BLD-Final | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 13:28:21. Contact: ###-####. c. of c. #21608 issued. 10/12/2001 9:32:28 AM
|
DOC - Permit Finaled | 10/12/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 10/12/2001 9:32:31 AM
|
BLD-Aging Inspection | 10/8/2001 | 10/8/2001 | 10/8/2001 | | FAIL |
Steven Webb
|
|
|
permit expired 10/8/2001 10:34:00 AM
|
BLD-Aging Inspection | 8/6/2001 | 8/6/2001 | 8/6/2001 | | PART |
Steven Webb
|
|
|
wip 8/6/2001 8:29:48 AM
|
BLD-Aging Inspection | 6/5/2001 | 6/5/2001 | 6/5/2001 | | PASS |
Steven Webb
|
|
|
wip 6/5/2001 7:51:37 AM
|
BLD-Energy code compliance | 4/4/2001 | 4/5/2001 | 4/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 17:38:48. Contact: ###-####. framing ok 4/5/2001 9:15:01 AM
|
BLD-Energy code compliance | 3/30/2001 | 4/4/2001 | 4/4/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 12:44:08. Contact: ###-####. Prior c/n items not completed--c/n posted-DO NOT COVER TAG POSTED. 4/4/2001 12:15:53 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 09:53:18. Contact: ###-####. C/N--ok to insulate. 4/2/2001 3:57:20 PM
|
BLD-Framing/Rough-in | 3/30/2001 | 4/2/2001 | 4/2/2001 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 12:43:19. Contact: ###-####. C/N No approved plans on site. 4/2/2001 9:08:16 AM
|
BLD-Framing/Rough-in | 3/13/2001 | 3/16/2001 | 3/16/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 17:01:32. Contact: ###-####. Shear--ok to side. 3/16/2001 2:10:55 PM
|
BLD-Framing/Rough-in | 3/12/2001 | 3/13/2001 | 3/13/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 11:54:16. Contact: ###-####.c/n posted-address needed on site, additional staples needed on marked shear panels and above hd. 3/13/2001 9:56:56 AM
|
BLD-Foundation | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PART |
Steven Webb
|
|
|
###-#### hd not installed at time of inspection. 2/22/2001 11:08:00 AM
|
BLD-Footing | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PASS |
Steven Webb
|
|
|
FT INSP--MARK-- ###-####
|
Issue PAID IN FULL permit | | | 2/20/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 2/12/2001 | 2/12/2001 | 2/15/2001 | | PASS |
Dan Overy
|
|
|
2/15/2001 15:28:28 DJO - activity updated through activity BLDA022 from case BLD01-00298.
|
Plan Reviewer's activity | | | 2/15/2001 | | DONE |
|
|
|
received revised engineering for garage front wall.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 2/15/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 2/15/2001 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Plan Reviewer's activity | | | 2/12/2001 | | PEND |
|
|
|
1:45 p.m. 02-12-2001 have calls into both the engineer (briggs) and designer (gowenwood) about differences between red lines and floor plans at garage front.
|
Plans ACCEPTED BY PLAN CHECK | | | 2/12/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/8/2001 | 2/8/2001 | 2/9/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 2/8/2001 | 2/8/2001 | 2/9/2001 | | PASS |
|
|
|
|
Application received | | | 2/8/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 2/9/2001 | 2/9/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 2/8/2001 | | | | PEND |
Dan Overy
|
|
|
|