Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-03711
StatusFinaled
Name BOISE FIRST CHURCH OF THE NAZARENE
Site Address 3852 N EAGLE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
To complete the interior of a 65,906 sq.ft. church building inlcuding a new exterior stair on the east side per approved plans on file. Shell of structure built under permit BLD00-02246. This building's main assembly area is an A2.1 occupancy as well as the youth center on the second floor. Occupant loads are indicated on the approved plans. NOTE: This building is fully fire sprinklered for area increase, the main assembly room has a horizontal exit to the interior. (P.C.#1077) mlo
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/12/2009  
Permanent occupancy  6/27/2002 DONE
perm. Occ. Cert. #9229 issued 6-27-02 to the Boise First Church of the Nazarene.
Permanent Occupancy 6/19/20026/19/2002 DONE
Details
BLD-Final6/19/20026/19/20026/19/2002 DONE
Final - ok for perm. occ.
CHANGE STATUS TO (ISS)  6/17/2002  
Fee Review-notes1/30/20021/30/20021/30/2002 DONE
3/12-left mesg. w/julie @ esi 1/30 left mesg with esi
Temporary occupancy  10/8/2001 DONE
Temp. Occ. Cert. #4611 issued 10-8-01 to the Boise First Church of the Nazarene.
FIRE-Final Inspection10/4/200110/5/200110/5/2001APASS
DetailsJoe Tawney
OK for perm. occ. 10/5/2001 3:22:06 PM 10/5/2001 3:22:45 PM
BLD-Final10/4/200110/5/200110/5/2001ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/04/2001 at 15:16:03. Contact: ###-####.
BLD-Final10/5/200110/5/200110/5/2001PPART
DetailsJim Sly
Jim Martin, ###-#### : ) OK for Temp Occ. 10/5/2001 3:56:10 PM
FIRE-Final Inspection10/3/200110/4/200110/4/2001ACANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 10/03/2001 at 12:41:51. Contact: ###-####.
BLD-Final10/3/200110/4/200110/4/2001PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/03/2001 at 13:58:16. Contact: ###-####. NR 10/4/2001 5:05:53 PM
FIRE-Final Inspection10/3/200110/4/200110/3/2001PCANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 10/03/2001 at 12:49:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/03/2001 at 13:43:00.
BLD-Conference9/27/20019/27/20019/27/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/27/2001 at 10:01:32. Contact: ###-####. Continuing firestop insp. 9/27/2001 3:43:27 PM
BLD-Conference9/24/20019/24/20019/24/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/24/2001 at 06:00:53. Contact: ###-####. Walk thru.....firestopping. 9/24/2001 12:20:31 PM
BLD-Conference9/19/20019/19/20019/19/2001AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/19/2001 at 06:09:21. Contact: ###-####. C/N.....Firestop all penitr at 2hr floor/ceiling. Need approved labeling on both upper and lower Dutch type doors at corridor ..Label to be followed by the letter "S" l 9/19/2001 2:18:21 PM
BLD-Conference9/11/20019/12/20019/12/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/11/2001 at 13:33:20. Contact: ###-####. Preliminary Walk Thru with Joe Tawney....Noted to superintendant of several code issues. 9/12/2001 1:29:39 PM
BLD-Conference9/7/20019/10/20019/10/2001PPART
DetailsJim Sly
for conf-- jim martin -###-#### Check fire joint spray and check fire and smoke for ceiling painting. 9/10/2001 2:41:33 PM
CHANGE STATUS TO (ISS)  9/7/2001 DONE
expired permit by joe tawney/?????should not be expired/??? /mls
FIRE-Conference9/5/20019/6/20019/6/2001APASS
DetailsJoe Tawney
Conf with contr regarding FD access signs and striping 9/6/2001 11:51:13 AM
DOC - Permit Expired9/6/20019/6/20019/6/2001APASS
DetailsJoe Tawney
Expired by inspector at 9/6/2001 8:24:39 AM
DOC - Permit Expired9/6/20019/6/20019/6/2001APASS
DetailsJoe Tawney
Expired by inspector at 9/6/2001 8:24:40 AM
BLD-Conference9/4/20019/5/20019/5/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/04/2001 at 16:59:40. Contact: ###-####. Recheck fire joint spray. 9/5/2001 3:20:07 PM
BLD-Conference8/28/20018/28/20018/28/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/28/2001 at 10:04:15. Contact: ###-####. Checking class 1 duct and shaft. 8/28/2001 4:44:30 PM
BLD-Framing/Rough-in8/27/20018/27/20018/27/2001PFAIL
DetailsJim Sly
Added by Inspector: 316 On 8/27/2001 12:24:48 PM Remove drywall to allow for insp of grease ducts. Remove material and rebuild grease ducts to meet req. for clearances ( 3" min 12" max ) per chpter 5 (97) UMC and call for insp.
BLD-Framing/Rough-in8/22/20018/22/20018/22/2001PCANC
DetailsJim Sly
Added by Inspector: 316 On 8/22/2001 2:32:13 PM C/N....Provide flame spread/smoke density rating for textile speaker (type) fabric, ceiling reflector panels, carpet and all combustible interior finishes.
BLD-Conference8/14/20018/15/20018/15/2001APART
DetailsJim Sly
Jim Martin, ###-#### - early, if possible : ) Reveiwed prev corr notices...C/N...Painting of "spray Fireproofing" to meet all Req of chapter 8. 8/15/2001 11:23:29 AM
BLD-Wall cover7/23/20017/24/20017/24/2001AFAIL
DetailsJim Sly
Jim Martin, ###-#### : ) C/N....Zone 3....Firestopping, Plan Mod. at storage and audio rooms Including wall Rating changes involving Dampers. Need completion of 1hr rating at large Electr panels, Check Req. for wood floor projection room. 7/24/2001 12:47:41 PM
FIRE-Conference7/3/20017/5/20017/5/2001APASS
DetailsJoe Tawney
Conf with Jim Martin contr regarding smoke detectors in bldg 7/5/2001 11:29:33 AM
Inspection Record Card- Bld  6/29/2001 DONE
Print Occupancy Form  6/29/2001 DONE
Print Occupancy Form  6/29/2001 DONE
Inspection Record Card- Bld  6/29/2001 DONE
CHANGE STATUS TO (ISS)  6/27/2001 DONE
i don't know why but the status did not change...
BLD-Wall cover6/21/20016/22/20016/22/2001APART
DetailsJim Sly
Jim, ###-#### : ) OK to cover zone 4 and 5. 6/22/2001 9:58:42 AM
Receive PAYMENT IN FULL PRINT  6/22/2001 DONE
BLD-Wall cover6/20/20016/21/20016/21/2001APART
DetailsJim Sly
Jim, ###-#### : ) C/N..Zone 4&5.....Firestop electr 24" Corridors, Provide listing (rating) for 8x8" box at Corridor, fasten gyp, complete fire prot of columns, re-install fireproofing where removed....Special insp Req. 6/21/2001 9:09:44 AM
PLANS/APPL TAKEN TO FRONT DESK  6/21/2001 DONE
Plan assigned to (MLO)5/25/2001 6/21/2001 PASS
DetailsMike Otto
6/21/2001 13:10:40 MLO - activity updated through activity BLDA022 from case BLD00-03711.
Routing - PLAN CHECK6/8/2001 6/21/2001 PASS
Plan Modification dated May 25, 2001
BLD-Conference6/11/20016/12/20016/12/2001APART
DetailsJim Sly
Jim, ###-#### : ) 1st insp of firestoppng at zone 1.....OK to finish 6/12/2001 10:50:48 AM
Plan Modification Accepted  6/8/2001  
Plan Modification originally assigned to incorrrect set of plans. Application indicated that plan modification applied to BLD 00-02246 the builsing and shell permit, when it really applied to BLD00-03711 the Tenant Improvement.
BLD-Framing/Rough-in6/4/20016/5/20016/5/2001APART
DetailsJim Sly
Framing OK...Zone 2.....C/N for E.I.F.S. Install and rating. 6/5/2001 9:47:53 AM
CHANGE STATUS TO (ISS)  6/4/2001 DONE
BLD-Conference5/31/20016/1/20016/1/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/31/2001 at 09:18:46. Contact: ###-####. Verify gyp column protection per listing. 6/1/2001 10:36:48 AM
BLD-Conference5/18/20015/21/20015/21/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/18/2001 at 11:46:42. Contact: ###-####. Discussion on Fire stopping, fire protection columns, smoke density/flame spread ratings Etc. 5/21/2001 11:18:31 AM
BLD-Wall cover5/15/20015/15/20015/15/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/15/2001 at 09:25:19. Contact: ###-####. Frame insp of Zone 1.....C/N....Need OK from Eng for holes cut in CMU wall for HVAC. Need smoke dens/flame sp for comb. Need screw schedule for gyp at Corridors. OK to rock Zone 1. 5/15/2001 3:04:25 PM
BLD-Conference5/11/20015/11/20015/11/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/11/2001 at 10:49:46. Contact: ###-####. Walked job....Discussed firestopping at Corridors. 5/11/2001 4:29:32 PM
BLD-Conference4/24/20014/25/20014/25/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 04/24/2001 at 11:46:00. Contact: ###-####. Looked at proposed design for 2 HR shafts.....Need UL assmbly # and detail. 4/25/2001 1:21:33 PM
Issue PAID IN FULL permit  3/12/2001 DONE
Plan assigned to (MLO)12/28/2000 3/8/2001 PASS
DetailsMike Otto
3/8/2001 10:30:04 MLO - activity updated through activity BLDA022 from case BLD00-03711.
Routing - PLAN CHECK2/26/2001 3/8/2001 PASS
Plan Reviewer's activity  3/8/2001 DONE
verified that new exterior stair on east side was ok with Planning per Scott Spijute. MLO
PLANS/APPL TAKEN TO FRONT DESK  3/8/2001 DONE
Inspection Record Card- Bld  3/8/2001 DONE
Print Occupancy Form  3/8/2001 DONE
Telephone call  3/8/2001 DONE
left mess that permit is ready
Routing Off Site - C.D.H3/1/2001 3/1/2001 PASS
Plan resubmittals received  2/23/2001 DONE
Received plan resubmittals from Architecture Northwest, plus small documents, forwarded same to Mike Otto. 2/23/01 DAR
Plan Review Completed(1st rev)  2/1/2001 FAIL
plans returned to plan check
Routing - FIRE1/26/2001 2/1/2001 PASS
Plan resubmittals requested  1/26/2001 FAIL
UBC corrections
Routing - PLAN CHECK1/8/2001 1/26/2001 FAIL
corrections sent to architect
Routing - PLUMBING1/3/2001 1/8/2001 PASS
Routing - PUBLIC WORKS12/28/2000 1/3/2001 PASS
Pending Assignment by MYS12/28/2000 12/28/2000 DONE
DetailsMarlene Southard
Application received  12/26/2000  
Recd Pcfee & Taken To Pln CK  12/26/2000 DONE