inspector at 9/6/2001 8:24:40 AM
|
BLD-Conference | 9/4/2001 | 9/5/2001 | 9/5/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 16:59:40. Contact: ###-####. Recheck fire joint spray. 9/5/2001 3:20:07 PM
|
BLD-Conference | 8/28/2001 | 8/28/2001 | 8/28/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/28/2001 at 10:04:15. Contact: ###-####. Checking class 1 duct and shaft. 8/28/2001 4:44:30 PM
|
BLD-Framing/Rough-in | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | FAIL |
Jim Sly
|
|
|
Added by Inspector: 316 On 8/27/2001 12:24:48 PM Remove drywall to allow for insp of grease ducts. Remove material and rebuild grease ducts to meet req. for clearances ( 3" min 12" max ) per chpter 5 (97) UMC and call for insp.
|
BLD-Framing/Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 | P | CANC |
Jim Sly
|
|
|
Added by Inspector: 316 On 8/22/2001 2:32:13 PM C/N....Provide flame spread/smoke density rating for textile speaker (type) fabric, ceiling reflector panels, carpet and all combustible interior finishes.
|
BLD-Conference | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PART |
Jim Sly
|
|
|
Jim Martin, ###-#### - early, if possible : ) Reveiwed prev corr notices...C/N...Painting of "spray Fireproofing" to meet all Req of chapter 8. 8/15/2001 11:23:29 AM
|
BLD-Wall cover | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | FAIL |
Jim Sly
|
|
|
Jim Martin, ###-#### : ) C/N....Zone 3....Firestopping, Plan Mod. at storage and audio rooms Including wall Rating changes involving Dampers. Need completion of 1hr rating at large Electr panels, Check Req. for wood floor projection room. 7/24/2001 12:47:41 PM
|
FIRE-Conference | 7/3/2001 | 7/5/2001 | 7/5/2001 | A | PASS |
Joe Tawney
|
|
|
Conf with Jim Martin contr regarding smoke detectors in bldg 7/5/2001 11:29:33 AM
|
Inspection Record Card- Bld | | | 6/29/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/29/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/29/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/29/2001 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/27/2001 | | DONE |
|
|
|
i don't know why but the status did not change...
|
BLD-Wall cover | 6/21/2001 | 6/22/2001 | 6/22/2001 | A | PART |
Jim Sly
|
|
|
Jim, ###-#### : ) OK to cover zone 4 and 5. 6/22/2001 9:58:42 AM
|
Receive PAYMENT IN FULL PRINT | | | 6/22/2001 | | DONE |
|
|
|
|
BLD-Wall cover | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PART |
Jim Sly
|
|
|
Jim, ###-#### : ) C/N..Zone 4&5.....Firestop electr 24" Corridors, Provide listing (rating) for 8x8" box at Corridor, fasten gyp, complete fire prot of columns, re-install fireproofing where removed....Special insp Req. 6/21/2001 9:09:44 AM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 5/25/2001 | | 6/21/2001 | | PASS |
Mike Otto
|
|
|
6/21/2001 13:10:40 MLO - activity updated through activity BLDA022 from case BLD00-03711.
|
Routing - PLAN CHECK | 6/8/2001 | | 6/21/2001 | | PASS |
|
|
|
Plan Modification dated May 25, 2001
|
BLD-Conference | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | PART |
Jim Sly
|
|
|
Jim, ###-#### : ) 1st insp of firestoppng at zone 1.....OK to finish 6/12/2001 10:50:48 AM
|
Plan Modification Accepted | | | 6/8/2001 | | |
|
|
|
Plan Modification originally assigned to incorrrect set of plans. Application indicated that plan modification applied to BLD 00-02246 the builsing and shell permit, when it really applied to BLD00-03711 the Tenant Improvement.
|
BLD-Framing/Rough-in | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | PART |
Jim Sly
|
|
|
Framing OK...Zone 2.....C/N for E.I.F.S. Install and rating. 6/5/2001 9:47:53 AM
|
CHANGE STATUS TO (ISS) | | | 6/4/2001 | | DONE |
|
|
|
|
BLD-Conference | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 09:18:46. Contact: ###-####. Verify gyp column protection per listing. 6/1/2001 10:36:48 AM
|
BLD-Conference | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/18/2001 at 11:46:42. Contact: ###-####. Discussion on Fire stopping, fire protection columns, smoke density/flame spread ratings Etc. 5/21/2001 11:18:31 AM
|
BLD-Wall cover | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/15/2001 at 09:25:19. Contact: ###-####. Frame insp of Zone 1.....C/N....Need OK from Eng for holes cut in CMU wall for HVAC. Need smoke dens/flame sp for comb. Need screw schedule for gyp at Corridors. OK to rock Zone 1. 5/15/2001 3:04:25 PM
|
BLD-Conference | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/11/2001 at 10:49:46. Contact: ###-####. Walked job....Discussed firestopping at Corridors. 5/11/2001 4:29:32 PM
|
BLD-Conference | 4/24/2001 | 4/25/2001 | 4/25/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 11:46:00. Contact: ###-####. Looked at proposed design for 2 HR shafts.....Need UL assmbly # and detail. 4/25/2001 1:21:33 PM
|
Issue PAID IN FULL permit | | | 3/12/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 12/28/2000 | | 3/8/2001 | | PASS |
Mike Otto
|
|
|
3/8/2001 10:30:04 MLO - activity updated through activity BLDA022 from case BLD00-03711.
|
Routing - PLAN CHECK | 2/26/2001 | | 3/8/2001 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/8/2001 | | DONE |
|
|
|
verified that new exterior stair on east side was ok with Planning per Scott Spijute. MLO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/8/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/8/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Routing Off Site - C.D.H | 3/1/2001 | | 3/1/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/23/2001 | | DONE |
|
|
|
Received plan resubmittals from Architecture Northwest, plus small documents, forwarded same to Mike Otto. 2/23/01 DAR
|
Plan Review Completed(1st rev) | | | 2/1/2001 | | FAIL |
|
|
|
plans returned to plan check
|
Routing - FIRE | 1/26/2001 | | 2/1/2001 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 1/26/2001 | | FAIL |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 1/8/2001 | | 1/26/2001 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 1/3/2001 | | 1/8/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/28/2000 | | 1/3/2001 | | PASS |
|
|
|
|
Pending Assignment by MYS | 12/28/2000 | | 12/28/2000 | | DONE |
Marlene Southard
|
|
|
|
Application received | | | 12/26/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/26/2000 | | DONE |
|
|
|
|