BLD-Final | 6/22/2001 | 6/22/2001 | 6/22/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/22/2001 at 07:17:54. Contact: ###-####. lc issued 6/21/2001 9:22:59 PM
|
DOC - Permit Finaled | 6/21/2001 | 6/21/2001 | 6/21/2001 | A | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 6/21/2001 9:23:04 PM
|
BLD-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 | | PASS |
Tom Arcoraci
|
|
|
wip 6/12/2001 8:08:36 PM
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Clive ###-####
|
BLD-Energy code compliance | 4/12/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/12/2001 10:43:47 AM
|
BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-####- george fr cn issued 4/9/2001 3:01:04 PM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | NR |
Russ Owen
|
|
|
clive ###-####. needs plm and ele prior also permit for gas log as taged on the unit ,left c/n posted to recall do not cover. 4/3/2001 3:09:17 PM 4/3/2001 3:11:49 PM 4/3/2001 4:01:06 PM
|
BLD-Framing/Rough-in | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PART |
Tom Arcoraci
|
|
|
shear ###-#### ok to side 3/28/2001 3:18:12 PM
|
BLD-Framing/Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | FAIL |
Dave Hannah
|
|
|
shear insp Clyde ###-#### shear panels not nailed per eng 3/27/2001 2:21:05 PM
|
BLD-Foundation | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PART |
Tom Arcoraci
|
|
|
wall\\###-####
|
BLD-Footing | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
LATE AM ###-####
|
Plan assigned to (DJO) | 2/15/2001 | 2/15/2001 | 2/23/2001 | | PASS |
Dan Overy
|
|
|
2/23/2001 09:45:29 DJO - activity updated through activity BLDA022 from case BLD01-00304.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/23/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 2/23/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/23/2001 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2001 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Issue PAID IN FULL permit | | | 2/23/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/22/2001 | | DONE |
|
|
|
received revised plans on 02-22-2001. will red-line one set only due to the lack of correct information and detail, incorrect beam sizing, missing exterior footings, location of furnace compartment and header callout, re-inforcing callouts. Previous meeting with designer scheduled. no show. future submittals will not be accepted unless all red-lined information is incorporated into plan sets.
|
Routing - PUBLIC WORKS | 2/9/2001 | 2/9/2001 | 2/15/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 2/15/2001 | 2/15/2001 | 2/15/2001 | | PASS |
|
|
|
Revised plans
|
Plan Reviewer's activity | | | 2/15/2001 | | PEND |
|
|
|
these plans are being rejected and will be picked up by contractor for revisions. one additional site plan will be required with resubmittals.
|
Plans ACCEPTED BY PLAN CHECK | | | 2/15/2001 | | |
|
|
|
|
Routing - PLANNING | 2/9/2001 | 2/9/2001 | 2/13/2001 | | FAIL |
|
|
|
Driveway to single car bay can't be in front setback. Called George and the designer, will bring revisions.
|
Application received | | | 2/8/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 2/15/2001 | 2/15/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 2/9/2001 | | | | PEND |
Dan Overy
|
|
|
|