BLD-Final | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | PASS |
Steven Webb
|
|
|
###-#### garage code 8677enter C. of C. #23289 issued. 7/23/2002 1:28:26 PM
|
DOC - Permit Finaled | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 7/23/2002 1:28:33 PM
|
BLD-Final | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### front door unlocked--C/N on site--several items including mech. final needed. 7/17/2002 8:50:12 AM
|
BLD-Final | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | NH |
Steven Webb
|
|
|
garage code 8677 ###-####
garage code didn't work--contact didn't answer--left voice message to re-call. 7/16/2002 3:58:31 PM
|
BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | FAIL |
Steven Webb
|
|
|
|
DOC - Permit Expired | 1/14/2002 | 1/14/2002 | 1/14/2002 | A | PASS |
Steven Webb
|
|
|
Expired by inspector at 1/14/2002 9:33:18 AM
|
BLD-Aging Inspection | 11/12/2001 | 11/12/2001 | 11/12/2001 | | FAIL |
Steven Webb
|
|
|
permit expired 11/13/2001 6:38:30 AM
|
BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | | PART |
Steven Webb
|
|
|
wip 9/10/2001 8:57:30 AM
|
BLD-Aging Inspection | 7/11/2001 | 7/11/2001 | 7/11/2001 | | PART |
Steven Webb
|
|
|
wip 7/11/2001 7:44:20 AM
|
BLD-Energy code compliance | 5/11/2001 | 5/11/2001 | 5/11/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/11/2001 at 06:48:18. Contact: .
|
BLD-Framing/Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 06:52:11. Contact: ###-####. Truss eng. submitted--Truss D2 ok 5/10/2001 10:44:55 AM
|
BLD-Energy code compliance | 5/10/2001 | 5/10/2001 | 5/10/2001 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 06:52:46. Contact: ###-####. Do not cover 5/10/2001 10:45:18 AM
|
BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 07:13:24. Contact: ###-####.,,,need eng. set of truss specs,,verify truss d-2,,,ok to insulate 5/9/2001 11:31:17 AM
|
BLD-Framing/Rough-in | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 08:39:27. Contact: ###-####. C/N posted on site. 5/7/2001 2:03:39 PM
|
BLD-Framing/Rough-in | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/04/2001 at 09:45:42. Contact: ###-####. No plans on site, fireplace needs permit and inspection. 5/4/2001 1:21:31 PM
|
Case Summary (BLD) | | | 5/1/2001 | | |
|
|
|
|
BLD-Other | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PASS |
Steven Webb
|
|
|
###-#### shear nail inspection Shear-ok to side. 4/24/2001 3:00:52 PM
|
Override - Parcel Holds | | | 4/24/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/24/2001 | | |
|
|
|
|
BLD-Foundation | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PART |
Steven Webb
|
|
|
###-#### wip-hd not installed at time of inspection. 3/26/2001 2:46:17 PM
|
Override - Parcel Holds | | | 3/26/2001 | | |
|
|
|
|
BLD-Footing | 3/22/2001 | 3/23/2001 | 3/23/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
Override - Parcel Holds | | | 3/22/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 3/21/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/21/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/21/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 2/20/2001 | | 3/20/2001 | | PASS |
Steve Munroe
|
|
|
3/20/2001 15:25:59 SAM - activity updated through activity BLDA022 from case BLD01-00226.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/5/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 3/5/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/5/2001 | | |
|
|
|
|
Plan Review Report | | | 3/5/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 3/5/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/5/2001 | | PEND |
|
|
|
Plan review is finished. I am waiting for release from Jim Wyllie on flood plain.
|
Telephone call | | | 2/26/2001 | | PEND |
|
|
|
2/26/01 8:20 I called and left a message letting GRS know that I need the set of plans the engineer marked before I can start a plan review.
|
Pending Assignment by DJO | 1/31/2001 | | 2/20/2001 | | DONE |
Dan Overy
|
|
|
2/20/2001 11:40:39 SAM - activity updated through activity BLDA183 from case BLD01-00226.
|
Routing - PUBLIC WORKS | 1/31/2001 | 1/31/2001 | 2/15/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 2/15/2001 | 2/15/2001 | 2/15/2001 | | PASS |
|
|
|
Revised plans
|
Routing - PLANNING | 1/31/2001 | 1/31/2001 | 2/1/2001 | | FAIL |
|
|
|
10 ft. easement/ site plan not to scale
Left message for Judy or Gary.
|
Routing - PUBLIC WORKS | 2/1/2001 | 2/1/2001 | 2/1/2001 | | DONE |
|
|
|
entered a pwk permit per jim wylie./pe
|
Application received | | | 1/31/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 2/15/2001 | 2/15/2001 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
2/20/01 13:16 I called and left a message that I need the correct set of plans--the ones the engineer marked--before the plans review can start.
|