Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00270
StatusFinaled
Name BRIGHTON CORPORATION
Site Address 4920 E SAGEWOOD DR
Project NameFLOOD PLAIN
Customer Number 
ePlanReviewNo
Description
To construct a 3102 sq. ft. two story single family dwelling with a 764 sq. ft. attached three car garage, a covered entry porch and a 180 sq. ft. concrete patio at rear of structure per approved plans, all red-lining and attached requirement lists. Note: This lot is within the floodplain area. A elevation certificate is required before calling for a rough framing inspection. Jim Wyllie has released the non-build if constructed in accordance with information supplied by Quadrant Engineering. (1st floor 2540 sq. ft.)(2nd floor 562 sq. ft.) PC #070 SOLAR PROTECTED CUP 98-116 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/22/200110/22/200110/22/2001 PASS
DetailsSteven Webb
c. of c. was issued on 6/20/01 10/22/2001 8:40:23 AM
DOC - Permit Finaled10/22/200110/22/200110/22/2001APASS
DetailsSteven Webb
Finaled by inspector at 10/22/2001 8:40:25 AM
BLD-Aging Inspection8/20/20018/20/20018/20/2001 PART
DetailsSteven Webb
wip 8/20/2001 7:56:57 AM
BLD-Final6/19/20016/20/20016/20/2001APASS
DetailsSteven Webb
TERRY ###-#### C. of C. #20435 issued. 6/20/2001 10:26:07 AM
BLD-Final6/19/20016/19/20016/19/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 06/19/2001 at 11:21:12. Contact: . Mechanical needed, stairs in back incompleted, rim joist insulation. 6/19/2001 1:13:53 PM
BLD-Aging Inspection6/13/20016/13/20016/13/2001 PASS
DetailsSteven Webb
wip 6/13/2001 7:41:44 AM
BLD-Wall cover4/12/20014/13/20014/13/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/12/2001 at 14:40:14. Contact: .
BLD-Wall cover4/12/20014/12/20014/12/2001PNR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/12/2001 at 10:26:52. Contact: .
BLD-Framing/Rough-in4/11/20014/11/20014/11/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/11/2001 at 10:49:27. Contact: .
BLD-Framing/Rough-in4/10/20014/10/20014/10/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/10/2001 at 08:57:05. Contact: . C/N posted on site 4/10/2001 2:29:29 PM
BLD-Other3/23/20013/26/20013/26/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/23/2001 at 13:29:50. Contact: .
BLD-Other3/22/20013/22/20013/22/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/22/2001 at 08:44:46. Contact: . HD istalled wrong-will re-call when ready. 3/22/2001 2:34:49 PM
BLD-Foundation2/28/20012/28/20012/28/2001PPART
DetailsSteven Webb
###-#### wip--rebar ok--hd not installed at time of inspection. 2/28/2001 2:18:00 PM
Override - Parcel Holds  2/28/2001  
Override - Parcel Holds  2/28/2001  
BLD-Footing2/27/20012/27/20012/27/2001PPART
DetailsSteven Webb
Chris ###-#### wip setback ok 2/27/2001 3:49:11 PM
Override - Parcel Holds  2/27/2001  
Override - Parcel Holds  2/27/2001  
Override - Parcel Holds  2/21/2001  
Override - Parcel Holds  2/21/2001  
Issue PAID IN FULL permit  2/21/2001 DONE
Override - Parcel Holds  2/14/2001  
Override - Parcel Holds  2/14/2001  
Inspection Record Card- Bld  2/14/2001 DONE
Override - Parcel Holds  2/14/2001  
Telephone call  2/14/2001 DONE
called ###-#### bill plans ready
Plan assigned to (DJO)2/8/20012/8/20012/13/2001 PASS
DetailsDan Overy
2/13/2001 15:28:59 DJO - activity updated through activity BLDA022 from case BLD01-00270.
Plan Reviewer's activity  2/13/2001 DONE
release non-build 02-12-2001 (instrument #100081364) per jim wyllie
Case Summary (BLD)  2/13/2001 DONE
Plan Review Report  2/13/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/13/2001 DONE
Plan Reviewer's activity  2/8/2001 PEND
will issue permit when Jim Wyllie releases non-biuld.
Plans ACCEPTED BY PLAN CHECK  2/8/2001  
Routing - PUBLIC WORKS2/6/20012/6/20012/7/2001 PASS
Routing - PLANNING2/6/20012/6/20012/6/2001 PASS
Application received  2/6/2001  
Routing - PLAN CHECK2/7/20012/7/2001  PEND
Pending Assignment by DJO2/6/2001   PEND
DetailsDan Overy
Case Summary (BLD)