Permit Information
Permit NumberBLD01-00033
StatusFinaled
Name ROBERT HALF INTERNATIONAL INC
Site Address 800 PARK BLVD Unit: (7 FLR)
Project NameMK PLAZA IV - 7TH FLR
Customer Number 
ePlanReviewNo
Description
(ROBERT HALF INTERNATIONAL) This building is fire sprinklered to meet high-rise provisions and for building area increase. To create a new 4,000 square foot office tenant space on the 7th floor of MK Plaza IV (North Side). This tenant space will take about 500 square feet of the adjacent tenant space (University of Idaho). Work is to include 1-hr corridor walls and tunnel, new and relocated corridor doors, and interior nonbearing walls all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. PC-0011-01 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy UNPAID FEE  4/20/2001 DONE
Perm. Occ. Cert. #8642 issued 4-20-01 to Robert Half International, Inc.
Permanent Occupancy 4/19/20014/19/2001 DONE
Details
BLD-Final4/13/20014/13/20014/13/2001PPART
DetailsTony Young
###-####
temp. occ. ok until plumbing is signed off, and door seals are on (missing one on double door) 4/13/2001 1:07:41 PM
FIRE-Final Inspection4/12/20014/12/20014/12/2001PPASS
DetailsRick Jackson
###-####
Fee Review-notes1/5/20011/5/20014/11/2001 DONE
BLD-Framing/Rough-in4/2/20014/2/20014/2/2001PPASS
DetailsRuss Owen
ceiling insp ken ###-####
BLD-Framing/Rough-in3/30/20013/30/20013/30/2001PFAIL
DetailsSteven Webb
###-#### C/n posted--wires need attention--wraps per code. elec. and mechanical approval to cover. 3/30/2001 3:14:09 PM
BLD-Conference3/16/20013/16/20013/16/2001PPASS
DetailsTony Young
###-####,framing inspection 3/16/2001 11:22:31 AM
ok to cover walls 3/16/2001 12:51:49 PM
BLD-Conference3/5/20013/5/20013/5/2001PPASS
DetailsTony Young
conf. on framing inspections to keep tenants in while doing work 3/5/2001 2:24:57 PM
Issue PAID IN FULL permit  2/16/2001 DONE
Routing - FIRE2/9/2001 2/14/2001 PASS
Plan Review Completed(1st rev)  2/14/2001 PASS
Routing - PLAN CHECK2/14/2001 2/14/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/14/2001 PASS
Inspection Record Card- Bld  2/14/2001 DONE
Print Occupancy Form  2/14/2001 DONE
Telephone call  2/14/2001 DONE
called left message for tom gave dollar amount
Plan assigned to (CJW)1/12/2001 2/14/2001 PASS
DetailsCarl Westfall
2/14/01 15:49:39 CJW - activity updated through activity BLDA022 from case BLD01-00033.
Routing - PLAN CHECK1/16/2001 2/9/2001 PASS
Plan Reviewer's activity  2/9/2001 PASS
UBC plan review started February 8, 2001 and finished the next day. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS1/12/2001 1/16/2001 PASS
Pending Assignment by MYS1/5/2001 1/12/2001 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  1/5/2001 PEND
Spoke with Katie Butler. She stated that Robert Half was taking over what use to be the Primary Health Space. The new space was not big enough so they took over part of the U of I space. In doing so they had to create a new fire exit, decreasing the U of I space. I told her that I would speak to you on Monday to see if you want her to take out twoseparate permits. One for each space. KMM
Received Certificate of Value  1/5/2001 DONE
Application received  1/5/2001