Case Summary (BLD) | | | 12/22/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/19/2003 | | |
|
|
|
|
Fee Review-notes | 2/5/2001 | 2/5/2001 | 7/16/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/11/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8755 issued 7-11-01 to the Community House Soup Kitchen.
|
BLD-Final | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PART |
Jim Storey
|
|
|
Tim ###-#### need public work sign off. final ok upon that resolve/ 7/6/2001 1:56:50 PM
|
Permanent Occupancy | | 7/6/2001 | 7/6/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/6/2001 | 7/6/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/5/2001 3:20:40 PM awaiting completion of removal of existing strobe
|
BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | PART |
Dave Hannah
|
|
|
ceiling grid tim ###-#### need to ad seismic pods the rest is ok 6/12/2001 11:58:17 AM
|
BLD-Framing/Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PART |
Carl Dependahl
|
|
|
Tim ###-####, ok to cover walls & hard lid at restroom...recall for grid insp at west side areas when ready 5/17/2001 1:49:02 PM
|
BLD-Framing/Rough-in | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | FAIL |
Carl Dependahl
|
|
|
fr insp tim --###-#### patch 1hr lid, wrap beam, firestop penetrations; ok to begin walls, recall before install of gyp lids 5/16/2001 5:15:15 PM
|
FIRE-Sprinkler Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/14/2001 8:49:28 AM okay to cover - verify combustibles covered in bathrooms at final
|
BLD-Framing/Rough-in | 5/2/2001 | 5/4/2001 | 5/4/2001 | A | PART |
Carl Dependahl
|
|
|
TIM ###-####, beam at new opening in west wall ok...reinstall 1hr lid as needed (patch) 5/4/2001 11:32:48 AM
|
Issue PAID IN FULL permit | | | 4/23/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/30/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/30/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/30/2001 | | DONE |
|
|
|
called ryan drew at ###-#### left a message permit is R-E-A-D-Y
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2001 | | PASS |
|
|
|
Routing plans to permit desk to process for permit issuance. A new Certificate of Value is attached. Total cost is reduced because the covered walk-way & shelter have been removed from the scope of the project. New C.V. attached.
|
Plan assigned to (DRS) | 2/5/2001 | | 3/29/2001 | | PASS |
Dan Stuart
|
|
|
3/29/2001 17:47:48 DRS - activity updated through activity BLDA022 from case BLD01-00256.
|
Routing - PLAN CHECK | 3/20/2001 | | 3/29/2001 | | PASS |
|
|
|
Resubmittals inserted into original plans. Architectural plans altered and sheet A4 deleted from submittals to remove the Covered Walk-way & Covered- Waiting Shelter from the plans. This part of the application has been lined through with reference to the resubmittals.
|
Plan resubmittals received | | | 3/23/2001 | | DONE |
|
|
|
Received two sets of Plan resubmittals from Cole and Associates Architects, sheets A0.0, A1.0, A2.0, A3.0an small documents. Forwarded all to Dan Stuart. 3/23/01 DAR
|
Plan Review Completed(1st rev) | | | 3/20/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 3/17/2001 | | 3/20/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/26/2001 | | 3/17/2001 | | FAIL |
|
|
|
Resubmittals & clarifications required. Copy faxed and mailed to architect. Routing to fire code analyst for review.
|
Routing - PLUMBING | 2/14/2001 | | 2/26/2001 | | PASS |
|
|
|
TOOK TO PLUMBING DIVISION/PE
|
Routing - PLANNING | 2/13/2001 | | 2/14/2001 | | PASS |
|
|
|
Approved per CZC01-18.
|
Routing - PUBLIC WORKS | 2/7/2001 | | 2/13/2001 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/7/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/7/2001 | | DONE |
|
|
|
|
Application received | | | 2/5/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/5/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/5/2001 | | HOLD |
|
|
|
Plans require 1. At least a zoning cert. per Tempra Wilson
2. Two copies of site plan
Brian stated that he does not require grading and drainage as long as addition is under 500 sq. ft. and no drain basins. Tempra is not requiring a landscape plan. KMM
|
Received Certificate of Value | | | 2/5/2001 | | DONE |
|
|
|
|