Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD00-03729
StatusFinaled
Name CM COMPANY
Site Address 1110 W FRANKLIN ST
Project NameCATHEDRAL OF THE ROCKIES
Customer Number 
ePlanReviewNo
Description
(CATHEDRAL OF THE ROCKIES) Fire sprinklers are used to substitute for 1-hr fire resistive construction. To demolish the administration wing of an existing church (Southeast corner) and construct a 13,500 square foot basement, 17,000 square foot first floor, and 3,250 square foot 2nd floor in its place. Within existing adjacent areas a 1-hr stairway and 2,400 square foot second floor are being constructed. Work is to include concrete footings and foundations, concrete floors, 4-hr area separation walls, a fire sprinkler system, and a fire alarm system all per approved drawings, engineering, and plan review conditions on file. PC-1085-00 CUP00-00080 DRH00-00182 DRH00-00215 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/29/200012/29/20003/22/2004 DONE
First Notice 7/9/20037/9/2003 DONE
Permanent occupancy  7/9/2003 DONE
Perm. Occ. Cert. #9713 issued 7-9-03 to the Cathedral of the Rockies (new addn.)
FIRE-Final Inspection6/2/20036/4/20036/4/2003APASS
DetailsRick Jackson
tom or bruce ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final6/2/20036/4/20036/4/2003APASS
DetailsCarl Dependahl
tom or bruce ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore... card to contractor, rec'd final affidavit from MTI & eng'r 6/4/2003 11:51:53 AM
FIRE-Final Inspection5/27/20035/28/20035/28/2003APART
DetailsTroy Cobbley
tom; Phone #: ###-#### I witnessed the testing of the fire alarm in the west basement, phase three one the plans. Contractor stated that it is actually phase 4. All devices worked except for the horn in the mechanical room. The test included the tripping of the dry system for the fellowship hall. Trip time was only about 10 seconds. This area is OK to occupy 5/28/2003 2:33:03 PM
BLD-Other5/27/20035/28/20035/28/2003PPASS
DetailsCarl Dependahl
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...south corridor area ok to use...phase3 5/28/2003 4:37:38 PM
BLD-Conference5/27/20035/27/20035/28/2003APASS
DetailsCarl Dependahl
Bruce, late AM...re final....need all fire issues completed for c/o. 5/28/2003 10:59:29 AM
FIRE-Final Inspection5/19/20035/20/20035/20/2003PCANC
DetailsRick Jackson
cm company; Phone #: ###-#### Internet Inspection Request from: Barbara Moore this is for permit FIR03-00236 for the extinguishing system for the new stove 5/20/2003 1:39:32 PM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/16/2003 at 9:56:30 AM. ..grid at south portion bsmt ok pending fire & elec ok's. 5/19/2003 2:27:10 PM
FIRE-Final Inspection4/29/20035/1/20035/1/2003APART
DetailsRick Jackson
BRUCE ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie phase 4 okay to occupy; signatures are on the occupancy card under phase 3 5/1/2003 2:29:45 PM . 5/1/2003 2:29:49 PM
BLD-Final4/29/20035/1/20035/1/2003APART
DetailsCarl Dependahl
BRUCE ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...Part ,phase.3 ok for t/o, still need listing for 3hr door assy's. 3/4 hr glass installed at exterior firewall extension, ok 5/1/2003 11:35:31 AM
BLD-Framing/Rough-in4/22/20034/23/20034/23/2003PPART
DetailsCarl Dependahl
###-#### bruce grid at corridor (north side bldg.) ok to tile 4/23/2003 4:59:09 PM
BLD-Framing/Rough-in4/22/20034/23/20034/23/2003ANR
DetailsCarl Dependahl
bruce
BLD-Final3/10/20033/11/20033/11/2003AFAIL
DetailsCarl Dependahl
BRUCE; Phone #: ###-#### Internet Inspection Request from: Darla Downs... 3/11/2003 3:31:15 PM need listing for 3hr smoke seals....install glazing.....ok for t/o phase 2 3/11/2003 3:33:10 PM
FIRE-Final Inspection3/10/20033/11/20033/11/2003APART
DetailsRick Jackson
BRUCE; Phone #: ###-#### Internet Inspection Request from: Darla Downs phase 2 okay to use/occupy 3/11/2003 10:51:50 AM
FIRE-Conference3/4/20033/5/20033/5/2003PPART
DetailsRick Jackson
bruce; Phone #: ###-#### Internet Inspection Request from: Annette Moore met with Bruce about exiting for the next phase; will need to test alarms for this phase and verify that sprinklers are operational 3/5/2003 2:59:49 PM
BLD-Framing/Rough-in2/26/20032/27/20032/27/2003APART
DetailsCarl Dependahl
grid, main fl at phase 2 ok to tile. 2/27/2003 2:29:07 PM
BLD-Framing/Rough-in2/27/20032/27/20032/27/2003PPART
DetailsCarl Dependahl
Grid at 2nd fl...ok to tile, add seismic strut & wireat hall over asst pastors office area 2/27/2003 2:30:22 PM
BLD-Framing/Rough-in2/25/20032/26/20032/26/2003APART
DetailsCarl Dependahl
###-#### grid at bsmt corridor 2/26/2003 6:33:23 PM
BLD-Framing/Rough-in2/26/20032/26/20032/26/2003PCANC
DetailsCarl Dependahl
BLD-Framing/Rough-in1/31/20031/31/20031/31/2003PPART
DetailsCarl Dependahl
###-####...grid at top of 2hr stairwell ok to tile 1/31/2003 3:33:29 PM
FIRE-Conference1/30/20031/30/20031/30/2003PPART
DetailsRick Jackson
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie met with Bruce about requirements for basement; they will have to have alarms exiting working prior to using the space 1/30/2003 12:48:42 PM
BLD-Framing/Rough-in1/22/20031/23/20031/23/2003ACANC
DetailsCarl Dependahl
CEILING GRID--BRUCE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/23/20031/23/20031/23/2003PPART
DetailsCarl Dependahl
Grid bsmt.& main fl...add spreaders w/ tiles as needed. 1/23/2003 3:39:47 PM
BLD-Framing/Rough-in1/23/20031/23/20031/23/2003PPART
DetailsCarl Dependahl
rms 144,145,146, 148, 149. ok...hard lids 217, 218 ok.
BLD-Framing/Rough-in12/30/200212/31/200212/31/2002PPART
DetailsTony Young
bruce ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
pending elec pass 12/31/2002 1:02:59 PM
BLD-Framing/Rough-in12/23/200212/23/200212/23/2002PPART
DetailsCarl Dependahl
###-#### bruce sec 2 12/23/2002 4:40:40 PM
BLD-Conference12/19/200212/20/200212/20/2002APASS
DetailsCarl Dependahl
Bruce Bruce: ucbc PROVISIONS ALLOWED AT EXISTING "HALLS"...new as work as for corridors 12/20/2002 9:18:38 AM
BLD-Conference12/18/200212/19/200212/19/2002ANR
DetailsCarl Dependahl
###-#### BRUCE ,,,called, NH 12/19/2002 1:50:35 PM
FIRE-Conference12/18/200212/19/200212/19/2002APART
DetailsRick Jackson
###-#### BRUCE discussed resubmittals for sprinklers - will have on site and provide as-builts at end of project 12/19/2002 10:29:05 AM
BLD-Conference12/19/200212/19/200212/19/2002PPASS
DetailsCarl Dependahl
w/ Bruce,need fire ok'd 12/20/2002 8:43:11 AM
BLD-Framing/Rough-in12/16/200212/17/200212/17/2002APART
DetailsCarl Dependahl
BRUCE; Phone #: ###-#### Internet Inspection Request from: Darla Downs, bsmt util rm, main floor hall, restroom ok 12/17/2002 11:24:52 AM
BLD-Conference12/16/200212/16/200212/16/2002PPASS
DetailsCarl Dependahl
masonry wall...has 2hr rating per T-7-B...or 4hr. if solid grouted/vermiculite or equal & 7 5/8" thick; footnotes 11 & 12.
BLD-Conference12/12/200212/12/200212/12/2002PPASS
DetailsCarl Dependahl
PER CARL FOR 2:00 -BRUCE ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...met arch Scott Henson onsite, proposed expansion of main level exit passageway; ok w/ 2hr wall const as req'd w/ original review. 12/12/2002 3:34:33 PM
BLD-Conference11/22/200211/25/200211/25/2002APART
DetailsCarl Dependahl
Bruce, wip...obtain all spec insp & eng's reports. 11/25/2002 1:36:18 PM
BLD-Framing/Rough-in11/22/200211/22/200211/22/2002PPART
DetailsCarl Dependahl
area 3, initial framing, roof tie-in...wip, need elec ok all rooms for full frame ok. 11/22/02 5:49:26 PM
BLD-Framing/Rough-in11/22/200211/22/200211/22/2002ANR
DetailsCarl Dependahl
need elec 11/22/02 5:50:20 PM
FIRE-Final Inspection10/25/200210/25/200210/25/2002PCANC
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
FIRE-Conference10/25/200210/25/200210/25/2002PPART
DetailsRick Jackson
met with electrician about relocating horn/strobes in restrooms and small rooms south of exsisting chapel; no problem due to small room size and all will unobstructed
FIRE-Conference10/11/200210/11/200210/11/2002PPART
DetailsRick Jackson
###-#### okay to relocatee strobe to opposite wall in NE lobby 10/11/2002 4:46:58 PM
BLD-Footing9/25/20029/26/20029/26/2002APART
DetailsCarl Dependahl
bruce ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...mti onsite 9/26/2002 6:25:14 PM
BLD-Conference9/10/20029/11/20029/11/2002ACANC
DetailsTony Young
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
was a conf. w/ 409 9/11/2002 11:41:07 AM
BLD-Footing8/22/20028/22/20028/22/2002PPASS
DetailsJim Storey
BRUCE; Phone #: ###-#### s02 stair well ft ok 8/22/2002 4:01:07 PM
FIRE-Final Inspection8/6/20028/7/20028/7/2002APART
DetailsRick Jackson
###-#### BRUCE phase one okay 8/7/2002 11:01:26 AM
BLD-Final8/6/20028/7/20028/7/2002AFAIL
DetailsCarl Dependahl
###-#### BRUCE; c/n onsite...adjust rated doors, complete firestops, 2nd fl restroom w.c. ht....pending State elev OK; ok to use, Phase 1 only; remainder of phased project in progress. 8/7/2002 12:07:30 PM
BLD-Conference8/5/20028/5/20028/5/2002APASS
DetailsCarl Dependahl
re partial...W/ BRUCE; WILL RECALL FOR 8-7; HANDRAILS INSTALLED AT "RAMP" TO MAIN ENTRY OF NEW PORTION. 8/5/2002 11:21:43 AM
BLD-Conference7/17/20027/17/20027/17/2002APASS
DetailsCarl Dependahl
rec'd mti's affidavit re part final...ok
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
FIRE-Conference7/8/20027/9/20027/9/2002APART
DetailsRick Jackson
BRUCE ###-#### FIRE CONF okay to relocate strobe at reception 7/9/2002 10:06:01 AM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
referred to 409 7/9/2002 2:55:42 PM
PubWorks Occupancy Approval 7/7/20027/8/2002 DONE
Drainage project complete, signed final 07/08/02. M.Strasser
Permanent Occupancy 7/3/20027/3/2002 DONE
Details
BLD-Final7/2/20027/2/20027/2/2002PCANC
DetailsJim Storey
BRUCE ###-####
BLD-Framing/Rough-in6/28/20027/1/20027/1/2002APART
DetailsTom Arcoraci
BRUCE ###-#### CEILING INSP- 7/1/2002 9:57:19 AM rid in basement ok add spacer bars check later 7/1/2002 9:58:01 AM
BLD-Framing/Rough-in6/3/20026/4/20026/4/2002APART
DetailsCarl Dependahl
###-#### bruce grids at narthex, corridors, bishop's lounge, b 6/4/2002 10:19:54 AM smt rooms ok, add spreader bars as needed, chk at final. 6/4/2002 10:20:26 AM
BLD-Framing/Rough-in6/4/20026/4/20026/4/2002AFAIL
DetailsCarl Dependahl
roomside firestopping at new bsmt area incomplete, conduits, ducts, data cables/sleeves ...recall
BLD-Conference5/15/20025/16/20025/16/2002ADONE
DetailsDave Hannah
BLD-Conference5/15/20025/15/20025/15/2002PPASS
DetailsCarl Dependahl
###-#### BRUCE CONFERENCE ONLY..re plaza area...ramp slope, ADA. 5/15/2002 6:10:43 PM
BLD-Framing/Rough-in5/6/20025/7/20025/7/2002APART
DetailsTony Young
GRID CEILING ###-#### BRUCE
see inspection report 5/7/2002 12:20:37 PM
BLD-Framing/Rough-in4/16/20024/17/20024/17/2002APART
DetailsRuss Owen
###-#### BRUCE passage 115 east side wall ok to cover there are 2 back to back ele boxes on the west side of this (east wall)contractor notified to protect with putty pads, can be verified at next inspection. Note there is no ceiling in this corriodor at this time.and the west side wall of this passage is drywalled.17/2002 1:23:59 PM 4/17/2002 1:25:08 PM
BLD-Framing/Rough-in4/3/20024/4/20024/4/2002APART
DetailsCarl Dependahl
###-#### bruce hallway, 4hr wall, & corridor #108 ok 4/4/2002 1:19:17 PM
BLD-Framing/Rough-in3/28/20023/29/20023/29/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/28/2002 at 13:29:39. Contact: .rm 165 & adjacent hall...solid grout at door 101. 3/29/2002 11:57:14 AM
BLD-Framing/Rough-in3/21/20023/22/20023/22/2002PPART
DetailsCarl Dependahl
###-#### bruce
hard lid frames in misc. rooms noted on job inspection card, bishop lounge wall cover, ok to cover 3/22/2002 2:59:04 PM
BLD-Conference3/18/20023/18/20023/18/2002PPASS
DetailsCarl Dependahl
###-#### bruce re doors at Cana chapel...add 20 min leaves at pair w / louvers 3/18/2002 4:53:40 PM
BLD-Framing/Rough-in3/8/20023/11/20023/11/2002PPASS
DetailsDave Hannah
###-#### BRUCE steel stud framing in sanctuary 3/11/2002 2:28:31 PM
BLD-Framing/Rough-in3/6/20023/7/20023/7/2002ANR
DetailsCarl Dependahl
###-#### BRUCE; need elec r/i at sanctuary 3/7/2002 10:51:13 AM
BLD-Framing/Rough-in2/20/20022/21/20022/21/2002APART
DetailsDave Hannah
bruce ###-#### second floor steel stud framing and firwe caulking on 4hr wall along a line 2/21/2002 4:17:40 PM
BLD-Framing/Rough-in2/15/20022/15/20022/15/2002PPART
DetailsRuss Owen
BRUCE ###-#### Small room next to elevator. 2/15/2002 2:53:28 PM
BLD-Conference2/8/20022/8/20022/8/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/8/2002 9:32:40 AM w/ Bruce re corrections
BLD-Framing/Rough-in2/6/20022/7/20022/7/2002APART
DetailsDave Hannah
BRUCE ###-#### base ment and second level stell stud framing ok carl d walked project wiyh me and bruce 2/7/2002 1:14:05 PM
BLD-Conference2/7/20022/7/20022/7/2002PCANC
DetailsCarl Dependahl
Added by Inspector: 340 On 2/7/2002 2:04:46 PM ok to rock bsmt walls; chk firestops as completed; fix exit passage & 4 hr wall at elec penetrations
BLD-Framing/Rough-in2/5/20022/6/20022/6/2002APART
DetailsCarl Dependahl
###-####; red iron... req's spec insp reports 2/6/2002 4:49:01 PM
BLD-Framing/Rough-in2/6/20022/6/20022/6/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 2/6/2002 12:15:24 PM ...nr, need elec. 2/6/2002 4:46:38 PM
BLD-Foundation1/7/20021/8/20021/8/2002APART
DetailsCarl Dependahl
###-####, masonry, MTI onsite... 1/8/2002 10:23:37 AM
BLD-Concrete12/27/200112/28/200112/27/2001ACANC
DetailsCarl Dependahl
concrete--jim-- ###-####--cancel per jim
BLD-Conference12/27/200112/27/200112/27/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/27/2001 9:56:18 AM w/




w/Jim re masonry insps



BLD-Foundation12/27/200112/27/200112/27/2001PPART
DetailsCarl Dependahl
###-####, masonry, pend MTI report 12/27/2001 5:19:58 PM
BLD-Conference12/26/200112/26/200112/26/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/26/2001 9:32:51 AM w/ mason re spec insps.
BLD-Foundation12/20/200112/21/200112/21/2001PPART
DetailsCarl Dependahl
###-#### pend mti report 12/21/2001 2:44:35 PM
BLD-Conference12/21/200112/21/200112/21/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/21/2001 9:46:24 AM w/ cm co....submit alt exiting to plan chk
BLD-Foundation12/19/200112/20/200112/20/2001APART
DetailsTom Arcoraci
###-#### pending spec insp 12/20/2001 12:06:49 PM
BLD-Foundation12/14/200112/17/200112/17/2001APART
DetailsCarl Dependahl
bruce ###-####, masonry, pend MTI report. 12/17/2001 10:59:11 AM
BLD-Foundation12/11/200112/12/200112/12/2001APART
DetailsCarl Dependahl
###-####...ext wall masonry, mti onsite, ok pend report.
12/12/2001 11:38:32 AM
BLD-Foundation12/3/200112/4/200112/4/2001APART
DetailsTom Arcoraci
bruce ###-#### spec insp 12/4/2001 11:19:30 AM
BLD-Foundation11/27/200111/28/200111/28/2001PPART
DetailsCarl Dependahl
found- bruce ###-#### masonry, pend insp report MTI 11/28/2001 9:42:02 AM
BLD-Foundation11/21/200111/26/200111/26/2001APASS
DetailsDave Hannah
###-#### BRUCE cmu grout placement spic inspection done by mti 11/26/2001 10:56:56 AM
BLD-Foundation11/20/200111/21/200111/21/2001PPASS
DetailsJim Storey
bruce ###-#### placed with special insp. 11/21/2001 3:48:49 PM
BLD-Foundation11/19/200111/20/200111/20/2001APART
DetailsTony Young
###-#### BRUCE
pend. si report 11/20/2001 1:00:31 PM
BLD-Concrete11/14/200111/15/200111/15/2001APART
DetailsCarl Dependahl
###-#### masonry, bed course east wall ok. pend spec insp. 11/15/2001 11:06:59 AM
BLD-Framing/Rough-in11/14/200111/15/200111/15/2001APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 11/14/2001 5:03:45 PM 2hr beams,cols, upper portion corridor B08 11/15/2001 10:52:21 AM
BLD-Concrete11/13/200111/14/200111/14/2001APART
DetailsCarl Dependahl
###-####, masonry, pend spec insp report 11/14/2001 3:49:19 PM
BLD-Framing/Rough-in11/13/200111/14/200111/14/2001ANR
DetailsCarl Dependahl
###-####
BLD-Conference11/8/200111/8/200111/8/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/8/2001 10:20:01 AM w/ framer & Bruce at site re bsmt corridor; complete firestops at wall to deck.
BLD-Foundation11/6/200111/7/200111/7/2001APART
DetailsCarl Dependahl
BRUCE ###-#### S.E. corner walls ok 11/7/2001 11:37:18 AM
BLD-Framing/Rough-in11/7/200111/7/200111/7/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/7/2001 11:40:01 AM upper portions wall at B08 cooridor, alcoved areas ok. Per previous conf. ok to delete tunnel and run walls to "rated" deck this area. Need verify rating req's of indivually protected col's/beams
BLD-Footing10/30/200110/31/200110/31/2001APART
DetailsRuss Owen
###-#### BRUCE >East footings ok also MTI on site and has approved. 10/31/2001 11:23:10 AM
BLD-Conference10/17/200110/18/200110/18/2001APASS
DetailsCarl Dependahl
###-#### BRUCE ...met w/ Scott H.LCA arch. and framer at site. Ok to run walls full ht to rated deck at bsmt for corridors (delete rated ceiling) detail to follow...ok to use partial rated lid at bsmt corridor alcoves...tunnel or suspended to provide equivalent around steel framing. 10/18/2001 9:54:04 AM
BLD-Conference10/1/200110/1/200110/1/2001PPASS
DetailsCarl Dependahl
for conf-- bruce -- ###-#### ...w CM & Achd atsite re sidewalks, landings; if rebuilt must meet code, consult arch re add'l req's & ADA . 1:12 slope ok at walks 10/1/2001 12:45:39 PM
BLD-Conference10/1/200110/1/200110/1/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/1/2001 10:13:46 AM w/ Gary Adams, MTI...onsite re struct details
BLD-Conference9/20/20019/20/20019/20/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/20/2001 5:19:13 PM reviewed mti soils reports, bsmt subgrade ok
BLD-Foundation9/12/20019/13/20019/13/2001APART
DetailsCarl Dependahl
wall bruce ###-#### masonry, bsmt pend mti re 9/13/2001 12:17:24 PM
BLD-Concrete9/7/20019/10/20019/10/2001APART
DetailsCarl Dependahl
###-#### masonry lift; MTI onsite 9/10/2001 10:45:33 AM
BLD-Conference9/10/20019/10/20019/10/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/10/2001 11:54:13 AM w/ Bruce, supt & Gary, spec. insp...need submittal from steel fab re "approved" status
BLD-Other9/5/20019/6/20019/6/2001APART
DetailsTony Young
MASONARY BRUCE ###-####
si on job, pending report, wip 9/6/2001 11:10:05 AM
BLD-Foundation9/5/20019/6/20019/6/2001APART
DetailsTony Young
BRUCE ###-####
pending si report , wip 9/6/2001 11:10:17 AM
BLD-Other8/30/20018/31/20018/31/2001ADONE
DetailsDave Hannah
column and masonary inspection Bruce ###-#### done using spec inspection 8/31/2001 11:56:30 AM
BLD-Foundation8/27/20018/28/20018/28/2001PPART
DetailsCarl Dependahl
###-#### BRUCE ok pend insp report, bsmt wall 8/28/2001 4:49:49 PM
BLD-Foundation8/27/20018/27/20018/27/2001PPART
DetailsCarl Dependahl
###-#### pend SI report 8/27/2001 3:42:22 PM
BLD-Foundation8/21/20018/21/20018/21/2001PPART
DetailsCarl Dependahl
###-#### bruce; bsmt walls ok pend spec insp r 8/21/2001 2:33:37 PM s 8/21/2001 2:33:43 PM
BLD-Footing8/14/20018/15/20018/15/2001PPART
DetailsCarl Dependahl
FT INSP & FOUND WALL- BRUCE ###-####
BLD-Wall cover8/13/20018/14/20018/14/2001ANH
DetailsDave Hannah
###-#### bruce carl on site no one there he left notice to reschedule 8/14/2001 10:28:34 AM
BLD-Framing/Rough-in8/14/20018/14/20018/14/2001PPART
DetailsCarl Dependahl
Bruce ###-#### activity rm lid at bsmt ok 8/14/2001 1:29:46 PM
BLD-Footing8/6/20018/7/20018/7/2001APART
DetailsCarl Dependahl
###-####
BLD-Foundation8/6/20018/7/20018/7/2001APART
DetailsCarl Dependahl
pend spec insp report 8/8/2001 2:39:26 PM
BLD-Footing7/25/20017/26/20017/26/2001PPART
DetailsTom Arcoraci
###-#### SPEC ON SITE 7/26/2001 4:38:12 AM
BLD-Footing7/20/20017/23/20017/23/2001APART
DetailsTony Young
pending s. i. report 7/23/2001 11:26:19 AM
BLD-Footing7/19/20017/20/20017/20/2001PPART
DetailsTony Young
###-####
s. i. report pending 7/23/2001 8:13:09 AM
Plan resubmittals received  7/19/2001 DONE
Received structural one set of plan resubmittals from Lombard Conrad Architects, forwarded same to Carl Dependahl. 7/19/01 DAR
BLD-Conference6/5/20016/5/20016/5/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/5/2001 1:32:46 PM w/ supt onsite; returned approved resub re: deletion of ramps at rm 160
Issue PAID IN FULL permit  5/23/2001 DONE
Routing - PLAN CHECK4/9/2001 4/19/2001 PASS
Approved with conditions after review of 4-16-01 resubmittal.
Plan Review Report  4/19/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/19/2001 PASS
Inspection Record Card- Bld  4/19/2001 DONE
Print Occupancy Form  4/19/2001 DONE
Telephone call  4/19/2001 DONE
called Scott Henson at ###-#### and i also called Dennis Robinson at ###-#### permit is ready for pick up ACHD is required...
Plan assigned to (CJW)12/29/2000 4/19/2001 PASS
DetailsCarl Westfall
4/19/01 11:48:40 CJW - activity updated through activity BLDA022 from case BLD00-03729.
Plan resubmittals received  4/16/2001 DONE
Received plan resubmittals from Lombard - Conrad Architects, forwarded same to Carl Westfall. 4/16/01 DAR
Routing - PLUMBING4/4/2001 4/9/2001 PASS
verify the necessity of 1st. floor fixtures discharging to basement sump with field inspector. provide secondary roof drainage for all roof drains. remove fire hose cabinets from the potable water system. if an automatic soap dispensor is used at mop sinks, provide a water supply for them. additional cross connection protection may be required.
Plan resubmittals received  4/4/2001 DONE
Received three sets of resubmittals, sheet number S7.4, forwarded same to Carl Westfall. 4/4/01 DAR
Routing Off Site - STRUCTURAL1/2/2001 4/3/2001 PASS
Sent structural plans to the consultanting engineer via PDQ. 1/2/01 DAR

Drawings approved by consultant Structural Engineer on April 3, 2001. (4-19-01) CJW
Routing - PLAN CHECK3/7/2001 3/30/2001  
Failed second UBC plan review. Faxed plan review report to architect. Included only failed items.
Routing - FIRE3/30/2001 3/30/2001 PASS
Added the previoulsy requested United Water water supply information, received from the architect.
Plan resubmittals received  3/29/2001 DONE
Received plan resubmittals from Lombard - Conrad Architects one set of sheets S2.2, S2.3, S7.2 , forwarded same to Carl Westfall. 3/29/01 DAR
Plan resubmittals received  3/21/2001 DONE
Received two sets of plan resubmittals from Lombard - Conrad Architects, forwarded same to Carl Westfall. 3/21/01 DAR
Plan Review Completed(1st rev)  3/7/2001  
Failed first UBC and UFC reviews
Routing - FIRE2/28/2001 3/7/2001  
Failed first UFC review. Faxed requirements/review comments to architect.
Routing - PLAN CHECK1/17/2001 2/28/2001  
Failed first UBC review.
Meeting  2/26/2001  
Met with the architect and went over the plan review report.
Plan Reviewer's activity  2/15/2001  
Failed first UBC review. UBC plan review started February 15, 2001 and finished February 27, 2001. A response is required from the architect. See the conditions list. A copy was given to the architect on Feb. 26, 2001.
Routing - PLUMBING1/12/2000 1/16/2001  
Failed first UPC review. fire dept. to review plans for compliance prior to plumbing review to determine if fire hose cabinets are allowed on the domestic water system.
Routing - PLANNING1/10/2001 1/12/2001 PASS
Approved per DRH00-182. CU approved by DAA.
Routing - PUBLIC WORKS12/29/2000 1/10/2001 PASS
Application received  12/29/2000  
Pending Assignment by MYS12/29/2000 12/29/2000 DONE
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  12/29/2000 DONE
Routing Off Site - STRUCTURAL3/30/2001    
Sent resubmittals to consultanting engineer via PDQ. 3/30/01 DAR