Fee Review-notes | 7/2/2003 | 7/2/2003 | 7/2/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Fee Review-notes | 1/23/2001 | 1/23/2001 | 1/18/2002 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/15/2002 | 1/15/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/15/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9000 issued 1-15-02 to Carl's Cycle Sales.
|
BLD-Final | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 15:08:25. Contact: ###-####. ok for perm occ 12/13/2001 10:40:42 AM
|
FIRE-Final Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 12/5/2001 2:15:48 PM Fire life/safety finaled. Fire alarm finaled. Sprinkler system not finaled
|
BLD-Framing/Rough-in | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 11:23:07. Contact: ###-####.
int. framing in existing shop ok pending trades 10/15/2001 8:21:38 AM
|
FIRE-Final Inspection | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | PART |
Joe Tawney
|
|
|
OK to occup. new showroom waiting for rough-in on existing 9/28/2001 5:41:50 PM
|
FIRE-Alarm Testing | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | NR |
Joe Tawney
|
|
|
approved plans not on site but system is installed. 9/28/2001 5:39:34 PM 9/28/2001 5:40:27 PM
|
BLD-Final | 9/27/2001 | 9/28/2001 | 9/28/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 16:16:06. Contact: ###-####.
showroom ok for temp.occ. pending FLSaftey sign-off, c/n on ADA restrooms 9/28/2001 4:26:40 PM
|
PubWorks Occupancy Approval | | | 9/28/2001 | | DONE |
|
|
|
Drainage project complete 9/28/01. G.Fitts.
|
BLD-Final | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 10:42:28. Contact: ###-####.
parts room ok for temporary occupy after fire and life signs off. NOTE; NO OCCUPANCY CERTIFICATE TO BE ISSUED YET, UNTIL COMPLETE SCOPE OF WORK IS FINISHED. 9/20/2001 10:34:11 AM
|
FIRE-Final Inspection | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | FAIL |
Joe Tawney
|
|
|
Final on shop area only. Fail mount fire Ext and exit door hdwre 9/20/2001 9:25:52 AM
|
FIRE-Final Inspection | 9/20/2001 | 9/20/2001 | 9/20/2001 | P | PART |
Joe Tawney
|
|
|
Reinsp OK for temporary Occ of new shop in NW corner of bldg 9/20/2001 4:14:54 PM
|
BLD-Final | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 10:32:10. Contact: ###-####.
|
BLD-Conference | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/30/2001 3:50:10 PM ok to use new parts room w operational wet sprinklers at that area; ok per Joe T.
|
BLD-Framing/Rough-in | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 07:57:22. Contact: ###-####.
interior steel headers between new and old ok pending eng. letter on bolts and s.i. on welds, ok to cover after welding inspection 8/24/2001 4:14:16 PM
|
BLD-Footing | 8/22/2001 | 8/22/2001 | 8/22/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 07:30:38. Contact: ###-####.
int. pads for beam between show rooms 8/22/2001 3:51:47 PM
|
BLD-Framing/Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 07:31:31. Contact: ###-####.office walls and ceiling in 3 offices 8/22/2001 3:53:16 PM
|
BLD-Conference | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 16:02:39. Contact: ###-####.
conf. on final, temp. occ., ada reqmts., etc. 8/14/2001 12:28:57 PM
|
BLD-Framing/Rough-in | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 14:37:55. Contact: ###-####. 8/3/2001 9:19:58 AM non load bearing walls inside ext area still need elec inspection 8/3/2001 11:23:19 AM
|
BLD-Framing/Rough-in | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/24/2001 at 10:53:00. Contact: ###-####.c/n on part, ok to rock unaffected areas, verify rest of upper fire wall later 7/25/2001 10:55:27 AM
|
BLD-Framing/Rough-in | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PART |
Tony Young
|
|
|
c/n posted, ok to insulate unaffected areas 7/18/2001 3:23:58 PM
|
BLD-Framing/Rough-in | 7/16/2001 | 7/17/2001 | 7/17/2001 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 10:31:21. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/17/2001 | 7/17/2001 | 7/17/2001 | P | CANC |
Tony Young
|
|
|
no time 7/17/2001 6:31:44 PM
|
BLD-Conference | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PART |
Tony Young
|
|
|
take plan back yo architect for clarification of 1 hr sep. wall at added room 7/11/2001 11:54:33 AM
|
BLD-Conference | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | CANC |
Tony Young
|
|
|
re-schedule 7/10/2001 4:05:23 PM
|
BLD-Conference | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 09:17:22. Contact: ###-####.
|
BLD-Conference | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/26/2001 at 13:29:22. Contact: ###-####.
conf. on adding to plan, told them to have arch. draw and write up addition and changes and call back for review// may need to go to plan review 6/27/2001 3:24:59 PM
|
BLD-Conference | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 15:04:25. Contact: ###-####. CN ISSUED NEED NEW DETAILS FOR ONE HOUR WALL WHERE JOISTS NOW PASS THRU IT 6/5/2001 10:36:58 AM
|
BLD-Conference | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PASS |
Tony Young
|
|
|
###-####.
conf. on sheetrock on existing roof deck, ok if stepped on during construction 6/1/2001 10:02:13 AM
|
BLD-Footing | 5/23/2001 | 5/24/2001 | 5/24/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 14:26:27. Contact: ###-####.
not ready yet, pending s. i. report 5/24/2001 9:39:26 AM
|
BLD-Footing | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 10:27:46. Contact: ###-####.
already poured, pending S. i. report 5/9/2001 3:49:10 PM
|
BLD-Conference | 5/7/2001 | 5/7/2001 | 5/7/2001 | A | PASS |
Tony Young
|
|
|
met w/ dixie and heating contractor on area seperation wall and other items 5/7/2001 10:02:51 AM
|
BLD-Foundation | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 10:56:42. Contact: ###-####.
pending s. i. tests 5/7/2001 3:34:31 PM
|
BLD-Footing | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/04/2001 at 11:27:34. Contact: ###-####.
verbal corrections, pending s. i. report 5/4/2001 2:53:37 PM
|
BLD-Conference | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 07:16:46. Contact: ###-####.
conference on special inspections 5/2/2001 3:45:37 PM
|
Issue PAID IN FULL permit | | | 4/27/2001 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/16/2001 | | 4/26/2001 | | PASS |
|
|
|
Sent resubs to consultanting engineer via PDQ. 4/16/01 dar
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/26/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2001 | | DONE |
|
|
|
Called permit ready, fees due, and need ACHD receipt.
|
Plan assigned to (MLO) | 1/24/2001 | | 4/26/2001 | | PASS |
Mike Otto
|
|
|
4/26/2001 11:26:26 MLO - activity updated through activity BLDA022 from case BLD01-00171.
|
Plan resubmittals received | | | 4/13/2001 | | DONE |
|
|
|
Received 3 sets of plan resubmittals from Lynn A. Brown, forwarde same to Mike Otto. 4/13/01 DAR This resubmittal has structural redesigns included with no calculations or cover letter provided. To date, have still not received soils report which has delayed structural review of structural revisions submitted 3/23/2001. Have had phone conversations with the architect and contractor regarding the missing soils report. MLO
|
Telephone call | | | 4/13/2001 | | DONE |
|
|
|
spoke with Darren Turchot, engineer about providing calculations and written reponse for the changes which need to be provided prior to sending to outside engineer for review. MLO
|
Routing - PUBLIC WORKS | 3/22/2001 | | 4/3/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/23/2001 | | DONE |
|
|
|
Received plan resubmittals from Lynn Brown Architect three sets of sheet A-8. Also small documents, forwarded same to Mike Otto
|
Plan resubmittals requested | | | 3/22/2001 | | FAIL |
|
|
|
structural corrections
|
Routing Off Site - STRUCTURAL | 3/20/2001 | | 3/22/2001 | | FAIL |
|
|
|
Contacted PDQ to take resubmitted plans of 3/19/01 out to outside eng. KMM Corrections faxed and mailed to architect. MLO
|
Routing - FIRE | 3/20/2001 | | 3/22/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/19/2001 | | 3/20/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/19/2001 | | DONE |
|
|
|
Received three copies of revised sheets S-1, S-2, A-1, A-3, A-4, A-5, A-6, A-7, A-8, M-1, M-4, P-1 and E-2. Two copies of response letter dated Feb. 26 and two copies of response letter dated Feb 2. One copy of water bolum letter from United Water. One sample. Routed to Mike O. KMM
|
Plan resubmittals requested | | | 2/26/2001 | | FAIL |
|
|
|
structural corrections.
|
Routing Off Site - STRUCTURAL | 1/2/2001 | | 2/26/2001 | | FAIL |
|
|
|
2/2/01 - Left message with architect to provide additional plans for outside structural review. MLO I had plan in my hold box. Contacted PDQ to take to outside eng. Correction list mailed and faxed to architect.
|
Plan Review Completed(1st rev) | | | 2/7/2001 | | FAIL |
|
|
|
plans returned to plan check
|
Routing - FIRE | 2/2/2001 | | 2/7/2001 | | FAIL |
|
|
|
hydrants,fire flow, storage info
|
Routing - PLAN CHECK | 1/26/2001 | | 2/2/2001 | | FAIL |
|
|
|
corrections sent to architect.
|
Plan resubmittals requested | | | 2/2/2001 | | FAIL |
|
|
|
UBC corrections.
|
Routing - PLANNING | 1/25/2001 | | 1/26/2001 | | PASS |
|
|
|
Approve per DRH99-40.
|
Routing - PLUMBING | 1/26/2001 | | 1/26/2001 | | PASS |
|
|
|
s.s. vent must not connect with vents upstream of the oil and flammable liquids interceptor, add a vent to the upstream chamber of the interceptor, do not connect to the downstream vent.
|
Routing - PUBLIC WORKS | 1/24/2001 | | 1/25/2001 | | FAIL |
|
|
|
Requires drainage plan revision per Brian Murphy. 1/25/01 DAR
|
Plan routing begun/NEW & ADDTN | | | 1/24/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/24/2001 | | DONE |
|
|
|
Requires 1. Drainage calculations. 2. Arch. Plumb. and Mech. sheets are stamped (For agency review only. Construction documents will incorporate all review comments). John M. stated to let Lynn Brown deceide if he wants to submit new plans with out the above statement or wait for review comments and resubmit. Contacted Lynn Brown concerning the above requirements. KMM
Spoke with Dennis Fletcher from Tealy's he stated that calcs were on C-2 sheet. I could see were he listed what calcs should have calculated but no calculations. I told him I would send to Brian M. and let him decide if those will do. KMM
|
Meeting | | | 1/24/2001 | | DONE |
|
|
|
Spoke with Lynn-- He stated he will leave plans as is and will take care of for review only stamp when he gets Mike Otto's review comments. KMM
|
Telephone call | | | 1/24/2001 | | DONE |
|
|
|
Spoke with Dennis Fletcher about drainage calcs. He stated they were on C-2 sheet. I could not see calculations but did see what was calculated. I told him I would route to Brian and let him decide if that was ok.. KMM
|
Received Certificate of Value | | | 1/23/2001 | | DONE |
|
|
|
|
Application received | | | 1/23/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | | | | | |
|
|
|
waiting for soils report before routing plans to outside engineering. MLO
|