Case Summary (BLD) | | | 6/30/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 6/30/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 6/30/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 6/30/2005 | | |
|
|
|
|
BLD-Final | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 10:44:05. Contact: ###-####. l/c ok 1/30/2002 4:31:57 PM
|
DOC - Permit Finaled | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 1/30/2002 4:32:00 PM
|
CHANGE ISSUED DATE | | | 1/25/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/25/2002 | | DONE |
|
|
|
added additional value of $65,000.00 per correction notice posted by Russ Owen. Added additional comments per Dan Overy. Added additional value, paid additional fees and issued.
|
Inspection Record Card- Bld | | | 1/25/2002 | | DONE |
|
|
|
|
BLD-Final | 1/23/2002 | 1/24/2002 | 1/24/2002 | P | FAIL |
Russ Owen
|
|
|
###-####. Note basement has been completely remodled and a guard rail would be required at stairs,also temp glass in bathroom secure egrees ladders,and install hand rail. Note: a post support at the stairs has been roved and will neeed to be replaced. Contractor notified of the above. 1/24/2002 3:40:13 PM
|
BLD-Aging Inspection | 12/24/2001 | 12/24/2001 | 12/28/2001 | | NR |
Carl Dependahl
|
|
|
wip 12/28/2001 6:34:29 PM
|
BLD-Framing/Rough-in | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### dave
|
BLD-Energy code compliance | 10/19/2001 | 10/22/2001 | 10/22/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### DAVE ...air seal ok...frame c/n 10/22/2001 12:51:45 PM
|
BLD-Framing/Rough-in | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/22/2001 12:49:56 PM c/n, ok to insul...exist beam reqs post, fireblock, etc.
|
BLD-Energy code compliance | 10/16/2001 | 10/17/2001 | 10/17/2001 | P | NR |
Jim Storey
|
|
|
###-#### no plans oite c/n mech. 10/17/2001 4:53:14 PM
|
BLD-Energy code compliance | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | NR |
Tom Arcoraci
|
|
|
###-#### DAVE needs all rough ins and framing insp 10/16/2001 10:22:08 AM
|
BLD-Conference | 9/5/2001 | 9/5/2001 | 9/5/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 10:58:54. Contact: ###-####....need detailed plan for fnd or post beam 9/5/2001 3:32:21 PM
|
BLD-Conference | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 16:42:20. Contact: ###-####. need specify footing for ext walls;.. apparently was remodeled/added porch...bears roof. short landing ok at stairs due to exist. condition 8/30/2001 12:18:00 PM
|
CHANGE STATUS TO (ISS) | | | 8/29/2001 | | DONE |
|
|
|
|
BLD-Aging Inspection | 8/6/2001 | 8/6/2001 | 8/6/2001 | | FAIL |
Carl Dependahl
|
|
|
fire repair; no call 8/6/2001 10:07:05 AM
|
DOC - Permit Expired | 8/6/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Carl Dependahl
|
|
|
Expired by inspector at 8/6/2001 10:07:05 AM
|
BLD-Aging Inspection | 5/30/2001 | 5/30/2001 | 5/30/2001 | | FAIL |
Carl Dependahl
|
|
|
no call 5/30/2001 9:43:43 AM
|
Plan assigned to (DJO) | 1/29/2001 | 1/29/2001 | 1/29/2001 | | PASS |
Dan Overy
|
|
|
1/29/2001 16:11:02 DJO - activity updated through activity BLDA022 from case BLD01-00214.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/29/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/29/2001 | | DONE |
|
|
|
|
Application received | | | 1/29/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/29/2001 | | |
|
|
|
|