Fee Review-notes | 12/29/2000 | 12/29/2000 | 3/22/2004 | | DONE |
|
|
|
|
First Notice | | 7/9/2003 | 7/9/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/9/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9713 issued 7-9-03 to the Cathedral of the Rockies (new addn.)
|
FIRE-Final Inspection | 6/2/2003 | 6/4/2003 | 6/4/2003 | A | PASS |
Rick Jackson
|
|
|
tom or bruce ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 6/2/2003 | 6/4/2003 | 6/4/2003 | A | PASS |
Carl Dependahl
|
|
|
tom or bruce ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore... card to contractor, rec'd final affidavit from MTI & eng'r 6/4/2003 11:51:53 AM
|
FIRE-Final Inspection | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PART |
Troy Cobbley
|
|
|
tom; Phone #: ###-#### I witnessed the testing of the fire alarm in the west basement, phase three one the plans. Contractor stated that it is actually phase 4. All devices worked except for the horn in the mechanical room. The test included the tripping of the dry system for the fellowship hall. Trip time was only about 10 seconds. This area is OK to occupy 5/28/2003 2:33:03 PM
|
BLD-Other | 5/27/2003 | 5/28/2003 | 5/28/2003 | P | PASS |
Carl Dependahl
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...south corridor area ok to use...phase3 5/28/2003 4:37:38 PM
|
BLD-Conference | 5/27/2003 | 5/27/2003 | 5/28/2003 | A | PASS |
Carl Dependahl
|
|
|
Bruce, late AM...re final....need all fire issues completed for c/o. 5/28/2003 10:59:29 AM
|
FIRE-Final Inspection | 5/19/2003 | 5/20/2003 | 5/20/2003 | P | CANC |
Rick Jackson
|
|
|
cm company; Phone #: ###-#### Internet Inspection Request from: Barbara Moore this is for permit FIR03-00236 for the extinguishing system for the new stove 5/20/2003 1:39:32 PM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/19/2003 | 5/19/2003 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 9:56:30 AM. ..grid at south portion bsmt ok pending fire & elec ok's. 5/19/2003 2:27:10 PM
|
FIRE-Final Inspection | 4/29/2003 | 5/1/2003 | 5/1/2003 | A | PART |
Rick Jackson
|
|
|
BRUCE ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie phase 4 okay to occupy; signatures are on the occupancy card under phase 3 5/1/2003 2:29:45 PM . 5/1/2003 2:29:49 PM
|
BLD-Final | 4/29/2003 | 5/1/2003 | 5/1/2003 | A | PART |
Carl Dependahl
|
|
|
BRUCE ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...Part ,phase.3 ok for t/o, still need listing for 3hr door assy's. 3/4 hr glass installed at exterior firewall extension, ok 5/1/2003 11:35:31 AM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/23/2003 | 4/23/2003 | P | PART |
Carl Dependahl
|
|
|
###-#### bruce grid at corridor (north side bldg.) ok to tile 4/23/2003 4:59:09 PM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/23/2003 | 4/23/2003 | A | NR |
Carl Dependahl
|
|
|
bruce
|
BLD-Final | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | FAIL |
Carl Dependahl
|
|
|
BRUCE; Phone #: ###-#### Internet Inspection Request from: Darla Downs... 3/11/2003 3:31:15 PM need listing for 3hr smoke seals....install glazing.....ok for t/o phase 2 3/11/2003 3:33:10 PM
|
FIRE-Final Inspection | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | PART |
Rick Jackson
|
|
|
BRUCE; Phone #: ###-#### Internet Inspection Request from: Darla Downs phase 2 okay to use/occupy 3/11/2003 10:51:50 AM
|
FIRE-Conference | 3/4/2003 | 3/5/2003 | 3/5/2003 | P | PART |
Rick Jackson
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Annette Moore met with Bruce about exiting for the next phase; will need to test alarms for this phase and verify that sprinklers are operational 3/5/2003 2:59:49 PM
|
BLD-Framing/Rough-in | 2/26/2003 | 2/27/2003 | 2/27/2003 | A | PART |
Carl Dependahl
|
|
|
grid, main fl at phase 2 ok to tile. 2/27/2003 2:29:07 PM
|
BLD-Framing/Rough-in | 2/27/2003 | 2/27/2003 | 2/27/2003 | P | PART |
Carl Dependahl
|
|
|
Grid at 2nd fl...ok to tile, add seismic strut & wireat hall over asst pastors office area 2/27/2003 2:30:22 PM
|
BLD-Framing/Rough-in | 2/25/2003 | 2/26/2003 | 2/26/2003 | A | PART |
Carl Dependahl
|
|
|
###-#### grid at bsmt corridor 2/26/2003 6:33:23 PM
|
BLD-Framing/Rough-in | 2/26/2003 | 2/26/2003 | 2/26/2003 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | PART |
Carl Dependahl
|
|
|
###-####...grid at top of 2hr stairwell ok to tile 1/31/2003 3:33:29 PM
|
FIRE-Conference | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | PART |
Rick Jackson
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie met with Bruce about requirements for basement; they will have to have alarms exiting working prior to using the space 1/30/2003 12:48:42 PM
|
BLD-Framing/Rough-in | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | CANC |
Carl Dependahl
|
|
|
CEILING GRID--BRUCE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 1/23/2003 | 1/23/2003 | 1/23/2003 | P | PART |
Carl Dependahl
|
|
|
Grid bsmt.& main fl...add spreaders w/ tiles as needed. 1/23/2003 3:39:47 PM
|
BLD-Framing/Rough-in | 1/23/2003 | 1/23/2003 | 1/23/2003 | P | PART |
Carl Dependahl
|
|
|
rms 144,145,146, 148, 149. ok...hard lids 217, 218 ok.
|
BLD-Framing/Rough-in | 12/30/2002 | 12/31/2002 | 12/31/2002 | P | PART |
Tony Young
|
|
|
bruce ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
pending elec pass 12/31/2002 1:02:59 PM
|
BLD-Framing/Rough-in | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### bruce sec 2 12/23/2002 4:40:40 PM
|
BLD-Conference | 12/19/2002 | 12/20/2002 | 12/20/2002 | A | PASS |
Carl Dependahl
|
|
|
Bruce Bruce: ucbc PROVISIONS ALLOWED AT EXISTING "HALLS"...new as work as for corridors 12/20/2002 9:18:38 AM
|
BLD-Conference | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | NR |
Carl Dependahl
|
|
|
###-#### BRUCE ,,,called, NH 12/19/2002 1:50:35 PM
|
FIRE-Conference | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | PART |
Rick Jackson
|
|
|
###-#### BRUCE discussed resubmittals for sprinklers - will have on site and provide as-builts at end of project 12/19/2002 10:29:05 AM
|
BLD-Conference | 12/19/2002 | 12/19/2002 | 12/19/2002 | P | PASS |
Carl Dependahl
|
|
|
w/ Bruce,need fire ok'd 12/20/2002 8:43:11 AM
|
BLD-Framing/Rough-in | 12/16/2002 | 12/17/2002 | 12/17/2002 | A | PART |
Carl Dependahl
|
|
|
BRUCE; Phone #: ###-#### Internet Inspection Request from: Darla Downs, bsmt util rm, main floor hall, restroom ok 12/17/2002 11:24:52 AM
|
BLD-Conference | 12/16/2002 | 12/16/2002 | 12/16/2002 | P | PASS |
Carl Dependahl
|
|
|
masonry wall...has 2hr rating per T-7-B...or 4hr. if solid grouted/vermiculite or equal & 7 5/8" thick; footnotes 11 & 12.
|
BLD-Conference | 12/12/2002 | 12/12/2002 | 12/12/2002 | P | PASS |
Carl Dependahl
|
|
|
PER CARL FOR 2:00 -BRUCE ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...met arch Scott Henson onsite, proposed expansion of main level exit passageway; ok w/ 2hr wall const as req'd w/ original review. 12/12/2002 3:34:33 PM
|
BLD-Conference | 11/22/2002 | 11/25/2002 | 11/25/2002 | A | PART |
Carl Dependahl
|
|
|
Bruce, wip...obtain all spec insp & eng's reports. 11/25/2002 1:36:18 PM
|
BLD-Framing/Rough-in | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | PART |
Carl Dependahl
|
|
|
area 3, initial framing, roof tie-in...wip, need elec ok all rooms for full frame ok. 11/22/02 5:49:26 PM
|
BLD-Framing/Rough-in | 11/22/2002 | 11/22/2002 | 11/22/2002 | A | NR |
Carl Dependahl
|
|
|
need elec 11/22/02 5:50:20 PM
|
FIRE-Final Inspection | 10/25/2002 | 10/25/2002 | 10/25/2002 | P | CANC |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
FIRE-Conference | 10/25/2002 | 10/25/2002 | 10/25/2002 | P | PART |
Rick Jackson
|
|
|
met with electrician about relocating horn/strobes in restrooms and small rooms south of exsisting chapel; no problem due to small room size and all will unobstructed
|
FIRE-Conference | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | PART |
Rick Jackson
|
|
|
###-#### okay to relocatee strobe to opposite wall in NE lobby 10/11/2002 4:46:58 PM
|
BLD-Footing | 9/25/2002 | 9/26/2002 | 9/26/2002 | A | PART |
Carl Dependahl
|
|
|
bruce ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...mti onsite 9/26/2002 6:25:14 PM
|
BLD-Conference | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | CANC |
Tony Young
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
was a conf. w/ 409 9/11/2002 11:41:07 AM
|
BLD-Footing | 8/22/2002 | 8/22/2002 | 8/22/2002 | P | PASS |
Jim Storey
|
|
|
BRUCE; Phone #: ###-#### s02 stair well ft ok 8/22/2002 4:01:07 PM
|
FIRE-Final Inspection | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PART |
Rick Jackson
|
|
|
###-#### BRUCE phase one okay 8/7/2002 11:01:26 AM
|
BLD-Final | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | FAIL |
Carl Dependahl
|
|
|
###-#### BRUCE; c/n onsite...adjust rated doors, complete firestops, 2nd fl restroom w.c. ht....pending State elev OK; ok to use, Phase 1 only; remainder of phased project in progress. 8/7/2002 12:07:30 PM
|
BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 | A | PASS |
Carl Dependahl
|
|
|
re partial...W/ BRUCE; WILL RECALL FOR 8-7; HANDRAILS INSTALLED AT "RAMP" TO MAIN ENTRY OF NEW PORTION. 8/5/2002 11:21:43 AM
|
BLD-Conference | 7/17/2002 | 7/17/2002 | 7/17/2002 | A | PASS |
Carl Dependahl
|
|
|
rec'd mti's affidavit re part final...ok
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
FIRE-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PART |
Rick Jackson
|
|
|
BRUCE ###-#### FIRE CONF okay to relocate strobe at reception 7/9/2002 10:06:01 AM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
BLD-Conference | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PASS |
Carl Dependahl
|
|
|
referred to 409 7/9/2002 2:55:42 PM
|
PubWorks Occupancy Approval | | 7/7/2002 | 7/8/2002 | | DONE |
|
|
|
Drainage project complete, signed final 07/08/02. M.Strasser
|
Permanent Occupancy | | 7/3/2002 | 7/3/2002 | | DONE |
|
|
|
|
BLD-Final | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | CANC |
Jim Storey
|
|
|
BRUCE ###-####
|
BLD-Framing/Rough-in | 6/28/2002 | 7/1/2002 | 7/1/2002 | A | PART |
Tom Arcoraci
|
|
|
BRUCE ###-#### CEILING INSP- 7/1/2002 9:57:19 AM rid in basement ok add spacer bars check later 7/1/2002 9:58:01 AM
|
BLD-Framing/Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | PART |
Carl Dependahl
|
|
|
###-#### bruce grids at narthex, corridors, bishop's lounge, b 6/4/2002 10:19:54 AM smt rooms ok, add spreader bars as needed, chk at final. 6/4/2002 10:20:26 AM
|
BLD-Framing/Rough-in | 6/4/2002 | 6/4/2002 | 6/4/2002 | A | FAIL |
Carl Dependahl
|
|
|
roomside firestopping at new bsmt area incomplete, conduits, ducts, data cables/sleeves ...recall
|
BLD-Conference | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Conference | 5/15/2002 | 5/15/2002 | 5/15/2002 | P | PASS |
Carl Dependahl
|
|
|
###-#### BRUCE CONFERENCE ONLY..re plaza area...ramp slope, ADA. 5/15/2002 6:10:43 PM
|
BLD-Framing/Rough-in | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | PART |
Tony Young
|
|
|
GRID CEILING ###-#### BRUCE
see inspection report 5/7/2002 12:20:37 PM
|
BLD-Framing/Rough-in | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PART |
Russ Owen
|
|
|
###-#### BRUCE passage 115 east side wall ok to cover there are 2 back to back ele boxes on the west side of this (east wall)contractor notified to protect with putty pads, can be verified at next inspection. Note there is no ceiling in this corriodor at this time.and the west side wall of this passage is drywalled.17/2002 1:23:59 PM 4/17/2002 1:25:08 PM
|
BLD-Framing/Rough-in | 4/3/2002 | 4/4/2002 | 4/4/2002 | A | PART |
Carl Dependahl
|
|
|
###-#### bruce hallway, 4hr wall, & corridor #108 ok 4/4/2002 1:19:17 PM
|
BLD-Framing/Rough-in | 3/28/2002 | 3/29/2002 | 3/29/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 13:29:39. Contact: .rm 165 & adjacent hall...solid grout at door 101. 3/29/2002 11:57:14 AM
|
BLD-Framing/Rough-in | 3/21/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### bruce
hard lid frames in misc. rooms noted on job inspection card, bishop lounge wall cover, ok to cover 3/22/2002 2:59:04 PM
|
BLD-Conference | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Carl Dependahl
|
|
|
###-#### bruce re doors at Cana chapel...add 20 min leaves at pair w / louvers 3/18/2002 4:53:40 PM
|
BLD-Framing/Rough-in | 3/8/2002 | 3/11/2002 | 3/11/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### BRUCE steel stud framing in sanctuary 3/11/2002 2:28:31 PM
|
BLD-Framing/Rough-in | 3/6/2002 | 3/7/2002 | 3/7/2002 | A | NR |
Carl Dependahl
|
|
|
###-#### BRUCE; need elec r/i at sanctuary 3/7/2002 10:51:13 AM
|
BLD-Framing/Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PART |
Dave Hannah
|
|
|
bruce ###-#### second floor steel stud framing and firwe caulking on 4hr wall along a line 2/21/2002 4:17:40 PM
|
BLD-Framing/Rough-in | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PART |
Russ Owen
|
|
|
BRUCE ###-#### Small room next to elevator. 2/15/2002 2:53:28 PM
|
BLD-Conference | 2/8/2002 | 2/8/2002 | 2/8/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/8/2002 9:32:40 AM w/ Bruce re corrections
|
BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | PART |
Dave Hannah
|
|
|
BRUCE ###-#### base ment and second level stell stud framing ok carl d walked project wiyh me and bruce 2/7/2002 1:14:05 PM
|
BLD-Conference | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | CANC |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/7/2002 2:04:46 PM ok to rock bsmt walls; chk firestops as completed; fix exit passage & 4 hr wall at elec penetrations
|
BLD-Framing/Rough-in | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | PART |
Carl Dependahl
|
|
|
###-####; red iron... req's spec insp reports 2/6/2002 4:49:01 PM
|
BLD-Framing/Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 2/6/2002 12:15:24 PM ...nr, need elec. 2/6/2002 4:46:38 PM
|
BLD-Foundation | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | PART |
Carl Dependahl
|
|
|
###-####, masonry, MTI onsite... 1/8/2002 10:23:37 AM
|
BLD-Concrete | 12/27/2001 | 12/28/2001 | 12/27/2001 | A | CANC |
Carl Dependahl
|
|
|
concrete--jim-- ###-####--cancel per jim
|
BLD-Conference | 12/27/2001 | 12/27/2001 | 12/27/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/27/2001 9:56:18 AM w/
w/Jim re masonry insps
|
BLD-Foundation | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Carl Dependahl
|
|
|
###-####, masonry, pend MTI report 12/27/2001 5:19:58 PM
|
BLD-Conference | 12/26/2001 | 12/26/2001 | 12/26/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/26/2001 9:32:51 AM w/ mason re spec insps.
|
BLD-Foundation | 12/20/2001 | 12/21/2001 | 12/21/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### pend mti report 12/21/2001 2:44:35 PM
|
BLD-Conference | 12/21/2001 | 12/21/2001 | 12/21/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/21/2001 9:46:24 AM w/ cm co....submit alt exiting to plan chk
|
BLD-Foundation | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### pending spec insp 12/20/2001 12:06:49 PM
|
BLD-Foundation | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PART |
Carl Dependahl
|
|
|
bruce ###-####, masonry, pend MTI report. 12/17/2001 10:59:11 AM
|
BLD-Foundation | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | PART |
Carl Dependahl
|
|
|
###-####...ext wall masonry, mti onsite, ok pend report.
12/12/2001 11:38:32 AM
|
BLD-Foundation | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PART |
Tom Arcoraci
|
|
|
bruce ###-#### spec insp 12/4/2001 11:19:30 AM
|
BLD-Foundation | 11/27/2001 | 11/28/2001 | 11/28/2001 | P | PART |
Carl Dependahl
|
|
|
found- bruce ###-#### masonry, pend insp report MTI 11/28/2001 9:42:02 AM
|
BLD-Foundation | 11/21/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### BRUCE cmu grout placement spic inspection done by mti 11/26/2001 10:56:56 AM
|
BLD-Foundation | 11/20/2001 | 11/21/2001 | 11/21/2001 | P | PASS |
Jim Storey
|
|
|
bruce ###-#### placed with special insp. 11/21/2001 3:48:49 PM
|
BLD-Foundation | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PART |
Tony Young
|
|
|
###-#### BRUCE
pend. si report 11/20/2001 1:00:31 PM
|
BLD-Concrete | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### masonry, bed course east wall ok. pend spec insp. 11/15/2001 11:06:59 AM
|
BLD-Framing/Rough-in | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 11/14/2001 5:03:45 PM 2hr beams,cols, upper portion corridor B08 11/15/2001 10:52:21 AM
|
BLD-Concrete | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PART |
Carl Dependahl
|
|
|
###-####, masonry, pend spec insp report 11/14/2001 3:49:19 PM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 11/8/2001 | 11/8/2001 | 11/8/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/8/2001 10:20:01 AM w/ framer & Bruce at site re bsmt corridor; complete firestops at wall to deck.
|
BLD-Foundation | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Carl Dependahl
|
|
|
BRUCE ###-#### S.E. corner walls ok 11/7/2001 11:37:18 AM
|
BLD-Framing/Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/7/2001 11:40:01 AM upper portions wall at B08 cooridor, alcoved areas ok. Per previous conf. ok to delete tunnel and run walls to "rated" deck this area. Need verify rating req's of indivually protected col's/beams
|
BLD-Footing | 10/30/2001 | 10/31/2001 | 10/31/2001 | A | PART |
Russ Owen
|
|
|
###-#### BRUCE >East footings ok also MTI on site and has approved. 10/31/2001 11:23:10 AM
|
BLD-Conference | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | PASS |
Carl Dependahl
|
|
|
###-#### BRUCE ...met w/ Scott H.LCA arch. and framer at site. Ok to run walls full ht to rated deck at bsmt for corridors (delete rated ceiling) detail to follow...ok to use partial rated lid at bsmt corridor alcoves...tunnel or suspended to provide equivalent around steel framing. 10/18/2001 9:54:04 AM
|
BLD-Conference | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PASS |
Carl Dependahl
|
|
|
for conf-- bruce -- ###-#### ...w CM & Achd atsite re sidewalks, landings; if rebuilt must meet code, consult arch re add'l req's & ADA . 1:12 slope ok at walks 10/1/2001 12:45:39 PM
|
BLD-Conference | 10/1/2001 | 10/1/2001 | 10/1/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/1/2001 10:13:46 AM w/ Gary Adams, MTI...onsite re struct details
|
BLD-Conference | 9/20/2001 | 9/20/2001 | 9/20/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/20/2001 5:19:13 PM reviewed mti soils reports, bsmt subgrade ok
|
BLD-Foundation | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | PART |
Carl Dependahl
|
|
|
wall bruce ###-#### masonry, bsmt pend mti re 9/13/2001 12:17:24 PM
|
BLD-Concrete | 9/7/2001 | 9/10/2001 | 9/10/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### masonry lift; MTI onsite 9/10/2001 10:45:33 AM
|
BLD-Conference | 9/10/2001 | 9/10/2001 | 9/10/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/10/2001 11:54:13 AM w/ Bruce, supt & Gary, spec. insp...need submittal from steel fab re "approved" status
|
BLD-Other | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Tony Young
|
|
|
MASONARY BRUCE ###-####
si on job, pending report, wip 9/6/2001 11:10:05 AM
|
BLD-Foundation | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Tony Young
|
|
|
BRUCE ###-####
pending si report , wip 9/6/2001 11:10:17 AM
|
BLD-Other | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | DONE |
Dave Hannah
|
|
|
column and masonary inspection Bruce ###-#### done using spec inspection 8/31/2001 11:56:30 AM
|
BLD-Foundation | 8/27/2001 | 8/28/2001 | 8/28/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### BRUCE ok pend insp report, bsmt wall 8/28/2001 4:49:49 PM
|
BLD-Foundation | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### pend SI report 8/27/2001 3:42:22 PM
|
BLD-Foundation | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### bruce; bsmt walls ok pend spec insp r 8/21/2001 2:33:37 PM s 8/21/2001 2:33:43 PM
|
BLD-Footing | 8/14/2001 | 8/15/2001 | 8/15/2001 | P | PART |
Carl Dependahl
|
|
|
FT INSP & FOUND WALL- BRUCE ###-####
|
BLD-Wall cover | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | NH |
Dave Hannah
|
|
|
###-#### bruce carl on site no one there he left notice to reschedule 8/14/2001 10:28:34 AM
|
BLD-Framing/Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PART |
Carl Dependahl
|
|
|
Bruce ###-#### activity rm lid at bsmt ok 8/14/2001 1:29:46 PM
|
BLD-Footing | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PART |
Carl Dependahl
|
|
|
###-####
|
BLD-Foundation | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PART |
Carl Dependahl
|
|
|
pend spec insp report 8/8/2001 2:39:26 PM
|
BLD-Footing | 7/25/2001 | 7/26/2001 | 7/26/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### SPEC ON SITE 7/26/2001 4:38:12 AM
|
BLD-Footing | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PART |
Tony Young
|
|
|
pending s. i. report 7/23/2001 11:26:19 AM
|
BLD-Footing | 7/19/2001 | 7/20/2001 | 7/20/2001 | P | PART |
Tony Young
|
|
|
###-####
s. i. report pending 7/23/2001 8:13:09 AM
|
Plan resubmittals received | | | 7/19/2001 | | DONE |
|
|
|
Received structural one set of plan resubmittals from Lombard Conrad Architects, forwarded same to Carl Dependahl. 7/19/01 DAR
|
BLD-Conference | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/5/2001 1:32:46 PM w/ supt onsite; returned approved resub re: deletion of ramps at rm 160
|
Issue PAID IN FULL permit | | | 5/23/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/9/2001 | | 4/19/2001 | | PASS |
|
|
|
Approved with conditions after review of 4-16-01 resubmittal.
|
Plan Review Report | | | 4/19/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2001 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/19/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2001 | | DONE |
|
|
|
called Scott Henson at ###-#### and i also called Dennis Robinson at ###-#### permit is ready for pick up ACHD is required...
|
Plan assigned to (CJW) | 12/29/2000 | | 4/19/2001 | | PASS |
Carl Westfall
|
|
|
4/19/01 11:48:40 CJW - activity updated through activity BLDA022 from case BLD00-03729.
|
Plan resubmittals received | | | 4/16/2001 | | DONE |
|
|
|
Received plan resubmittals from Lombard - Conrad Architects, forwarded same to Carl Westfall. 4/16/01 DAR
|
Routing - PLUMBING | 4/4/2001 | | 4/9/2001 | | PASS |
|
|
|
verify the necessity of 1st. floor fixtures discharging to basement sump with field inspector. provide secondary roof drainage for all roof drains. remove fire hose cabinets from the potable water system. if an automatic soap dispensor is used at mop sinks, provide a water supply for them. additional cross connection protection may be required.
|
Plan resubmittals received | | | 4/4/2001 | | DONE |
|
|
|
Received three sets of resubmittals, sheet number S7.4, forwarded same to Carl Westfall. 4/4/01 DAR
|
Routing Off Site - STRUCTURAL | 1/2/2001 | | 4/3/2001 | | PASS |
|
|
|
Sent structural plans to the consultanting engineer via PDQ. 1/2/01 DAR
Drawings approved by consultant Structural Engineer on April 3, 2001. (4-19-01) CJW
|
Routing - PLAN CHECK | 3/7/2001 | | 3/30/2001 | | |
|
|
|
Failed second UBC plan review. Faxed plan review report to architect. Included only failed items.
|
Routing - FIRE | 3/30/2001 | | 3/30/2001 | | PASS |
|
|
|
Added the previoulsy requested United Water water supply information, received from the architect.
|
Plan resubmittals received | | | 3/29/2001 | | DONE |
|
|
|
Received plan resubmittals from Lombard - Conrad Architects one set of sheets S2.2, S2.3, S7.2 , forwarded same to Carl Westfall. 3/29/01 DAR
|
Plan resubmittals received | | | 3/21/2001 | | DONE |
|
|
|
Received two sets of plan resubmittals from Lombard - Conrad Architects, forwarded same to Carl Westfall. 3/21/01 DAR
|
Plan Review Completed(1st rev) | | | 3/7/2001 | | |
|
|
|
Failed first UBC and UFC reviews
|
Routing - FIRE | 2/28/2001 | | 3/7/2001 | | |
|
|
|
Failed first UFC review. Faxed requirements/review comments to architect.
|
Routing - PLAN CHECK | 1/17/2001 | | 2/28/2001 | | |
|
|
|
Failed first UBC review.
|
Meeting | | | 2/26/2001 | | |
|
|
|
Met with the architect and went over the plan review report.
|
Plan Reviewer's activity | | | 2/15/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started February 15, 2001 and finished February 27, 2001. A response is required from the architect. See the conditions list. A copy was given to the architect on Feb. 26, 2001.
|
Routing - PLUMBING | 1/12/2000 | | 1/16/2001 | | |
|
|
|
Failed first UPC review. fire dept. to review plans for compliance prior to plumbing review to determine if fire hose cabinets are allowed on the domestic water system.
|
Routing - PLANNING | 1/10/2001 | | 1/12/2001 | | PASS |
|
|
|
Approved per DRH00-182. CU approved by DAA.
|
Routing - PUBLIC WORKS | 12/29/2000 | | 1/10/2001 | | PASS |
|
|
|
|
Application received | | | 12/29/2000 | | |
|
|
|
|
Pending Assignment by MYS | 12/29/2000 | | 12/29/2000 | | DONE |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/29/2000 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/30/2001 | | | | |
|
|
|
Sent resubmittals to consultanting engineer via PDQ. 3/30/01 DAR
|