Permit Information
Permit NumberBLD01-00220
StatusFinaled
Name FURNITURE ROW
Site Address 101 N COLE RD
Project NameFURNITURE ROW
Customer Number 
ePlanReviewNo
Description
FURNITURE ROW * To construct a 27,296 square foot, one story, Type VN Unlimited area, fully fire sprinklered shell only addition and remodel the existing 27,662 square foot building as a fully fire sprinklered shell. The intended uses in the building are for three separate Group M Occupancy tenants. Grading and drainage for addition and parking lot under separate permit.DRH01-00001, PC#0079-01 MLO 60 foot open yards must be maintained around this building to comply with unlimited area requirements. Fire sprinklers used for unlimited area. No occupancy of any of the tenant spaces is authorized under this shell permit. Separate plans and permits for tenant improvements are required for each tenant space. MLO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/30/20011/30/200112/16/2002 DONE
3/9/01 bld01-00286 was charged a plancheck...I moved fees to this permit...lh 10/17--they totaled value on one permit, there are total of 5. applied to permits. bld01-00220,02384,02386 lh
BLD-Final1/11/20021/11/20021/11/2002PPASS
DetailsRuss Owen
Scheduled by Inspector: 407 On 1/11/2002 1:50:47 PM Ok perm oc. cards delivered tto store this day.1/11/2002 1:57:14 PM 1/11/2002 2:02:09 PM
Letter of compliance  1/2/2002 DONE
Letter of Compliance #22098 issued 1-2-02.
FIRE-Final Inspection1/15/200211/18/200111/18/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 1/15/2002 12:26:58 PM Fire life/safety finaled
BLD-Final11/9/200111/9/200111/9/2001AFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 11/9/2001 1:59:46 PM . Needs Fire/Life Safety, Zoning, ACHD . And non- compliance items on final special inspection report approved by the project engineer. See permit #bld01-02385 for Denver mattres Tennant improvement. 11/9/2001 2:05:19 PM
BLD-Final11/9/200111/9/200111/9/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 11/9/2001 4:01:08 PM ok temp oc , see am inspection history for addn info. 11/9/2001 4:20:33 PM
Temporary occupancy  11/9/2001 PART
Temp. Occ. Cert. #4636 issued 11-9-01 to Furniture Row.
Code Occupancy Approval  11/9/2001 DONE
SIGNED OCCUPANCY, STILL NEEDS SMALL AMOUNT OF LANDSCAPE BY COLE ROAD.
BLD-Final11/5/200111/6/200111/6/2001ANR
DetailsRuss Owen
###-#### ELDEN NEEDS TEMP OCCUPANCY
(F) Reprint permit  10/31/2001 DONE
BLD-Framing/Rough-in9/19/20019/20/20019/20/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/19/2001 at 11:44:04. Contact: ###-####. ok to cover baths in center and west bld 9/20/2001 9:43:55 AM
BLD-Framing/Rough-in8/28/20018/28/20018/28/2001PPART
DetailsRuss Owen
craig-- ###-####--fr insp ok to cover areas with-out plumbing. 8/28/2001 5:08:16 PM
Override - Parcel Holds  8/28/2001  
BLD-Conference8/20/20018/20/20018/20/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/20/2001 3:53:30 PM
BLD-Framing/Rough-in8/10/20018/10/20018/10/2001PPART
DetailsRuss Owen
FR INSP- DIRK - ###-#### . NOTE:needs a tennant improvement permit, schell only. 8/13/2001 12:21:49 PM
BLD-Foundation6/27/20016/27/20016/27/2001PPART
DetailsRuss Owen
###-#### subject to si. 6/27/2001 3:24:21 PM
BLD-Footing6/25/20016/26/20016/26/2001APART
DetailsRuss Owen
corey ###-#### special inspection reports on site. 6/26/2001 11:56:16 AM
BLD-Concrete6/14/20016/15/20016/15/2001APART
DetailsRuss Owen
###-#### subject to s-i. 1/15/2002 4:06:29 PM
BLD-Foundation6/13/20016/14/20016/14/2001APART
DetailsRuss Owen
stem wall eric ###-#### ok subject to special insp. 1/14/2002 12:27:25 PM
BLD-Foundation6/13/20016/13/20016/13/2001PPART
DetailsRuss Owen
corey ###-####
BLD-Foundation6/11/20016/11/20016/11/2001PPASS
DetailsDave Hannah
corey ###-#### MTI on site testing and inspecting 6/11/2001 1:50:12 PM
BLD-Footing6/7/20016/8/20016/8/2001APART
DetailsRuss Owen
pour at 10:30= cory ###-#### subject to s-i. 1/8/2002 4:01:02 PM
BLD-Footing6/6/20016/6/20016/6/2001PPART
DetailsRuss Owen
cory ###-#### s-i required insp. 1/6/2002 5:14:33 PM
BLD-Footing6/1/20016/1/20016/1/2001PPART
DetailsRuss Owen
pouring at 1:00 corey ###-#### subject to ,mti inspection. 1/4/2002 9:38:09 AM
BLD-Footing5/30/20015/30/20015/30/2001PPART
DetailsRuss Owen
pouring at 2 ###-#### final pour footings. 12/30/2001 4:31:21 PM
BLD-Framing/Rough-in5/30/20015/30/20015/30/2001PPART
DetailsRuss Owen
fr insp --dirk ###-#### interior non bearing walls and east to west tall walls ok to cover. 12/30/2001 4:31:00 PM
BLD-Foundation5/29/20015/29/20015/29/2001PPART
DetailsRuss Owen
###-#### inspection will be performed by mti. 12/30/2001 10:11:57 AM
BLD-Footing5/24/20015/24/20015/24/2001PPART
DetailsJim Storey
###-#### pour 3:30 pending rfi's and special insp report bach time on waiting truck in qustion. 5/24/2001 4:14:11 PM
BLD-Footing5/22/20015/22/20015/22/2001PPART
DetailsRuss Owen
Cory ###-#### north and east footing ok also inspections by special inspector required for design also cmu wall above went over requirements with contractor. MTI will be contracted. 12/22/2001 2:51:07 PM
Override - Parcel Holds  5/17/2001  
Issue PAID IN FULL permit  5/17/2001 DONE
Telephone call  5/10/2001 DONE
left mess that permit is ready
Plan assigned to (MLO)1/31/2001 5/9/2001 PASS
DetailsMike Otto
5/9/2001 08:56:56 MLO - activity updated through activity BLDA022 from case BLD01-00220.
PLANS/APPL TAKEN TO FRONT DESK  5/9/2001 DONE
Override - Parcel Holds  5/9/2001  
Inspection Record Card- Bld  5/9/2001 DONE
Print Occupancy Form  5/9/2001 DONE
Routing Off Site - STRUCTURAL5/2/2001 5/8/2001 PASS
Sent structural resubs via PDQ , 5/2/01
Plan resubmittals received  5/2/2001 DONE
Received three copies of revised sheets S1.1R4, S1.4R4, S2.2R4. Two copies of line item response and two copies of additional calculations. Routed to Mike O. KMM
Received Certificate of Value  5/1/2001 DONE
Received final cert. of value. Project value $1,434,848.00 Routed to Mike O. KMM
Routing - PUBLIC WORKS4/20/2001 4/30/2001 PASS
Routing - PLANNING4/17/2001 4/20/2001 PASS
Approve per DRH01-1, and per revised plans on file.
Plan resubmittals received  4/19/2001 DONE
Received one copy of revised sheets C1.1, C1.2, C4.1, C4.2. One copy of Ada County Highway requirment list. Routed to Richard Dailey. KMM
Richard brought plan back to me and I routed to Mike O. KMM
Routing Off Site - STRUCTURAL4/3/2001 4/12/2001 FAIL
Routed resubmitted calcs. and plans of 4/3/01 to outside eng. via PDQ. KMM Corrections faxed and mailed to architect
Routing - FIRE4/10/2001 4/12/2001 PASS
Plan resubmittals requested  4/12/2001 FAIL
additional structural corrections
Routing - PLUMBING4/4/2001 4/9/2001 PASS
Routing - PLAN CHECK4/3/2001 4/4/2001 PASS
Routing - PUBLIC WORKS3/30/2001 4/3/2001 PASS
Plan resubmittals received  4/3/2001 DONE
Received nine copies of revised sheets of plans (full sets), two copies of additional structural information in response to city review comments. Two copies of response to building department plan review comments and two copies of response to plumbing plan review dated 2/22/01. Put all with plans. Routed two copies to Mike Otto and one copy to outside eng. Put remaining six copies of plans in my hold box. KMM
Plan resubmittals received  3/28/2001 DONE
Received two copies of revised sheets C1.1R2, C1.2R2, C1.3R2, C2.1R2, C2.2R2, C3.1R2. Routed to Mike Otto. KMM
Plan Review Completed(1st rev)  3/12/2001 FAIL
Routing - FIRE3/6/2001 3/12/2001 FAIL
need response to grading permit items 1-4
Routing - PLAN CHECK3/6/2001 3/6/2001 FAIL
corrections sent to architect. MLO
Plan resubmittals requested  3/6/2001 FAIL
UBC and Structural corrections
Routing - PLAN CHECK2/22/2001 3/5/2001 PEND
plan review put on hold due to other priority projects.
Routing - PLUMBING2/13/2001 2/22/2001 FAIL
Routing - PLANNING2/12/2001 2/13/2001 FAIL
Plans do not comply with Design Review conditions of approval, DRH01-1, particularly the exterior elevations and some landscape areas.
Plan resubmittals received  2/12/2001 DONE
Received two sets of resubmittals from Eldon sheets D1.1 and D1.2, forwarded same to Mike Otto. 2/12/01 DAR
Routing - PUBLIC WORKS2/8/2001 2/12/2001 FAIL
Requires drainage plan revision per Brian Murphy. 2/12/01 DAR
Routing - PLAN CHECK2/7/2001 2/8/2001 FAIL
For demo permit. 2/7/01 DAR Need revised plans showing only non-bearing interior partitions to be removed. No other demo work is authorized at this time. Sent fax to Eldon Adams. Plans to resume circulation. MLO
Routing Off Site - STRUCTURAL1/31/2001 2/8/2001 FAIL
Sent plans and caculations to consultanting engineer via PDQ. 1/31/01 DAR corrections faxed to Eldon Adams.
Routing - PLANNING1/31/2001 2/7/2001 FAIL
Plans ACCEPTED BY PLAN TECH  1/31/2001 DONE
Advised Eldon Adams that a O & M manual was required for the drainage plan. He is working on it. Also waiting for an application for grading and drainage permit and a certificate of value for a Demo permit. 1/31/01 DAR
Plan assigned to (MYS)1/30/20011/30/20011/30/2001 DONE
DetailsMarlene Southard
Application received  1/30/2001  
Recd Pcfee & Taken To Pln CK  1/30/2001 DONE