BLD-Final | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PASS |
Tony Young
|
|
|
###-#### call
|
DOC - Permit Finaled | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 9/27/2001 3:42:23 PM
|
BLD-Final | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | PART |
Tony Young
|
|
|
###-#### call first to meet there
just need to finish final grade and hard surface parking per p/z 8/23/2001 11:15:00 AM
|
BLD-Final | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | NR |
Carl Dependahl
|
|
|
pending the mec, plm, ele insp--might call him 1st kole crofts ###-#### to 415 7/13/2001 3:50:09 PM
|
BLD-Conference | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | FAIL |
Tony Young
|
|
|
c/n posted on final 7/13/2001 4:01:11 PM
|
BLD-Aging Inspection | 6/25/2001 | 6/25/2001 | 6/25/2001 | | PASS |
Carl Dependahl
|
|
|
wip 6/25/2001 8:54:50 AM
|
BLD-Framing/Rough-in | 4/25/2001 | 4/25/2001 | 4/25/2001 | P | PASS |
Tony Young
|
|
|
cole ###-####
energy code ok also 4/25/2001 4:08:36 PM
|
BLD-Framing/Rough-in | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####...c/n, need clarify eng'g for straps,fireblocks. ok to insul. 4/24/2001 3:38:20 PM
|
BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/23/2001 4:56:43 PM w/415 re c/n...sthd14s ok at front panel
|
BLD-Framing/Rough-in | 4/12/2001 | 4/12/2001 | 4/12/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/12/2001 6:11:50 PM shear ok to side; need int panel at front per eng'g
|
BLD-Foundation | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | PART |
Carl Dependahl
|
|
|
LATE PM\\###-#### chk eng'g for hd's at front 3/2/2001 4:52:54 PM
|
BLD-Footing | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### ###-####
|
BLD-Foundation | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | NR |
Carl Dependahl
|
|
|
recall wall to insp s 3/1/2001 2:37:24 PM teel & hd's 3/1/2001 2:37:38 PM
|
Issue PAID IN FULL permit | | | 2/28/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/13/2001 | | DONE |
|
|
|
|
Telephone call | | | 2/13/2001 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 2/6/2001 | | 2/12/2001 | | PASS |
Steve Munroe
|
|
|
2/12/2001 15:21:46 SAM - activity updated through activity BLDA022 from case BLD01-00245.
|
Pending Assignment by DJO | 2/2/2001 | | 2/6/2001 | | DONE |
Dan Overy
|
|
|
2/6/2001 09:28:36 SAM - activity updated through activity BLDA183 from case BLD01-00245.
|
Routing - PUBLIC WORKS | 2/2/2001 | 2/2/2001 | 2/5/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 2/2/2001 | 2/2/2001 | 2/5/2001 | | DONE |
|
|
|
|
Application received | | | 2/2/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 2/5/2001 | 2/5/2001 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
2/6/01 13:50 I called and left a message on Kole's phone. I have questions on roof framing (is all framing trusses?) and the engineer also wants to look at the plans again to double check the numbers. The trib, rear wall and lower level front wall do not match the calculations.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|