DOC - Permit Finaled | 2/1/2002 | 2/1/2002 | 2/1/2002 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 2/1/2002 8:15:56 AM
|
Fee Review-notes | 1/19/2001 | 1/19/2001 | 1/18/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/18/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8963 issued 12-18-01 to Covenant Presbyterian Church (addn.)
|
Permanent Occupancy | | 12/11/2001 | 12/11/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled 12/11/2001 9:40:19 AM
|
BLD-Final | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 09:45:13. Contact: ###-####. ok for perm occ. 12/11/2001 2:17:38 PM
|
Code Occupancy Approval | | | 12/10/2001 | | DONE |
|
|
|
Meets compliance - closed.
|
Code Occupancy Approval | | | 12/7/2001 | | PASS |
|
|
|
Meets compliance with CUP00-00048 - Signed Final
|
FIRE-Final Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/7/2001 1:02:44 PM Fire sprinkler system finaled
|
BLD-Final | 11/1/2001 | 11/2/2001 | 11/2/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 11/1/2001 2:30:24 PM needs fire life safty sign off 11/2/2001 4:29:12 PM
|
FIRE-Alarm Testing | 10/31/2001 | 11/1/2001 | 11/1/2001 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection 11/2/2001 11:53:46 AM
|
FIRE-Final Inspection | 10/31/2001 | 11/1/2001 | 11/1/2001 | P | FAIL |
Troy Cobbley
|
|
|
Fire/smoke damper needs to be wired, no approved plans on site, backflow preventor on sprinkler system not operating correctly 11/2/2001 11:54:49 AM
|
BLD-Final | 10/31/2001 | 11/1/2001 | 11/1/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/31/2001 at 12:32:25. Contact: ###-####.
|
BLD-Wall cover | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 15:40:34. Contact: ###-####.
|
BLD-Aging Inspection | 10/1/2001 | 10/1/2001 | 10/1/2001 | | DONE |
Dave Hannah
|
|
|
work in progress 10/1/2001 8:25:19 AM
|
BLD-Conference | 7/31/2001 | 7/31/2001 | 7/31/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 09:54:54. Contact: ###-####. draft stop on addn se corner ok to cover 7/31/2001 2:35:51 PM
|
BLD-Conference | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 14:37:34. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/27/2001 | 6/29/2001 | 6/29/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 10:54:18. Contact: ###-####. roof sheating and framing 6/29/2001 1:05:08 PM
|
BLD-Framing/Rough-in | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 10:53:28. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/20/2001 at 09:48:11. Contact: ###-####. shear walls and trusses on s.e. add 6/21/2001 9:21:05 AM
|
BLD-Framing/Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 09:50:43. Contact: ###-####. no time left in day 6/19/2001 4:56:50 AM
|
BLD-Conference | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 08:29:55. Contact: ###-####. 6/12/2001 1:51:50 PM
|
BLD-Foundation | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | NR |
Dave Hannah
|
|
|
gAry ###-####
|
BLD-Footing | 4/20/2001 | 4/23/2001 | 4/23/2001 | P | PART |
Dave Hannah
|
|
|
ft insp gary---- ###-#### crew is woking on footing area they wont to pour is ok 4/23/2001 2:59:42 PM
|
Issue PAID IN FULL permit | | | 4/5/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/3/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/3/2001 | | DONE |
|
|
|
called Steve Paulick ###-####
|
Routing Off Site - STRUCTURAL | 3/26/2001 | | 4/3/2001 | | PASS |
|
|
|
Sent resubmittals to consultanting engineer via PDQ
|
Plan assigned to (MLO) | 1/22/2001 | | 4/3/2001 | | PASS |
Mike Otto
|
|
|
4/3/2001 14:50:25 MLO - activity updated through activity BLDA022 from case BLD01-00144.
|
Routing - FIRE | 3/27/2001 | | 3/28/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/26/2001 | | 3/27/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/26/2001 | | DONE |
|
|
|
Received plan resubmittals from Olson and Associates, three sets of Architucal, Plumbing , Mechanical and Electrical sheets plus small documents. Forwarded all to Mike Otto. 3/26/01 DAR
|
Routing - PUBLIC WORKS | 3/9/2001 | | 3/12/2001 | | PASS |
|
|
|
plans returned to plan review
|
Plan Review Completed(1st rev) | | | 3/1/2001 | | FAIL |
|
|
|
plans returned to plan review
|
Routing - FIRE | 2/26/2001 | | 3/1/2001 | | FAIL |
|
|
|
access, hydrants, water supply
|
Routing Off Site - STRUCTURAL | 1/26/2001 | | 2/26/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. Waiting for Soils Report. KMM
|
Routing - PLAN CHECK | 2/12/2001 | | 2/26/2001 | | FAIL |
|
|
|
corrections mailed and faxed to architect. MLO
|
Plan resubmittals requested | | | 2/26/2001 | | FAIL |
|
|
|
ubc and structural corrections
|
Routing - PLUMBING | 2/9/2001 | | 2/12/2001 | | PASS |
|
|
|
add alt. A note- 2" vent connection to existing must be 6" above flood rim of fixture, thermol expantion protection required
|
Routing - PLANNING | 2/8/2001 | | 2/9/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 2/5/2001 | | 2/8/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/5/2001 | | DONE |
|
|
|
Received five copies of revised civil sheets C2 and C2.1 and one copy of O&M manual. Put with plans. KMM
|
Routing - PUBLIC WORKS | 1/26/2001 | | 2/2/2001 | | FAIL |
|
|
|
Requires drainage plan revisions. Per Brian M. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 1/26/2001 | | DONE |
|
|
|
Received Revised foundation calcs for soil bearing pressure of 1500 psf. Put with plans. Spoke with Brian about drainage calcs. I will route to him with out and let him speak with the engineer. KMM
|
Plan routing begun/NEW & ADDTN | | | 1/26/2001 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/22/2001 | | HOLD |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/22/2001 | | HOLD |
|
|
|
Requires
1. Soils report. They stated a PSF of 2000.
2. Drainage Calcs.
3. O & M manual
Contacted Steve Pavlick of these needs. KMM
|
Received Certificate of Value | | | 1/19/2001 | | DONE |
|
|
|
|
Application received | | | 1/19/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/19/2001 | | DONE |
|
|
|
|