Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD01-00300
StatusFinaled
Name ST LUKES
Site Address 190 E BANNOCK ST
Project NameST LUKES-MAIN TOWER
Customer NumberSTL200434
ePlanReviewNo
Description
*(ST LUKES- NORTH WING - 3RD FLOOR)(C.V.O.R. ROOM)* To remove portions of interior non-bearing walls as per plan and construct a temporary construction access hall through the existing Staff Support Area, the Work Room, Supply Room and into the Operating Room, approximately 1,600 s.f. in area. To continue to use the Staff, Work & Supply Room Areas not part of the construction access per current uses. To remove interior suspended ceiling & grid, wall covering & framing as needed to allow installation of new lead lining on three interior walls or the O.R.; to install structural support system per engineering for new rails & suspended equipment; support for new equipment room folding partion divider; new grid system, electrical & mechanical in Operating Room; fire-resistive wall cover, new finish, cabinetry & equipment all per approved plans. Remove temporary construction hall and restore all areas to original condition. All penetrations of fire-resistive walls and floor systems shall be maintained or upgraded to meet current code for all disturbed, new or existing unprotected areas revealed as a part of this permit. NOTE: This building is fully sprinkled. A "Letter of Completion / Compliance" is required for this project when all is done. PC#01-111/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/8/20012/8/200111/9/2001 DONE
e-mailed for final certs
Letter of compliance  8/28/2001 DONE
Letter of Compliance #21933 issued 8-28-01.
BLD-Final7/25/20017/26/20017/26/2001PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/25/2001 at 09:04:02. Contact: ###-####.
BLD-Final7/26/20017/26/20017/26/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/26/2001 at 06:40:20. Contact: ###-####. final ok l/c to be isued card with contractor. 7/26/2001 10:12:39 AM
FIRE-Final Inspection7/24/20017/24/20017/24/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/24/2001 at 06:44:29. Contact: ###-####.
BLD-Final7/24/20017/24/20017/24/2001AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/24/2001 at 06:46:09. Contact: ###-####. NEED FINAL LETTER FROM SPEC INSP AND ENG ALSO CHECK FLOOR CEILING PENTS 7/24/2001 1:14:03 AM
Issue & PRINT to be Invoiced  4/24/2001 DONE
Inspection Record Card- Bld  4/23/2001 DONE
Print Occupancy Form  4/23/2001 DONE
Routing - PLAN CHECK4/3/2001 4/20/2001 PASS
Requested structural clarifications received - and new sheet S1.1. Approved per engineering analysis, notes on plans and attched comments.
Plan resubmittals received  4/20/2001 DONE
Received plan resubmittals from CSHQA, small documents plus two sheets S1.1, forwarded same to Dan Stuart. 4/20/01 DAR
PLANS/APPL TAKEN TO FRONT DESK  4/20/2001 PASS
To permit desk to issue.
Plan assigned to (DRS)2/12/2001 4/20/2001 PASS
DetailsDan Stuart
4/20/2001 17:40:08 DRS - activity updated through activity BLDA022 from case BLD01-00300.
Routing - FIRE3/27/2001 4/2/2001 PASS
Plan Review Completed(1st rev)  4/2/2001 PASS
Routing - PLAN CHECK2/12/2001 3/27/2001 FAIL
Approved as noted and attached. Special inspection required for HILTI metric self undercutting concrete anchors used to anchor new equipment structural support system.
Routing to fire code analyst for review.
Pending Assignment by MYS2/12/2001 2/12/2001 DONE
DetailsMarlene Southard
Application received  2/8/2001  
Plans ACCEPTED BY PLAN TECH  2/8/2001 DONE
Requested third set of plans to send to outside engineering. 2/8/02 DAR