BLD-Conference | 4/10/2003 | 4/10/2003 | 4/10/2003 | A | PASS |
Carl Dependahl
|
|
|
called supt...left msg. 4/10/2003 11:19:19 AM
|
Fee Review-notes | 1/2/2001 | 1/2/2001 | 9/23/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/11/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/11/2002 | | DONE |
|
|
|
Perm. occ. Cert. #9336 issued 9-11-02 to the Shoreline Apartments parking garage.
|
BLD-Conference | 8/28/2002 | 8/29/2002 | 8/29/2002 | P | PASS |
Carl Dependahl
|
|
|
Re flood plain cert...not approved per J Wylie, Need flood base elevation #'s; told bldr, he'll advise...keep c/n...ok to use as this is parking structure. 8/29/2002 6:06:32 PM
|
BLD-Conference | 8/20/2002 | 8/26/2002 | 8/26/2002 | A | PASS |
Carl Dependahl
|
|
|
re flood cert....need further ok, eng'r to revise & show base elevation. 8/28/2002 2:21:58 PM
|
BLD-Final | 8/20/2002 | 8/20/2002 | 8/20/2002 | A | PART |
Carl Dependahl
|
|
|
struct ok, need flood cert approved by Jim Wylie 8/20/2002 2:24:14 PM
|
Permanent Occupancy | | 8/20/2002 | 8/20/2002 | | DONE |
|
|
|
|
BLD-Conference | 8/16/2002 | 8/19/2002 | 8/19/2002 | P | PASS |
Carl Dependahl
|
|
|
darrel....gave flood cert to Steve M. 8/20/2002 9:44:06 AM
|
Case Summary (BLD) | | | 8/19/2002 | | |
|
|
|
|
BLD-Final | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | NR |
Carl Dependahl
|
|
|
DARRELL; Phone #: ###-####
|
BLD-Conference | 6/24/2002 | 6/24/2002 | 6/24/2002 | P | PASS |
Carl Dependahl
|
|
|
rec'd complete(?) spec insp reports/ affidavit...need further clarification by eng'r...keep c/n
|
BLD-Final | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Carl Dependahl
|
|
|
c/n,need eng's letter stamped, complete insp reports...note, adjacent parking lot req's separate permits...per Pub. Wks. 5/16/2002 3:45:30 PM
|
MISC ACTIONS | | | 4/24/2002 | | DONE |
|
|
|
took parcel hold off per Tim H/George S.
|
BLD-Aging Inspection | 12/18/2001 | 12/18/2001 | 12/18/2001 | | NR |
Carl Dependahl
|
|
|
wip 12/18/2001 2:39:39 PM
|
BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/15/2001 4:40:27 PM w/ supt...need eng's ok w/ spec insp reports.
|
BLD-Aging Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | | NR |
Carl Dependahl
|
|
|
apt project, fnd permit 9/24/2001 9:21:18 AM
|
BLD-Foundation | 7/18/2001 | 7/25/2001 | 7/25/2001 | A | DONE |
Dave Hannah
|
|
|
345--4829 concrete slab poor crew had west 1/3 pured at time of arrival 7/25/2001 10:52:47 AM
|
BLD-Foundation | 7/18/2001 | 7/20/2001 | 7/20/2001 | A | PART |
Jim Storey
|
|
|
945--4829 north slab ok 7/20/2001 8:39:35 AM
|
BLD-Concrete | 7/3/2001 | 7/3/2001 | 7/3/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/3/2001 3:02:15 PM walls ok pend spec insp reports
|
BLD-Conference | 7/2/2001 | 7/2/2001 | 7/2/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/2/2001 9:07:27 AM w/ arch re opening at stairs
|
BLD-Foundation | 6/25/2001 | 6/26/2001 | 6/26/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### walls; south1/2 6/26/2001 3:22:52 PM
|
BLD-Conference | 6/25/2001 | 6/25/2001 | 6/25/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/25/2001 9:06:49 AM w/arch...need calcs for lintel at exist stair tower
|
BLD-Conference | 6/14/2001 | 6/14/2001 | 6/14/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/14/2001 1:56:29 PM RETURNED SUBMITTAL...GAVE TO MIKE P.
|
Additional plans submitted | | | 6/11/2001 | | DONE |
|
|
|
Received one copy of non blue print size proposal details for door #100. Routed to Carl D. KMM
|
BLD-Foundation | 6/7/2001 | 6/8/2001 | 6/8/2001 | A | PART |
Jim Storey
|
|
|
###-#### 5.3 to 10/a d wall rebar ok pending special insp. reports will place tue. 6/8/2001 9:26:58 AM
|
BLD-Conference | 6/8/2001 | 6/8/2001 | 6/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/8/2001 9:37:26 AM w/ Titan need scope of work for spec insp agcy. spoke w/ Darrell, will comply...have plans onsite for insp. 6/8/2001 9:37:58 AM
|
BLD-Conference | 6/7/2001 | 6/7/2001 | 6/7/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/7/2001 10:29:14 AM w/ bldr...watch adjacent fdn; concrete to be called for inspection....concrete only permit as per Mike P. 6/7/2001 10:41:19 AM
|
(F) Reprint permit | | | 4/25/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/24/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/13/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/13/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/13/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/13/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/13/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/13/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/13/2001 | | DONE |
|
|
|
left mess for doug tamura to verify plans are ready
|
Routing - PLAN CHECK | 4/2/2001 | | 4/12/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/12/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/3/2001 | | 4/12/2001 | | PASS |
Mike Phillips
|
|
|
4/12/2001 15:06:37 M_P - activity updated through activity BLDA022 from case BLD01-00011.
|
Routing - PLUMBING | 3/30/2001 | | 4/2/2001 | | PASS |
|
|
|
a vent for the inlet chamber of the flammanle liquids interceptor will be required, do not tie to other vents.
|
Routing - PLAN CHECK | 3/29/2001 | | 3/30/2001 | | |
|
|
|
Routing to plumbing.
|
Routing - FIRE | 3/29/2001 | 3/29/2001 | 3/29/2001 | | PASS |
|
|
|
|
Routing - FIRE | 3/29/2001 | | 3/29/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/29/2001 | | DONE |
|
|
|
Received three copies of revised sheets P1.0. One copy of cover letter Routed to Mike P. KMM
|
Routing - PLAN CHECK | 3/21/2001 | | 3/29/2001 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/29/2001 | | DONE |
|
|
|
received three copies each of C-1, C-2, C-3: routed to Fire
|
Plan resubmittals received | | | 3/28/2001 | | DONE |
|
|
|
Recieved three copies of revised sheets C-1, C-2, C-3 and one copy of cover letter. Routed to Mike P. KMM
|
Routing - PLUMBING | 3/16/2001 | | 3/21/2001 | | FAIL |
|
|
|
provide required garage floor drainage system with flammable liquids interceptor connected to the sanitary sewer system
|
Routing - PLAN CHECK | 3/13/2001 | | 3/16/2001 | | |
|
|
|
Routing to plumbing.
|
Plan resubmittals received | | | 3/16/2001 | | DONE |
|
|
|
Received three copies of revised sheets C-3, P1.0, - P8.0. One copy of cover letter. Routed to Mike P. KMM
|
Routing - PLUMBING | 3/12/2001 | | 3/13/2001 | | FAIL |
|
|
|
please provide a plan showing the ubc required garage drainage to an interceptor tied to the sanitary sewer system, note 13 page A5.0 refers to " pipe to sand and grease interceptor". Please provide a plan showing piping from downspout locations to interceptor.
|
Routing - PLAN CHECK | 2/9/2001 | | 3/12/2001 | | FAIL |
|
|
|
Routing to plumbing.
|
Routing Off Site - STRUCTURAL | 3/6/2001 | | 3/8/2001 | | PASS |
|
|
|
Second review. Contacted PDQ to take plans to outside eng. KMM
Second review complete
|
Plan resubmittals received | | | 3/8/2001 | | DONE |
|
|
|
Received one set of plan resubmittals from Mark Sanders Architect, forwarded same to Mike Phillips. 3/8/01 DAR
|
Plan resubmittals received | | | 3/6/2001 | | DONE |
|
|
|
Received one copy of revised set of prints, sheets C-3, A1.0, A2.0, A4.1, A5.0, A5.1, S1, S2, S3, S4, S5. Two copies of resubmitted structural calculations. Routed to Mike P. KMM
|
Plan resubmittals received | | | 3/1/2001 | | DONE |
|
|
|
Received two copies of revised sheets C-3, A1.0, A2.0, A4.1, A5.0, A5.1, S1, S2, S3, S4, S5. One copy of response letter and one copy of floor analysis and design of concrete slabs. Routed to Mike P. KMM
|
Plan resubmittals received | | | 2/16/2001 | | DONE |
|
|
|
RESUBMITTED 2 COPIES A0.1-A2.0-A2.1-A2.2A2.3A2.4A2.5A9.1A10.2/ AND RESPONSE LETTER TOOK TO MIKE PHILLIPS 2/16/2001/PE
|
Application received | | | 2/9/2001 | | DONE |
|
|
|
|
Routing - FIRE | 2/6/2001 | | 2/9/2001 | | FAIL |
|
|
|
APPENDIX III-A ISSUES
|
Routing - PUBLIC WORKS | 2/9/2001 | | 2/9/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 2/9/2001 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 2/2/2001 | | 2/6/2001 | | |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 2/6/2001 | | FAIL |
|
|
|
Additional information required for further review.
|
Routing Off Site - STRUCTURAL | 1/4/2001 | | 2/6/2001 | | FAIL |
|
|
|
Sent Plans to consulanting structural engineer via PDQ. 1/4/01 DAR
|
Routing - PLANNING | 1/22/2001 | | 2/2/2001 | | PASS |
|
|
|
The applicant must add 2 parking spaces to the grade level parking lot on 14th street. SAR
|
Routing - PLAN CHECK | 1/19/2001 | | 1/22/2001 | | |
|
|
|
|
Routing - PLUMBING | 1/17/2001 | | 1/19/2001 | | FAIL |
|
|
|
this is a 1-fr building so cast iron waste piping must be used interior and no plastic water service piping will be allowed inside the building, provide a plan showing floor drainage to an interceptor tied to the sanitary sewer.
|
Routing - PLANNING | 1/10/2001 | | 1/17/2001 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 1/4/2001 | | 1/10/2001 | | FAIL |
|
|
|
Requires street light plan per Hank. Requires drainage plan per Brian Murphy. 1/10/01 DAR
|
Additional plans submitted | | | 1/4/2001 | | DONE |
|
|
|
Received legal description from Tamura and Associates. 1/4/01 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 1/4/2001 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/2/2001 | | DONE |
|
|
|
|