BLD-Final | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 6/19/2001 2:54:50 AM lc issued
|
DOC - Permit Finaled | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 6/19/2001 2:55:10 AM
|
FIRE-Final Inspection | 6/18/2001 | 6/18/2001 | 6/18/2001 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 06:17:23. Contact: ###-####. Cancel Should be structural insp 6/18/2001 8:33:59 AM
|
BLD-Final | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | FAIL |
Russ Owen
|
|
|
Final reinspect - Clive, ###-#### 2nd c/n posted for crawl space insulation and vappor coverage,as crawl not accessable at first inspection, also as written complete final grade. 1/18/2002 2:51:00 PM
|
BLD-Final | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | FAIL |
Tom Arcoraci
|
|
|
key is in ele outlet outside front door ###-#### c/notice posted 6/13/2001 10:11:00 PM
|
BLD-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 | | PASS |
Tom Arcoraci
|
|
|
wip 6/12/2001 8:08:43 PM
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Clive ###-####
|
BLD-Energy code compliance | 4/12/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/12/2001 10:40:22 AM
|
BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | FAIL |
Tom Arcoraci
|
|
|
george-- ###-#### cn issued 4/9/2001 5:34:30 PM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | NR |
Russ Owen
|
|
|
clive-- ###-#### fr need to resolve prior c/n for hold down installations c/n still posted, also obtain a permit and inspection for the fire place,new c/n posted do not cover recall. 4/3/2001 4:05:04 PM 4/3/2001 4:05:40 PM
|
BLD-Framing/Rough-in | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | FAIL |
Tom Arcoraci
|
|
|
shear nail-- ###-#### pat cn posted 3/19/2001 3:29:48 PM
|
BLD-Foundation | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PART |
Tom Arcoraci
|
|
|
wall insp Dave Cox ###-#### wip ok 3/6/2001 2:34:47 PM
|
BLD-Footing | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 2/20/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 2/14/2001 | 2/14/2001 | 2/15/2001 | | PASS |
Dan Overy
|
|
|
2/15/2001 13:55:50 DJO - activity updated through activity BLDA022 from case BLD01-00305.
|
Plan Reviewer's activity | | | 2/15/2001 | | DONE |
|
|
|
designer dropped off revised sheet A1 without reviewing the rest of the problems with the plans. holdowns not located, re-inforcing not specified, furnace protection indicated in wrong location, beam and header not specified or sized correctly. will red line one set only in order to issue permit. future submittals will have all red-lined items incorporated into plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 2/15/2001 | | DONE |
|
|
|
###-#### called dollar amount
|
Plans ACCEPTED BY PLAN CHECK | | | 2/14/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/14/2001 | | PEND |
|
|
|
initial review started. have had phone conversation with designer. he will be in tommorow afternoon to go over plans.
|
Print Pending Permit.LaserJet4 | | | 2/14/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 2/14/2001 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 2/9/2001 | 2/9/2001 | 2/12/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 2/9/2001 | 2/9/2001 | 2/12/2001 | | PASS |
|
|
|
|
Application received | | | 2/8/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 2/12/2001 | 2/12/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 2/9/2001 | | | | PEND |
Dan Overy
|
|
|
|