Fee Review-notes | 2/7/2001 | 2/7/2001 | 1/18/2002 | | DONE |
|
|
|
over on shell & core under on TI these are ok
|
BLD-Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PART |
Tom Arcoraci
|
|
|
fn insp-- jerry ###-#### ok for perm occ when others sign perm occ 11/16/2001 8:48:25 AM
|
Letter of compliance | | | 11/16/2001 | | DONE |
|
|
|
Letter of Compliance #22071 issued 11-16-01.
|
FIRE-Final Inspection | 11/14/2001 | 11/15/2001 | 11/15/2001 | P | PASS |
Troy Cobbley
|
|
|
Fire/life safety, fire sprinkler and fire alarm OK. Ok for perm occ 11/15/2001 2:02:19 PM
|
FIRE-Final Inspection | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire/lifesafety finaled 11/14/2001 12:48:45 PM
|
FIRE-Final Inspection | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | NR |
Troy Cobbley
|
|
|
Had conference with superintendant on requirements for the life/safety inspection 11/6/2001 11:21:51 AM
|
Code Occupancy Approval | | | 10/17/2001 | | DONE |
|
|
|
ALL IN AS REQUIRED AND APPROVED CHANGES, FINAL OCCUPANCY SIGNED OFF.
|
BLD-Framing/Rough-in | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### grid ok 10/10/2001 10:50:49 AM
|
BLD-Framing/Rough-in | 8/21/2001 | 8/22/2001 | 8/22/2001 | A | PART |
Russ Owen
|
|
|
jerry ###-####. ok to sheetrock interior walls , pending plumbing approval. 8/22/2001 10:37:38 AM
|
BLD-Framing/Rough-in | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | PART |
Russ Owen
|
|
|
jerry -###-#### r/i for roof ,deck welds ok ,also special inspection will be performed. 6/26/2001 10:23:17 AM
|
BLD-Framing/Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 | P | PART |
Dave Hannah
|
|
|
wall MTI on site checking rebar inspector was using rebar shop drwgs not city approve struc. I found diff in tow inspector will go back over tilt up pannels with struc set 5/24/2001 3:08:08 PM
|
BLD-Footing | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Russ Owen
|
|
|
###-#### int columns. 12/8/2001 10:03:54 AM
|
BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PASS |
Russ Owen
|
|
|
###-#### ok ext footings,also insp will be performed by MTI. 12/7/2001 10:48:44 AM
|
(F) Reprint permit | | | 4/20/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/19/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/18/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/18/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2001 | | DONE |
|
|
|
called & left mess that permit is ready
|
Routing - PUBLIC WORKS | 4/17/2001 | | 4/17/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/17/2001 | | 4/17/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2001 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 2/8/2001 | | 4/17/2001 | | PASS |
John Menard
|
|
|
4/17/01 13:31:56 JCM - activity updated through activity BLDA022 from case BLD01-00290.
|
Routing - PUBLIC WORKS | 4/12/2001 | | 4/13/2001 | | FAIL |
|
|
|
Requires recorded deed of new adjusted Parcel per Jim Rich. 4/13/01 DAR
|
Routing - PUBLIC WORKS | 3/19/2001 | | 3/28/2001 | | FAIL |
|
|
|
Needs complete reduction in density recorded per Jim Rich. 3/28/01 DAR
|
Routing - PLAN CHECK | 3/16/2001 | | 3/19/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/19/2001 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets including resubmitted structural revisions. JCM
|
Routing - FIRE | 3/12/2001 | 3/15/2001 | 3/16/2001 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 3/16/2001 | | FAIL |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 3/15/2001 | | DONE |
|
|
|
Received plan resubmittals from Cornell Larson, two sets and small documents, forwarded same to John Menard. 3/15/01 DAR
|
Plan resubmittals requested | | | 3/12/2001 | | |
|
|
|
MAILED THE ARCHITECT OF RECORD A COPY OF THE COMMENT LIST REQURESTING REVISIONS. ALSO REVIEWED AND APPROVED RESUBMITTED STRUCTURAL PLAN SHEETS AND CALCULATIONS. JCM
|
Routing - PLAN CHECK | 2/27/2001 | | 3/12/2001 | | |
|
|
|
|
Routing - PLUMBING | 2/21/2001 | | 2/27/2001 | | PASS |
|
|
|
if an automatic soap dispensor is installed at the mop sink provide a water supply for it, if a dishwasher is installed the drain must be provided with an air gap fitting prior to connection to the drainage system.
|
Plan resubmittals received | | | 2/26/2001 | | DONE |
|
|
|
Received two sets of resubmittal plans from from Pinnacle Engineers Inc. and Larson Architects, forwarded same to John Menard. 2/26/01 DAR
|
Plan resubmittals requested | | | 2/22/2001 | | |
|
|
|
Faxed the architect a copy of the structural review comment list requesting structural revisions. JCM
|
Routing Off Site - STRUCTURAL | 2/8/2001 | | 2/22/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. KMM Received a comment list from the consulting engineer requestring revisions. Revisions to be reviewed by plans examiner. JCM
|
Routing - PLANNING | 2/13/2001 | | 2/21/2001 | | PASS |
|
|
|
Approved per DRH00-238.
|
Telephone call | | | 2/16/2001 | | DONE |
|
|
|
I called Cornel about the fact he needs to apply for a density reduction. KMM
|
Routing - PUBLIC WORKS | 2/9/2001 | | 2/13/2001 | | FAIL |
|
|
|
There are legal land questions per Brian Murphy. 2/13/01 DAR
|
Plan routing begun/NEW & ADDTN | | | 2/8/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/8/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 2/7/2001 | | DONE |
|
|
|
|
Application received | | | 2/7/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/7/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/28/2001 | | | | |
|
|
|
|
Routing - PLAN CHECK | 4/13/2001 | | | | |
|
|
|
|
Routing - PLAN CHECK | 4/17/2001 | | | | |
|
|
|
|