DOC - Permit Finaled | 7/23/2002 | 7/23/2002 | 7/23/2002 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 7/23/2002 10:08:46 AM
|
BLD-Final | 6/27/2002 | 7/22/2002 | 7/22/2002 | A | PASS |
Tony Young
|
|
|
verify landings, driveway, drainage from house, and firewall seal 7/23/2002 10:08:41 AM
|
BLD-Final | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PART |
Tony Young
|
|
|
ok to temp occupy now, need to verify other issues later as scheduled 6/27/2002 2:50:28 PM
|
BLD-Grading Inspection | 6/26/2002 | 6/26/2002 | 6/26/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Final | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 10:22:56. Contact: ###-####.conf. only, need trades signed off 6/25/2002 2:23:09 PM
|
BLD-Framing/Rough-in | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | PASS |
Tony Young
|
|
|
re-insp on wall cover- ###-#### mel
|
BLD-Wall cover | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 08:36:05. Contact: ###-####. C/N posted. 3/18/2002 4:40:35 PM
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 | | PART |
Tony Young
|
|
|
wip 12/12/2001 8:54:23 AM
|
BLD-Framing/Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | PART |
Tony Young
|
|
|
###-#### MIKE SHEER NAIL /ROOF INSPECTION
ext ok 10/10/2001 2:15:54 PM
|
BLD-Framing/Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Tony Young
|
|
|
###-#### MIKE SHEER NAIL OUT SIDE ONLY
c/n on nailing 10/10/2001 10:29:34 AM
|
BLD-Aging Inspection | 9/18/2001 | 9/18/2001 | 9/18/2001 | | PASS |
Tony Young
|
|
|
wip 9/18/2001 11:41:04 AM
|
BLD-Foundation | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PART |
Tony Young
|
|
|
brent ###-####
wip, verbal corrections 7/19/2001 10:24:05 AM
|
BLD-Footing | 7/16/2001 | 7/17/2001 | 7/17/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 14:13:55. Contact: ###-####.ok to pour pending soil engineer approval 7/17/2001 10:46:54 AM
|
Override - Parcel Holds | | | 4/27/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/27/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 1/29/2001 | 1/29/2001 | 3/19/2001 | | PASS |
Dan Overy
|
|
|
3/19/2001 11:36:08 DJO - activity updated through activity BLDA022 from case BLD00-03720.
|
Plan Reviewer's activity | | | 3/19/2001 | | DONE |
|
|
|
Mr. Mohr submitted three sets of revised plans and additional engineering for beams thru garage. This engineering also includes revisions to certain grid lines, wall lengths and mechanical devices.
|
Case Summary (BLD) | | | 3/19/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 3/19/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/19/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/15/2001 | | PEND |
|
|
|
Mr. Mohr will be in around 8:30 A.M. to discuss plans.
|
Plan Reviewer's activity | | | 1/31/2001 | | PEND |
|
|
|
plans marked, stuffed in manila envelope and deposited in out going mail basket on 01-31-2001 11:30 A.M.
|
Plan Reviewer's activity | | | 1/30/2001 | | DONE |
|
|
|
plans need alot of explanation. grid lines, wall brace designation, drag truss info, and numerous other items. have called contractor at eagle phone number to get his apartment phone number in portland. called apartment phone number and talked with lady. she gave me mel mohrs (contractor) job number in portland. called and left message. designer is not identified and structural engineer is based out of aurora, oregon and has not included any phone number on their letterhead. need to talk in person with someone about these plans.
|
Plan Reviewer's activity | | | 1/30/2001 | | PEND |
|
|
|
received phone call from mr. mohr. has requested that marked plans and corrections be mailed to his portland, oregon office.
|
Plans ACCEPTED BY PLAN CHECK | | | 1/29/2001 | | PEND |
|
|
|
01-29-2001 2:45 P.M. have started initial review
|
Routing - PLANNING | 1/25/2001 | 1/25/2001 | 1/26/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/27/2000 | 12/27/2000 | 1/25/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/27/2000 | 12/27/2000 | 1/24/2001 | | DONE |
Rita DeYoung
|
|
|
Approved as category 3 with conditions of approval contained in letter attached to plans.TOOK TO TERRY RECORDS 12/27/2000/PE
|
Plan Reviewer's activity | | | 12/29/2000 | | FAIL |
|
|
|
Grading plan needs revisions. Sent letter detailing deficiencies to applicant on 12/29/00.
|
Application received | | | 12/27/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 1/26/2001 | 1/26/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 12/27/2000 | | | | PEND |
Dan Overy
|
|
|
|