To remodel a 4,215 sq.ft. existing retail tenant space per approved plans on file. Work to include, removing the tenant demising wall and incorporating adjacent tenant space into one space, construction of a new storefront system with roll up security grill, construction of new noncombustible partition, construction of one accessible restroom, construction of new one-hour rated egress access corridor, installation of a suspended ceiling system, Related miscelaneous interior finishes including shelving and counters. NOTE: This building is fully fire sprinklered and has a smoke control system. Any alteration or modification to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. The Smoke evacuation system shall be maintained as installed under the 1985 UBC. (P.C.#0051-01)*RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled12/2/200112/2/200112/2/2001APASS
DetailsRuss Owen
Added by Inspector: 407 On 12/2/2001 10:35:04 AM
Fee Review-notes1/19/20011/19/20015/24/2001 DONE
no mech found
Permanent occupancy UNPAID FEE  5/3/2001 DONE
Perm. Occ. Cert. #8665 issued 5-3-01 to Bathy & Body Works.
Permanent Occupancy 5/2/20015/2/2001 DONE
Details
BLD-Final5/1/20015/2/20015/2/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/01/2001 at 12:40:18. Contact: ###-####. ok for perm oc. 12/2/2001 10:34:38 AM
BLD-Final4/30/20015/1/20015/1/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/30/2001 at 14:27:51. Contact: ###-####. ok temp oc only needs penetrations in corridor sealed. 12/2/2001 9:20:40 AM
FIRE-Final Inspection4/26/20014/30/20014/30/2001PPASS
DetailsJoe Tawney
FIRE FN ANDY- ###-#### Final OK for permanant occupancy 4/30/2001 2:56:18 PM
FIRE-Alarm Testing4/26/20014/30/20014/30/2001PPASS
DetailsJoe Tawney
ANDY ###-#### ALRM Final OK on alarm system 4/30/2001 2:56:43 PM
BLD-Conference4/26/20014/26/20014/26/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/26/2001 12:37:43 PM ok to stock...no public access
FIRE-Sprinkler Rough-in4/20/20014/23/20014/23/2001APART
DetailsJoe Tawney
Eric ###-#### #1049 Rough in 4/23/2001 12:16:14 PM
BLD-Other4/18/20014/19/20014/19/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/18/2001 at 11:45:16. Contact: ###-####. ceiling grid ok, except rear cooridor is required to be rated,will need all penetrations fire stoped as this is not a hallway see approved plans.contractor notified. 11/19/2001 12:07:46 PM
FIRE-Sprinkler Rough-in3/22/20013/23/20013/23/2001PPART
DetailsJoe Tawney
OK on spklr rough in for hard lid area 3/26/2001 8:25:30 AM
BLD-Framing/Rough-in3/21/20013/22/20013/22/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/21/2001 at 13:07:02. Contact: ###-####.ok to rock subject to ele,mec,plm inspections.contractor notified. 3/22/2001 12:10:25 PM
BLD-Framing/Rough-in3/19/20013/20/20013/20/2001AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/19/2001 at 13:34:42. Contact: ###-####.add framing around girders and beams in corridor. 3/20/2001 12:45:18 PM
Issue & PRINT permit  3/9/2001 DONE
Case Summary (BLD)  3/8/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/8/2001 PASS
DetailsRon Hill
Print Occupancy Form  3/8/2001 DONE
Inspection Record Card- Bld  3/8/2001 DONE
Telephone call  3/8/2001 DONE
called kathy gave dollar amount
Plan assigned to (R_H)1/24/2001 3/8/2001 PASS
Details
3/8/2001 07:12:17 RMH - activity updated through activity BLDA022 from case BLD01-00139.
Routing - FIRE3/1/2001 3/7/2001 PASS
Routing - PLAN CHECK3/7/2001 3/7/2001 PASS
Received Certificate of Value  3/1/2001 DONE
Received revised cert. of value. New project value $172,092. Routed to Ron H. and put one copy in file. KMM
Routing - PLAN CHECK2/15/2001 3/1/2001 PEND
DetailsRon Hill
No corrections required on resubmittals, routed back to fire department for apporvals, permit pending fire department approval
Plan resubmittals received  2/28/2001 DONE
Received three copies of revised sheets, cover sheet, A3.1, A9.1, A9.2, A9.3, A10.4, A10.5, A10.7, A11.1, A11.2, A12.1. One copy of cover letter. Routed to Ron H. KMM

Routing - FIRE2/12/2001 2/15/2001 FAIL
DetailsRon Hill
NEED INFO ON AWNING & OVERHEAD TRELLIS
Plan Review Completed(1st rev)  2/15/2001 FAIL
Routing - PLAN CHECK1/25/2001 2/12/2001 FAIL
Plan Reviewer's activity  2/12/2001 FAIL
DetailsRon Hill
Faxed and mailed requirements to the architect. Routed to fire department.
Case Summary (BLD)  2/12/2001 DONE
Routing - PUBLIC WORKS1/24/2001 1/25/2001 PASS
Pending Assignment by MYS1/24/2001 1/24/2001 DONE
DetailsMarlene Southard
Application received  1/19/2001  
Recd Pcfee & Taken To Pln CK  1/19/2001 DONE
Plans ACCEPTED BY PLAN TECH  1/19/2001 DONE
Received Certificate of Value  1/19/2001 DONE