BLD-Final | 5/9/2001 | 5/10/2001 | 5/10/2001 | A | PASS |
Steven Webb
|
|
|
Rick ###-#### C. of C. #20423 issued 5/10/2001 8:47:41 AM
|
DOC - Permit Finaled | 5/10/2001 | 5/10/2001 | 5/10/2001 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 5/10/2001 8:47:45 AM
|
BLD-Final | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | FAIL |
Steven Webb
|
|
|
Rick ###-#### C/N issued--Penetrations in garage needs fire caulking. 5/9/2001 11:41:49 AM
|
BLD-Framing/Rough-in | 2/22/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Steven Webb
|
|
|
###-####
|
BLD-Energy code compliance | 2/23/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Steven Webb
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | FAIL |
Steven Webb
|
|
|
###-####; air seal package needed, bci ceiling joist in family room needs installated correctly. 2/22/2001 2:46:46 PM
|
BLD-Framing/Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | PASS |
Steven Webb
|
|
|
shear Rick ###-#### SHEAR--OK to side. 2/14/2001 4:07:43 PM
|
BLD-Foundation | 1/31/2001 | 2/1/2001 | 2/1/2001 | P | PART |
Steven Webb
|
|
|
###-#### hd not installed at time of inspection 2/1/2001 2:03:30 PM
|
BLD-Footing | 1/31/2001 | 1/31/2001 | 1/31/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 1/31/2001 10:49:17 AM setbacks and soil ok, reviewed rebar requirements, not totally inplace at time of inspection. 1/31/2001 2:29:25 PM
|
BLD-Footing | 1/30/2001 | 1/31/2001 | 1/31/2001 | A | CANC |
Steven Webb
|
|
|
rick ###-#### Contractor cancelled, wanted pm inspection not am. 1/31/2001 10:50:22 AM
|
Plan assigned to (DJO) | 1/26/2001 | 1/26/2001 | 1/30/2001 | | PASS |
Dan Overy
|
|
|
1/30/2001 13:58:34 DJO - activity updated through activity BLDA022 from case BLD01-00155.
|
Issue PAID IN FULL permit | | | 1/30/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/29/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/29/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2001 | | DONE |
|
|
|
TALKED TO TRADEWINDS TO VERIFY PLANS ARE READY
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/26/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 1/26/2001 | | PEND |
|
|
|
have spoken with designer, engineer and contractor about additional engineered calculations that will be needed for 1" SSTB anchor bolts at garage and footing/column design for 27000 pound concentrated load at rear of structure.
|
Print Pending Permit.LaserJet4 | | | 1/26/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 1/26/2001 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2001 | 1/22/2001 | 1/25/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 1/22/2001 | 1/22/2001 | 1/24/2001 | | PASS |
|
|
|
new plans to be submitted. new plan submitted.
|
Application received | | | 1/22/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 1/25/2001 | 1/25/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 1/22/2001 | | | | PEND |
Dan Overy
|
|
|
|