BLD-Final | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | NR |
Steven Webb
|
|
|
###-#### Electrical final not completed. 12/7/2001 10:52:12 AM
|
BLD-Final | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 12/7/2001 10:51:50 AM c. of c. #20960 issued. 12/7/2001 1:48:31 PM
|
DOC - Permit Finaled | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 12/7/2001 1:48:51 PM
|
BLD-Aging Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | | PART |
Steven Webb
|
|
|
wip 11/7/2001 8:05:57 AM
|
BLD-Energy code compliance | 9/7/2001 | 9/7/2001 | 9/7/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 9/7/2001 9:00:39 AM ok to cover--energy report needed prior to issuance of c. of c. /c/n 9/7/2001 9:44:23 AM
|
BLD-Framing/Rough-in | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PART |
Steven Webb
|
|
|
fr insp ###-#### dwight c/n posted-ok to insulate 8/31/2001 1:23:15 PM
|
BLD-Framing/Rough-in | 8/29/2001 | 8/30/2001 | 8/30/2001 | P | NR |
Steven Webb
|
|
|
###-#### call first to meet there No approved plans, air seal package not done, called builder and informed him and posted c/n 8/30/2001 2:46:30 PM
|
BLD-Framing/Rough-in | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | PART |
Jim Storey
|
|
|
SHEAR PANEL ###-####- DWIGHT
|
Override - Parcel Holds | | | 8/13/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/13/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/13/2001 | | |
|
|
|
|
BLD-Wall cover | 8/2/2001 | 8/6/2001 | 8/6/2001 | A | CANC |
Steven Webb
|
|
|
shir wall out side ###-#### Cancelled by contractor--not ready 8/6/2001 9:37:01 AM
|
Override - Parcel Holds | | | 8/6/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/2/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/2/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/2/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/2/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 7/11/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | FAIL |
Steven Webb
|
|
|
Dwight ###-#### Shear--C/N issued--to many items to list. 6/13/2001 11:52:20 AM
|
BLD-Aging Inspection | 5/16/2001 | 5/16/2001 | 5/16/2001 | | PASS |
Steven Webb
|
|
|
This is an aging activity--permit active 5/16/2001 11:29:20 AM
|
BLD-Foundation | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | PART |
Steven Webb
|
|
|
###-#### pouring at 3: wip--appears ok 2/28/2001 3:35:27 PM
|
BLD-Foundation | 2/26/2001 | 2/27/2001 | 2/27/2001 | P | CANC |
Steven Webb
|
|
|
late as possible Eric ###-#### Contractor cancelled--not ready. 2/27/2001 4:03:39 PM
|
BLD-Footing | 2/22/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Steven Webb
|
|
|
Fred ###-####
|
Issue PAID IN FULL permit | | | 2/14/2001 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 2/14/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/25/2001 | | DONE |
|
|
|
received fax from Joe Wood. only specified m.lam for garage and calculations of cantilevered joist, which seem to fail. i will red-line other items on this plan in order to issue Mr. Coobes a permit. future submittals will require plans to meet all requirements of Boise City before acceptance.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/25/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DJO) | 1/17/2001 | | 1/25/2001 | | PASS |
Dan Overy
|
|
|
1/25/2001 11:33:47 DJO - activity updated through activity BLDA022 from case BLD01-00036.
|
Plan Reviewer's activity | | | 1/19/2001 | | PEND |
|
|
|
accepted plans for routing without engineering with the agreement that red-lines and calcs would be submitted before issuance of permit. received one red-lined set with calculations. furthur review indicates problems with beam call-outs, missing footings, posts, re-inforcing, life-safety items, information not be used is still on plans, cantilevered joist calculations and roof frame. have contacted joe wood (designer). expecting phone call later this afternoon to discuss problems..
|
Print Pending Permit.LaserJet4 | | | 1/19/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 1/19/2001 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/19/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 1/8/2001 | 1/8/2001 | 1/8/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 1/8/2001 | | 1/8/2001 | | PASS |
|
|
|
|
Application received | | | 1/8/2001 | | |
|
|
|
|
Pending Assignment by DJO | 1/8/2001 | | | | |
Dan Overy
|
|
|
|