Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00308
StatusFinaled
Name HEALTH INSURANCE DIRECT
Site Address 10587 W SILVER CITY CT
Project NameHEALTH INSURANCE DIRECT
Customer Number 
ePlanReviewNo
Description
To convert an existing dwelling with a basement to a commercial office building and constructing a new addition which will include site work per approved plans and DRH00-00202. Total for building will now be 1,644 sq. ft. Work to include miscellaneous demolition work, new addition to existing structure, east exterior wall of addition to be one-hour fire rated per location on property, in lieu of parapet - new addition will have a one-hour rated roof-ceiling assembly with one-hour rated supporting walls, providing one-hour construction in basement usable space with 20 minute rated doors, new interior stairway and exterior stairway from basement, new interior stairway from main floor to higher split level, handrails/guardrails where required, floor infill framing at former stairway, reinforcing existing floor joists in one area to meet office minimum live loads, new accessible restrooms, new interior walls, new interior doors, interior finish, new exterior siding, some new exterior windows and doors, new exterior landings, new engineered exterior retaining wall, mechanical work, plumbing work, and electrical work. East exterior wall of existing residence structure can remain unprotected per Boise City Policy "How to Convert a Dwelling to an Office". A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN DONE. NOTE: Interior demolition performed under BLD01-00281. (P.C.#0114-01) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/9/20012/9/20013/22/2004 DONE
First Notice 3/19/20043/19/2004 DONE
First Notice 3/19/20043/19/2004 DONE
Permanent occupancy  3/19/2004 DONE
Perm. occ. Cert. # 10044 issued 3-19-04 to Health Insurance Direct.
Permanent Occupancy 3/18/20043/18/2004 DONE
Details
BLD-Aging Inspection8/21/20038/21/20038/21/2003 CANC
DetailsRuss Owen
DOC - Permit Expired8/21/20038/21/20038/21/2003APASS
DetailsRuss Owen
Expired by inspector at 8/21/2003 9:40:25 AM
BLD-Final5/23/20025/24/20025/24/2002AFAIL
DetailsRuss Owen
###-####. c/n posted. 5/24/2002 11:28:56 AM
BLD-Final5/24/20025/24/20025/24/2002PPASS
DetailsRuss Owen
###-#### DARWIN ok perm oc. 5/24/2002 4:00:05 PM
PubWorks Occupancy Approval5/14/20025/14/20025/14/2002 DONE
final insp 5/10/02, signed Perm Occ. S. Landaluce
BLD-Final5/13/20025/13/20025/13/2002AFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 5/13/2002 11:24:18 AM Posted c/n. 5/13/2002 3:05:33 PM
BLD-Final5/13/20025/13/20025/13/2002PFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 5/13/2002 2:46:06 PM. Went back to check addnl item and left c/n next to exting c/n. Told person working to let Darwin know when he returns. As I do not have his number. 5/13/2002 3:08:05 PM
FIRE-Final Inspection5/10/20025/10/20025/10/2002PPASS
DetailsTroy Cobbley
fire life/safety ok. structural inspector to verify the rest of the door hardware was changed out 5/10/2002 3:52:12 PM
BLD-Final5/10/20025/10/20025/10/2002PCANC
DetailsRuss Owen
fn occ- ###-####- darwin or janet Unable to do before 5 pm. 5/13/2002 11:26:30 AM
FIRE-Final Inspection5/1/20025/2/20025/2/2002AFAIL
DetailsTroy Cobbley
change door hardware to ADA approved type (lever - same for locks if equiped), remove thumbturns on exit doors, place sticker on main door if it becomes keyed, provide fire extinguisher with current inspection tag, provide exit sign in basement per approved plans 5/2/2002 4:29:35 PM
BLD-Final4/30/20025/1/20025/1/2002ACANC
DetailsRuss Owen
fn occ darwin- or janet- ###-#### or ###-#### . Called and talkede with darwin, Told him that he would need all required signatures on card, before calling for structural final. 5/1/2002 2:56:11 PM
Inspection Record Card- Bld  4/30/2002 DONE
Print Occupancy Form  4/30/2002 DONE
Inspection Record Card- Bld  4/30/2002 DONE
BLD-Framing/Rough-in1/29/20021/30/20021/30/2002APASS
DetailsRuss Owen
###-####. Ok to sheetrock all of building. 1/30/2002 12:25:55 PM
BLD-Final1/29/20021/29/20021/29/2002PFAIL
DetailsRuss Owen
###-#### This is not a final . It is frame insp of the interior shear wall that has been part covered , I stoped by and talked with the person doing the work, told them to call for a pm inspection . So that I could again explain how to construct shear walls./2002 9:16:45 AM 1/30/2002 9:19:03 AM
BLD-Conference1/29/20021/29/20021/29/2002APART
DetailsRuss Owen
Scheduled by Inspector: 407 On 1/29/2002 1:36:38 PM stoped by. as i had anticipated another inspection by now noted interior shear walls not done correct. Will need to recall. 1/29/2002 1:40:43 PM
BLD-Framing/Rough-in1/18/20021/18/20021/18/2002APART
DetailsRuss Owen
Scheduled by Inspector: 407 On 1/18/2002 10:38:54 AM Corrections made, Talked with engineer on phone front wall has window removed and hd added and now ok rear wall has smaller windows and no ok interior shear wall will still need to have hd bolts thru studs replaced with 3/4" and osb added to one side. not talked with Zack this day noted the above and also to recall after 1st layer of sheet rock has been added. NOTE. City ordinance will allow the garage to be as is as per location of property line see permit. 1/18/2002 10:47:34 AM
BLD-Final1/16/20021/17/20021/17/2002APART
DetailsRuss Owen
ZACK ###-#### talked with zack insulation will be completed and recall when done. 1/17/2002 1:00:14 PM
BLD-Framing/Rough-in1/15/20021/16/20021/16/2002ACANC
DetailsRuss Owen
fr insp-- zach ###-####
BLD-Final1/14/20021/16/20021/16/2002ACANC
DetailsRuss Owen
ZACH ###-####
BLD-Final1/14/20021/15/20021/15/2002APART
DetailsRuss Owen
###-#### Went over items again was trying to have suppervisor here this day , but could not. 1/15/2002 5:06:16 PM
BLD-Final1/10/20021/11/20021/11/2002APART
DetailsRuss Owen
###-####. contractor not at side called and went over mics items that still need to be addressed,will recall again soon. 1/11/2002 9:51:40 AM
BLD-Framing/Rough-in1/7/20021/8/20021/8/2002AFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 1/7/2002 5:36:36 PM posted c/n. 1/8/2002 1:05:30 PM
BLD-Final1/3/20021/4/20021/4/2002PPART
DetailsRuss Owen
went over items will be back 1/7/02 for another inspection and will leave c/n . 1/4/2002 4:49:09 PM
BLD-Final1/3/20021/3/20021/3/2002PCANC
DetailsRuss Owen
BLD-Conference12/10/200112/10/200112/10/2001APART
DetailsRuss Owen
Scheduled by Inspector: 407 On 12/10/2001 10:28:28 AM . went over requirements with framer and hvac company, note: It was fund today that the drywall has not been applied to the fire resistive exterior walls. and they now have been sided. 12/10/2001 10:41:05 AM
BLD-Framing/Rough-in11/29/200111/29/200111/29/2001PPART
DetailsRuss Owen
###-#### message zack please call one hour berfore going site
BLD-Conference11/29/200111/29/200111/29/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 11/29/2001 4:20:02 PM . went over requirements with cont/architect. c/n posted .pre-insp only. 11/29/2001 4:31:22 PM
BLD-Framing/Rough-in11/27/200111/28/200111/28/2001ANR
DetailsRuss Owen
###-#### darwin. needs mec and ele insp 11/28/2001 12:00:14 PM
BLD-Framing/Rough-in9/21/20019/21/20019/21/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/21/2001 at 11:13:55. Contact: ###-####. ok to rock required ext walls 9/21/2001 4:01:19 PM
BLD-Aging Inspection9/3/20019/3/20019/3/2001 PART
DetailsRuss Owen
wip. 9/5/2001 11:05:04 AM
BLD-Foundation7/3/20017/3/20017/3/2001PPASS
DetailsRuss Owen
###-####
BLD-Footing7/2/20017/2/20017/2/2001PPART
DetailsRuss Owen
###-####
Issue PAID IN FULL permit  6/8/2001 DONE
Print Occupancy Form  6/1/2001 DONE
Inspection Record Card- Bld  6/1/2001 DONE
Inspection Record Card- Bld  6/1/2001 DONE
Telephone call  6/1/2001 DONE
called permit ready
Routing - PLAN CHECK5/14/2001 5/31/2001 FAIL
Two items still needing clarification from structural engineer. Waiting for response.
Routing - PLAN CHECK5/31/2001 5/31/2001 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  5/31/2001 PASS
Plan assigned to (JCB)2/20/2001 5/31/2001 PASS
DetailsJason Blais
5/31/2001 15:16:14 JCB - activity updated through activity BLDA022 from case BLD01-00308.
Plan resubmittals received  5/29/2001 DONE
Received two copies of revised sheets C1.1, A1.2, A3.1, A6.1, A7.2, S1.1, S2.1, E1.1, two copies of struct. calcs. Routed to Jason B. KMM
Routing - FIRE5/11/2001 5/14/2001 PASS
Plan resubmittals requested  5/11/2001  
More plan resubmittals and a response required for further review. All items from initial plan review report were not adequately addressed.
Routing - PLAN CHECK5/1/2001 5/11/2001 FAIL
Second plan review report sent and faxed to architect. All items from initial plan review report were not adequately addressed. More resubmittals and response required for further review. Plans to route to Planning and Fire Dept. for review again.
Routing - PLANNING5/11/2001 5/11/2001 PASS
Approved per DRH00-202.
Plan resubmittals received  5/8/2001 DONE
Received two sets of plan resubmittals plus small documents from Design Resources, Rocky Towle, forwarded same to Jason Blaise. 5/8/01 DAR
Plan Review Completed(1st rev)  5/1/2001 FAIL
Routing - FIRE4/30/2001 5/1/2001 FAIL
WATER FLOW & HYDRANT LOCATION
Plan resubmittals requested  4/30/2001  
Plan resubmittals and response required for further review.
Routing - PLAN CHECK3/19/2001 4/30/2001 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals received  4/24/2001 DONE
Received two sets of plan resubmittals from Design Resources, Rocky Towel, forwarded same to Jason Blais
Routing - PLAN CHECK3/9/2001 3/19/2001 HOLD
Cursory review of project indicated that there were numerous problems. Met with architect and he acknowledged the problem issues and also stated that there were several owner changes. It was agreed that new plans were to be submitted. Project on hold until new plans submitted.
Meeting  3/19/2001  
Met with architect on project. Cursory review indicated numerous problems. Architect acknowledged and also stated that there would be owner changes. It was agreed that the project would be put on hold until new plans were submitted.
Routing - PLANNING3/6/2001 3/9/2001 FAIL
Site/landscape plan needs to be revised so that it complies with Community Forestry's comments.
Routing - PUBLIC WORKS2/20/2001 3/6/2001 PASS
Plans ACCEPTED BY PLAN TECH  2/9/2001 DONE
Received Certificate of Value  2/9/2001 DONE
Application received  2/9/2001  
Override - Parcel Holds  2/9/2001  
Recd Pcfee & Taken To Pln CK  2/9/2001 DONE