BLD-Final | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PASS |
Russ Owen
|
|
|
###-####
|
DOC - Permit Finaled | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 1/2/2002 5:33:10 PM
|
BLD-Final | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | FAIL |
Russ Owen
|
|
|
###-####. needs smoke/det. 12/11/2001 4:37:58 PM
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | PART |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/4/2001 | 9/4/2001 | 9/4/2001 | P | PART |
Russ Owen
|
|
|
###-#### kevinc/n posted. 9/4/2001 4:38:45 PM
|
BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | PART |
Russ Owen
|
|
|
###-####. need to have plans on site for a frame insp left note on ok to side sticker. 7/10/2001 10:45:10 AM
|
BLD-Framing/Rough-in | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | FAIL |
Russ Owen
|
|
|
shear ###-#### c/n posted. 7/6/2001 12:48:49 PM
|
BLD-Foundation | 5/30/2001 | 5/31/2001 | 5/31/2001 | P | PASS |
Russ Owen
|
|
|
found kevin ###-#### insulation installed at inside wall. slab now ready to pour.12/31/2001 2:35:26 PM 12/31/2001 2:41:19 PM
|
BLD-Foundation | 4/10/2001 | 4/10/2001 | 4/10/2001 | P | PASS |
Russ Owen
|
|
|
stemwall inspection Kevin ###-####
|
BLD-Foundation | 4/6/2001 | 4/9/2001 | 4/9/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 09:39:54. Contact: ###-####.
|
Application received | | | 1/11/2001 | | |
|
|
|
|
(F) Reprint permit | | | 1/11/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/11/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2001 | | DONE |
|
|
|
|