Fee Review-notes | 1/17/2001 | 1/17/2001 | 2/1/2002 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/18/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/18/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/18/2001 | | DONE |
|
|
|
|
Letter of compliance | | | 10/29/2001 | | DONE |
|
|
|
Letter of Compliance #20931 issued 10-29-01.
|
BLD-Final | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PASS |
Jim Sly
|
|
|
###-#### GREG
|
Override - Parcel Holds | | | 10/26/2001 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: Before issuing final occupancy, must submit modification for color change. Per Marty S.
|
BLD-Final | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PART |
Russ Owen
|
|
|
gregg ###-#### for temp occ. needs sign-off by zoning and s-i final report. 9/25/2001 12:51:51 PM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | CANC |
Joe Tawney
|
|
|
###-#### greg temp
|
BLD-Final | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | NR |
Tom Arcoraci
|
|
|
TEMP ONLY ###-#### GREG no code enf signature
9/17/2001 11:26:46 PM
|
FIRE-Final Inspection | 9/11/2001 | 9/12/2001 | 9/12/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK for certificate of completion 9/12/2001 1:26:30 PM
|
BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | | PART |
Tom Arcoraci
|
|
|
wip 9/10/2001 3:08:09 AM
|
FIRE-Final Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | FAIL |
Joe Tawney
|
|
|
Final Fail Plans incomplete for shell bldg 9/10/2001 3:33:47 PM
|
BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 16:01:33. Contact: ###-####. steel beam installed on header 7/9/2001 9:45:19 PM
|
BLD-Framing/Rough-in | 6/12/2001 | 6/13/2001 | 6/13/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by Inspector: 408 On 6/12/2001 10:23:26 PM ok to cover east and west walls need engineering change on center beam 6/13/2001 2:15:50 PM
|
BLD-Framing/Rough-in | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 6/12/2001 10:19:04 PM
|
BLD-Framing/Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | NR |
Tom Arcoraci
|
|
|
as per tom rescheduled for pm today no plans on site will recall again 6/11/2001 1:50:54 AM
|
BLD-Framing/Rough-in | 6/8/2001 | 6/11/2001 | 6/11/2001 | A | CANC |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 6/10/2001 | 6/10/2001 | 6/10/2001 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 6/10/2001 8:49:39 PM 6/10/2001 9:26:24 PM
|
BLD-Wall cover | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/06/2001 at 13:13:50. Contact: ###-####. ext shear nailing ok hd 8s not installed yet ext straps at north and west side installed 6/7/2001 11:07:03 AM
|
BLD-Wall cover | 6/1/2001 | 6/4/2001 | 6/4/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 12:21:15. Contact: ###-####. roof nailing ok 6/4/2001 10:09:56 AM
|
BLD-Foundation | 5/2/2001 | 5/3/2001 | 5/3/2001 | P | PART |
Russ Owen
|
|
|
AARON ###-#### special insp req. 12/3/2001 3:37:31 PM
|
BLD-Footing | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | PART |
Tom Arcoraci
|
|
|
aaron ###-#### ok pending spec insp mti 5/1/2001 2:25:16 PM
|
Inspection Record Card- Bld | | | 4/30/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/23/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/20/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/27/2001 | | 4/12/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/12/2001 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/12/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/12/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/12/2001 | | DONE |
|
|
|
talked to steed to verify plans are ready
|
Plan assigned to (M_P) | 1/17/2001 | | 4/12/2001 | | PASS |
Mike Phillips
|
|
|
4/12/2001 08:50:26 M_P - activity updated through activity BLDA022 from case BLD01-00107.
|
Routing - FIRE | 3/22/2001 | | 3/27/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/6/2001 | | 3/22/2001 | | |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 3/20/2001 | | DONE |
|
|
|
Received four copies of revised sheet L1, two copies of revised sheets A-1, A-7, S0, S1, P1. Two copies of revised calculations and one copy of cover letter. Routed to Mike P. KMM
|
Plan Review Completed(1st rev) | | | 3/6/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 3/1/2001 | | 3/6/2001 | | FAIL |
Bill Alexander
|
|
|
Lack fire hydrant and fire flows.
|
Routing - PLAN CHECK | 2/7/2001 | | 3/1/2001 | | |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 3/1/2001 | | FAIL |
|
|
|
Additional informaiton required for further review.
|
Routing - PUBLIC WORKS | 2/5/2001 | | 2/7/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/31/2001 | | 2/5/2001 | | |
|
|
|
|
Routing - PLANNING | 1/29/2001 | | 1/31/2001 | | PASS |
|
|
|
Approve per DRH00-50, and as noted on the landscape plan to still require final review and approval of the vegetation along the south side of the property.
|
Routing - PLUMBING | 1/31/2001 | | 1/31/2001 | | PASS |
|
|
|
upgrade existing water service to match new interior plumbing
|
Routing - PUBLIC WORKS | 1/17/2001 | | 1/29/2001 | | FAIL |
|
|
|
Requires proof of legal land division per April Miller. 1/29/01 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2001 | | DONE |
|
|
|
|
Application received | | | 1/17/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/17/2001 | | DONE |
|
|
|
|