Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00012
StatusFinaled
Name BEWS E L & SHIRLEY G
Site Address 12150 W FAIRVIEW AVE
Project NameKICK66 CONVIENCE STORE
Customer Number 
ePlanReviewNo
Description
To construct a new 4,000 sq.ft. single story, manufactured metal building with CMU exterior walls, convenience store. All construct per the approved plans, attached comment list and CABO/ANSI A117.1. Work to include all on site developement. Refer to BLD 01-00016 and 01-00017 for car wash building and fuel island canopy. DRH00-00075, PC#00003-01 MJP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/2/20037/2/20037/2/2003 DONE
Additional values from subcontractors.
Permanent occupancy  5/16/2002 DONE
Perm. Occ. Cert. #9140 issued 5-16-02 to Kicks 66 Convenience Store.
BLD-Final5/8/20025/9/20025/9/2002APASS
DetailsDave Hannah
mark ###-#### fn ok form perm occ 5/9/2002 8:36:44 AM
Code Occupancy Approval5/9/20025/9/20025/9/2002ADONE
DetailsCarol Montgomery
Scheduled by Inspector: CAM On 5/9/02 8:32:49 AM
DOC - Permit Finaled5/9/20025/9/20025/9/2002PPASS
DetailsCarol Montgomery
Finaled by inspector at 5/9/02 1:20:02 PM
Permanent Occupancy 5/4/20025/4/2002 DONE
Details
Fee Review-notes1/2/20011/2/20011/29/2002 DONE
BLD-Aging Inspection1/23/20021/23/20021/23/2002 DONE
DetailsDave Hannah
BLD-Final11/23/200111/23/200111/23/2001APART
DetailsDave Hannah
Added by Inspector: 425 On 11/23/2001 9:48:45 AM ok for temp occ needs plm and plz prm occ
Temporary occupancy  11/23/2001 DONE
t.c. # 4661 11/23/01 AML nEEDS PLUMBING FINAL AND STRUCTURAL FINAL AND LANDSCAPING
Code Occupancy Approval  11/21/2001 FAIL
Bonded $5,500. for temporary. Many landscape issues here and a drainage issue to be resolved. Needs to be scheduled before DR Committee at Worksession.
BLD-Final11/16/200111/19/200111/19/2001PCANC
DetailsDave Hannah
###-#### mark or dan fn -re-insp--cancel not ready
FIRE-Final Inspection11/16/200111/19/200111/19/2001PPASS
DetailsTroy Cobbley
OK for perm occ 11/20/2001 3:07:58 PM
BLD-Final11/15/200111/16/200111/16/2001ANR
DetailsDave Hannah
###-#### needs other sign offs 11/16/2001 9:00:21 AM
BLD-Framing/Rough-in11/2/200111/5/200111/5/2001APASS
DetailsDave Hannah
ceiling insp- re-insp -- jason ###-#### heavy grid sytem 11/5/2001 9:07:49 AM
BLD-Framing/Rough-in10/31/200111/1/200111/1/2001AFAIL
DetailsDave Hannah
###-#### dan suspended ceiling seismic pods 11/1/2001 9:56:21 AM
BLD-Framing/Rough-in10/1/200110/1/200110/1/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/01/2001 at 06:50:19. Contact: ###-####. rest rooms storage area coolers office ok to cover 10/1/2001 1:10:04 PM
BLD-Framing/Rough-in9/21/20019/25/20019/25/2001ANR
DetailsDave Hannah
fr ###-#### - kay needs rough ins from other trades 9/25/2001 8:54:02 AM
BLD-Framing/Rough-in9/14/20019/14/20019/14/2001PPASS
DetailsDave Hannah
###-#### grout inspection top 6 ft of west wall and west half of north wall first 4 ft of car wash walls 9/14/2001 11:08:59 AM
BLD-Concrete9/11/20019/12/20019/12/2001ANR
DetailsDave Hannah
store\\###-####
BLD-Other9/12/20019/12/20019/12/2001PPASS
DetailsDave Hannah
grout pour Kay Burrell ###-#### first 4 ft lift 9/12/2001 3:05:14 PM
BLD-Foundation7/17/20017/18/20017/18/2001APASS
DetailsTom Arcoraci
###-#### early am car wash ok also 7/17/2001 10:25:23 PM
BLD-Footing7/13/20017/16/20017/16/2001APASS
DetailsTom Arcoraci
###-#### AND CAR WASH FOOTS 7/15/2001 9:17:17 PM
BLD-Footing7/13/20017/13/20017/13/2001PFAIL
DetailsDave Hannah
###-#### crew is still working on rebar they have permit but no city approved plans on site crew canc puor till monday will recall inspection and have plans on site monday 7/13/2001 2:32:50 PM
(F) Reprint permit  7/3/2001 DONE
Issue PAID IN FULL permit  7/2/2001 DONE
Inspection Record Card- Bld  6/28/2001 DONE
Print Occupancy Form  6/28/2001 DONE
Routing - PLAN CHECK6/19/2001 6/25/2001 DONE
Plan Reviewer's activity  6/25/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/25/2001 DONE
Plan assigned to (M_P)1/3/2001 6/25/2001 PASS
DetailsMike Phillips
6/25/2001 14:57:36 M_P - activity updated through activity BLDA022 from case BLD01-00012.
Routing - PLUMBING6/14/2001 6/19/2001 PASS
per plans and resubmitted plans dated 6/13/01
Additional plans submitted  6/13/2001 DONE
Received three sets of plan resubmittals from Design Intelligence, forwarded same to Mike Phillips along with the small documents. 6/13/01 DAR
Plan resubmittals received  6/5/2001 DONE
Recived two sets of plan sheets of P2 of 4 from Harper Leavitt Engineering. forwarded same to Mike Phillips. 6/5/01 DAR
Plan Reviewer's activity  5/29/2001 FAIL
Additional informaiton required for further review.
Plan resubmittals received  5/25/2001  
Plan resubmittals received  5/10/2001  
received 3 copies of a-4--a-5--a-6---3 copies piping plans sheet p3 3 copies of comment 7 3 copies of comment 8 3 copies of comment 9 took to mike phillips
Plan resubmittals received  4/17/2001 DONE
Received one copy of P1, P2, P3, and P4 sheets. Sheet P2 is stamped approved by CDH. Routed to Mike P. KMM
Routing Off Site - C.D.H  4/17/2001 PASS
Routing - FIRE3/26/2001 3/28/2001 PASS
Routing Off Site - STRUCTURAL3/23/2001 3/26/2001 FAIL
Sent follow up review to outside enginering for review.
Third review failed. Sent with comments dated 3/26/01 MJP
Plan Reviewer's activity  3/26/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK3/1/2001 3/26/2001 FAIL
Routing to fire.
Plan resubmittals received  3/21/2001 DONE
Received one copy of structural plan check review comments, one copy of calculations supporting design, one copy of supplemental calculations for structural steel fueling canopy, one copy of calculations in response to comment #2 and one copy of calculations addressing comment #3. Routed to Mike P. KMM
Plan resubmittals received  3/8/2001 DONE
Received three copies of revised sheets P2, P3 and P4, Routed to Mike P. KMM
Routing Off Site - STRUCTURAL2/26/2001 3/1/2001 FAIL
Contacted PDQ to take resubmitted plans of 2/26/01 to outside eng. KMM
Additional information required for further freview.
2nd review failed sent copy of corretions to Architect on 3/6/01
Routing - PLUMBING2/28/2001 3/1/2001 FAIL
relocate floor sinks in food island to edge of millwork so that they are exposed, provide cleanouts for floor sinks in food island, branch line to flushometers is undersized, run 1 1/2" to two wc flushometers on the west side, carbinators require it's own rp, locate over drain, use solid covers on interceptors, per resubmittals 2/21/01
Routing - PLAN CHECK2/1/2001 2/28/2001  
Plan resubmittals received  2/26/2001 DONE
Received three sets of resubmittals of sheets S2,& S1 from Conrad & Bischoff, forwarded same to Mike Phillips. 2/26/02 DAR
Plan Reviewer's activity  2/23/2001 FAIL
Emailed responce requesting additional plans and Architect of record form to be submitted.
Plan resubmittals received  2/22/2001 DONE
Received plan resubmittals from Conrad & Bischoff Inc. Three sets each of structural caculations, plumbing plans,electrical plans and architectural plans. frowarded same to Mike Phillips. 2/22/01 DAR
Routing - PUBLIC WORKS1/31/2001 2/1/2001 PASS
Routing - PLANNING1/31/2001 1/31/2001 PASS
Approve per DRH00-75 and per landscape plan on file dated received 1/26/01.
Telephone call  1/30/2001 DONE
Sent FAX to Kirk Hansen regarding phone conversation. See copy in plans.
Routing Off Site - STRUCTURAL1/3/2001 1/25/2001 FAIL
Sent plans to consultalting engineer via PDQ. 1/3/01 DAR
Additional informaiton required for further review.
Plan Reviewer's activity  1/25/2001 HOLD
Sent submittal letter requesting architectural, stamped and signed plans.
Routing - PLUMBING1/23/2001 1/25/2001 FAIL
plumbing plans do not match architectural plans, show location of required interceptor venting for car wash and c-store, show interior carwash piping, show roof drainage for car wash, canopy and c-store, show water pipe sizing for restroom fixtures, P-1 shows two 4" sewer stubs to the building, P-2 shows one 3" and one 6" leaving the building, the 4" service line from the manhole to the restroom system requires 12.566 sq. inches of venting, the 6" sewer from the manhole to the interceptors at the kitchen and the carwash require 28.274 sq. inches of venting.
Routing Off Site - A.C.H.D1/23/20011/23/20011/23/2001 DONE
paid through ACHD cert. #01-00370-see bld00-03597
Routing - PLANNING1/18/2001 1/23/2001 FAIL
Need revised plans per DR conditions. Contacted Richard Cook at Briggs.
Routing - PUBLIC WORKS1/3/2001 1/18/2001 FAIL
Requires street light plan per Bill C. KMM
Application received  1/2/2001  
Routing - PLAN CHECK1/25/2001    
Plans ACCEPTED BY PLAN TECH     
Recd Pcfee & Taken To Pln CK     
Routing - PLAN CHECK3/28/2001    
Routing Off Site - STRUCTURAL5/14/2001    
Sent resubmittals to consulting structural engineer via PDQ. 5/15/01 DAR