Case Summary (BLD) | | | 8/21/2012 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/9/2009 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 3/24/2003 | | |
|
|
|
|
Permanent occupancy | | | 7/18/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9256 issued 7-18-02 to the River Walk Apts., sec. 3 of 3.
|
BLD-Final | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | PASS |
Carl Dependahl
|
|
|
scott; Phone #: ###-####
|
Permanent Occupancy | | 7/17/2002 | 7/17/2002 | | DONE |
|
|
|
|
BLD-Final | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Final | 6/17/2002 | 6/17/2002 | 6/17/2002 | P | NR |
Carl Dependahl
|
|
|
SCOTT ###-####
|
BLD-Final | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | NR |
Carl Dependahl
|
|
|
scott ###-#### fn will recall 6/14/2002 5:14:35 PM
|
BLD-Final | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | NR |
Jim Storey
|
|
|
|
Fee Review-notes | 3/14/2001 | 3/14/2001 | 4/26/2002 | | DONE |
|
|
|
|
Temporary occupancy | | | 3/28/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4767 issued 3-27-02 to the River Walk Apts., Sec. 3 of 3.
|
BLD-Final | 3/27/2002 | 3/27/2002 | 3/27/2002 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/27/2002 3:20:42 PM c/n, handrail extensions, caulk-seal penetrations, complete misc finish items & obtain other permanent finals...ok for t/o
|
FIRE-Final Inspection | 3/25/2002 | 3/26/2002 | 3/26/2002 | A | PASS |
Rick Jackson
|
|
|
###-#### scott
|
BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/17/2002 | | NR |
Carl Dependahl
|
|
|
apts, wip. 1/17/2002 9:18:57 AM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 18:02:31. Contact: ###-####....keep c/n, 2hr wall at west ok to add 2nd layer....need complete firestops at 1hr lids added at "closets", drop clg areas & soffited areas at party walls. complete R.C. install at 2nd fl lids, ok to insul thru-out. 11/14/2001 11:00:27 AM
|
BLD-Energy code compliance | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### SCOTT insul ok. 11/14/2001 5:08:25 PM
|
BLD-Framing/Rough-in | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/14/2001 5:09:29 PM apt units all floors ok to cover,
|
BLD-Framing/Rough-in | 11/12/2001 | 11/13/2001 | 11/13/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 17:17:27. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/12/2001 | 11/12/2001 | 11/13/2001 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 11:18:37. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-#### SCOTT verbal c/n: complete firestops, 1hr lid at closets & soffit areas where missed, strap brg wall top plates as need. ok to insul. 11/6/2001 4:54:09 PM
|
BLD-Framing/Rough-in | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | NR |
Carl Dependahl
|
|
|
###-#### scott
|
BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | NR |
Carl Dependahl
|
|
|
fr insp -scott ###-####
|
BLD-Conference | 8/10/2001 | 8/10/2001 | 8/10/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/10/2001 4:47:29 PM c/n, firestops, 2hr wall, etc.
|
BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/10/2001 5:30:44 PM w/ Mike re elev. shaft at s-3 parking...need rated door
|
BLD-Conference | 6/29/2001 | 7/3/2001 | 7/3/2001 | A | PART |
Carl Dependahl
|
|
|
scott ###-#### please call before going out, mark resubmittal re shafts & hvac penetrations to comply w/ ubc 711.3 7/3/2001 2:04:46 PM
|
Plan resubmittals received | | | 6/22/2001 | | DONE |
|
|
|
Received two copies of revised sheetM3.10 and one copy of cover letter. Routed to Carl D. KMM
|
BLD-Conference | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/21/2001 1:29:53 PM e 2hr walls...draft-stops, fireblocks& ass'ys
|
BLD-Conference | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/19/2001 12:23:20 PM w/ owner, framer re 1hr const, 2hr walls
|
BLD-Conference | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | PASS |
Carl Dependahl
|
|
|
scott ###-####; initial conf, verbal c/n re 2hr wall 6/22/2001 4:27:21 PM
|
Issue PAID IN FULL permit | | | 6/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/11/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/11/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/11/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 6/8/2001 | | DONE |
|
|
|
Two sets of plan resubmittals from John Price of Tamura and Associates plus small document,forwarded same to Mike Phillips. 6/8/01 DAR
|
Plan Reviewer's activity | | | 6/8/2001 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/8/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/31/2001 | | 6/8/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 3/5/2001 | | 6/8/2001 | | PASS |
Mike Phillips
|
|
|
6/8/2001 16:19:30 M_P - activity updated through activity BLDA022 from case BLD01-00000.
|
Plan Reviewer's activity | | | 6/7/2001 | | FAIL |
|
|
|
Additional informaiton required for further review. Called and talked to John Price ands advised him of the issues.
|
Routing - PLANNING | 5/30/2001 | | 5/30/2001 | | PASS |
|
|
|
Per Boise Fiver System Permit #CFH00-00023 and Flood plain permit #cfh00-00024
|
Routing - PLANNING | 5/22/2001 | | 5/25/2001 | | PASS |
|
|
|
Approved per DRH00-161 & as per revised plans in the DR file dated received May 24,2001. Pending River Systems Permit approveal for CFH00-23 & 24.
|
Routing - PLAN CHECK | 5/7/2001 | | 5/21/2001 | | HOLD |
|
|
|
Waiting for resubmittals.
|
Plan resubmittals received | | | 5/21/2001 | | DONE |
|
|
|
Received two sets of plan resubmittals from Tamura and associates plus small docunents., forwarded same to Mike Phillips. 5/21/01
|
Plan Review Completed(1st rev) | | | 5/7/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 5/2/2001 | | 5/7/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/9/2001 | | 5/2/2001 | | FAIL |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 5/2/2001 | | FAIL |
|
|
|
Additional information required for further review.
|
Routing Off Site - STRUCTURAL | 4/24/2001 | | 4/26/2001 | | PASS |
|
|
|
Sent via PDQ to consulting engineer. 4/24/01 DAR
|
Plan resubmittals received | | | 4/10/2001 | | DONE |
|
|
|
Received three copies of revised sheets, A8.0, A8.1, A8.2, A10.1, S0.1, S1.1, S1.2, S2.1, S2.2, S3.1, S3.2, S9.0, S9.1 and three copies of revised calculations. Routed to Mike P. KMM
|
Routing - PLANNING | 4/3/2001 | | 4/9/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 3/31/2001 | | 4/3/2001 | | PASS |
|
|
|
per plans and 97 upc, pipe 1st floor water heater pan drains to garage floor separately also.
|
Routing - PARKS DEPARTME | 3/27/2001 | | 3/30/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/27/2001 | | DONE |
|
|
|
Received two copies of revised sheets C1.0. One copy of cover letter and one copy of attached revised parking garage plan showing the garage drain and sand and grease trap per the plumbing inspectors comments. Routed to Mike Phillips. Routed separate plans to Gary Ziegler and two separate copies to Lee Rice. KMM
|
Plan resubmittals received | | | 3/22/2001 | | DONE |
|
|
|
Received two copies of sheets A3.14, A3.17, A3.18 and A3.19. These are copies of units 7,10,11 & 12. These are enlarged floor plans of the new and revised units shown on sheets A2.1 thru A2.4. These were not included in the original submittal.
Routed all of above to Mike P. KMM
|
Routing Off Site - STRUCTURAL | 3/14/2001 | | 3/21/2001 | | FAIL |
|
|
|
contacted PDQ to take plans to outside eng. KMM
Additional information required for further review.
|
Routing - PUBLIC WORKS | 3/14/2001 | | 3/20/2001 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/14/2001 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 3/5/2001 | | DONE |
|
|
|
|
Application received | | | 3/5/2001 | | |
|
|
|
|