Fee Review-notes | 2/9/2001 | 2/9/2001 | 3/22/2004 | | DONE |
|
|
|
|
First Notice | | 3/19/2004 | 3/19/2004 | | DONE |
|
|
|
|
First Notice | | 3/19/2004 | 3/19/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/19/2004 | | DONE |
|
|
|
Perm. occ. Cert. # 10044 issued 3-19-04 to Health Insurance Direct.
|
Permanent Occupancy | | 3/18/2004 | 3/18/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 8/21/2003 | 8/21/2003 | 8/21/2003 | | CANC |
Russ Owen
|
|
|
|
DOC - Permit Expired | 8/21/2003 | 8/21/2003 | 8/21/2003 | A | PASS |
Russ Owen
|
|
|
Expired by inspector at 8/21/2003 9:40:25 AM
|
BLD-Final | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | FAIL |
Russ Owen
|
|
|
###-####. c/n posted. 5/24/2002 11:28:56 AM
|
BLD-Final | 5/24/2002 | 5/24/2002 | 5/24/2002 | P | PASS |
Russ Owen
|
|
|
###-#### DARWIN ok perm oc. 5/24/2002 4:00:05 PM
|
PubWorks Occupancy Approval | 5/14/2002 | 5/14/2002 | 5/14/2002 | | DONE |
|
|
|
final insp 5/10/02, signed Perm Occ. S. Landaluce
|
BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/13/2002 11:24:18 AM Posted c/n. 5/13/2002 3:05:33 PM
|
BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/13/2002 2:46:06 PM. Went back to check addnl item and left c/n next to exting c/n. Told person working to let Darwin know when he returns. As I do not have his number. 5/13/2002 3:08:05 PM
|
FIRE-Final Inspection | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety ok. structural inspector to verify the rest of the door hardware was changed out 5/10/2002 3:52:12 PM
|
BLD-Final | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | CANC |
Russ Owen
|
|
|
fn occ- ###-####- darwin or janet Unable to do before 5 pm. 5/13/2002 11:26:30 AM
|
FIRE-Final Inspection | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | FAIL |
Troy Cobbley
|
|
|
change door hardware to ADA approved type (lever - same for locks if equiped), remove thumbturns on exit doors, place sticker on main door if it becomes keyed, provide fire extinguisher with current inspection tag, provide exit sign in basement per approved plans 5/2/2002 4:29:35 PM
|
BLD-Final | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | CANC |
Russ Owen
|
|
|
fn occ darwin- or janet- ###-#### or ###-#### . Called and talkede with darwin, Told him that he would need all required signatures on card, before calling for structural final. 5/1/2002 2:56:11 PM
|
Inspection Record Card- Bld | | | 4/30/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/30/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/30/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Russ Owen
|
|
|
###-####. Ok to sheetrock all of building. 1/30/2002 12:25:55 PM
|
BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### This is not a final . It is frame insp of the interior shear wall that has been part covered , I stoped by and talked with the person doing the work, told them to call for a pm inspection . So that I could again explain how to construct shear walls./2002 9:16:45 AM 1/30/2002 9:19:03 AM
|
BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 1/29/2002 1:36:38 PM stoped by. as i had anticipated another inspection by now noted interior shear walls not done correct. Will need to recall. 1/29/2002 1:40:43 PM
|
BLD-Framing/Rough-in | 1/18/2002 | 1/18/2002 | 1/18/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 1/18/2002 10:38:54 AM Corrections made, Talked with engineer on phone front wall has window removed and hd added and now ok rear wall has smaller windows and no ok interior shear wall will still need to have hd bolts thru studs replaced with 3/4" and osb added to one side. not talked with Zack this day noted the above and also to recall after 1st layer of sheet rock has been added. NOTE. City ordinance will allow the garage to be as is as per location of property line see permit. 1/18/2002 10:47:34 AM
|
BLD-Final | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | PART |
Russ Owen
|
|
|
ZACK ###-#### talked with zack insulation will be completed and recall when done. 1/17/2002 1:00:14 PM
|
BLD-Framing/Rough-in | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | CANC |
Russ Owen
|
|
|
fr insp-- zach ###-####
|
BLD-Final | 1/14/2002 | 1/16/2002 | 1/16/2002 | A | CANC |
Russ Owen
|
|
|
ZACH ###-####
|
BLD-Final | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PART |
Russ Owen
|
|
|
###-#### Went over items again was trying to have suppervisor here this day , but could not. 1/15/2002 5:06:16 PM
|
BLD-Final | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | PART |
Russ Owen
|
|
|
###-####. contractor not at side called and went over mics items that still need to be addressed,will recall again soon. 1/11/2002 9:51:40 AM
|
BLD-Framing/Rough-in | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 1/7/2002 5:36:36 PM posted c/n. 1/8/2002 1:05:30 PM
|
BLD-Final | 1/3/2002 | 1/4/2002 | 1/4/2002 | P | PART |
Russ Owen
|
|
|
went over items will be back 1/7/02 for another inspection and will leave c/n . 1/4/2002 4:49:09 PM
|
BLD-Final | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | CANC |
Russ Owen
|
|
|
|
BLD-Conference | 12/10/2001 | 12/10/2001 | 12/10/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 12/10/2001 10:28:28 AM . went over requirements with framer and hvac company, note: It was fund today that the drywall has not been applied to the fire resistive exterior walls. and they now have been sided. 12/10/2001 10:41:05 AM
|
BLD-Framing/Rough-in | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PART |
Russ Owen
|
|
|
###-#### message zack please call one hour berfore going site
|
BLD-Conference | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 11/29/2001 4:20:02 PM . went over requirements with cont/architect. c/n posted .pre-insp only. 11/29/2001 4:31:22 PM
|
BLD-Framing/Rough-in | 11/27/2001 | 11/28/2001 | 11/28/2001 | A | NR |
Russ Owen
|
|
|
###-#### darwin. needs mec and ele insp 11/28/2001 12:00:14 PM
|
BLD-Framing/Rough-in | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/21/2001 at 11:13:55. Contact: ###-####. ok to rock required ext walls 9/21/2001 4:01:19 PM
|
BLD-Aging Inspection | 9/3/2001 | 9/3/2001 | 9/3/2001 | | PART |
Russ Owen
|
|
|
wip. 9/5/2001 11:05:04 AM
|
BLD-Foundation | 7/3/2001 | 7/3/2001 | 7/3/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | PART |
Russ Owen
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 6/8/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/1/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/1/2001 | | DONE |
|
|
|
called permit ready
|
Routing - PLAN CHECK | 5/14/2001 | | 5/31/2001 | | FAIL |
|
|
|
Two items still needing clarification from structural engineer. Waiting for response.
|
Routing - PLAN CHECK | 5/31/2001 | | 5/31/2001 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2001 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 2/20/2001 | | 5/31/2001 | | PASS |
Jason Blais
|
|
|
5/31/2001 15:16:14 JCB - activity updated through activity BLDA022 from case BLD01-00308.
|
Plan resubmittals received | | | 5/29/2001 | | DONE |
|
|
|
Received two copies of revised sheets C1.1, A1.2, A3.1, A6.1, A7.2, S1.1, S2.1, E1.1, two copies of struct. calcs. Routed to Jason B. KMM
|
Routing - FIRE | 5/11/2001 | | 5/14/2001 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 5/11/2001 | | |
|
|
|
More plan resubmittals and a response required for further review. All items from initial plan review report were not adequately addressed.
|
Routing - PLAN CHECK | 5/1/2001 | | 5/11/2001 | | FAIL |
|
|
|
Second plan review report sent and faxed to architect. All items from initial plan review report were not adequately addressed. More resubmittals and response required for further review. Plans to route to Planning and Fire Dept. for review again.
|
Routing - PLANNING | 5/11/2001 | | 5/11/2001 | | PASS |
|
|
|
Approved per DRH00-202.
|
Plan resubmittals received | | | 5/8/2001 | | DONE |
|
|
|
Received two sets of plan resubmittals plus small documents from Design Resources, Rocky Towle, forwarded same to Jason Blaise. 5/8/01 DAR
|
Plan Review Completed(1st rev) | | | 5/1/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 4/30/2001 | | 5/1/2001 | | FAIL |
|
|
|
WATER FLOW & HYDRANT LOCATION
|
Plan resubmittals requested | | | 4/30/2001 | | |
|
|
|
Plan resubmittals and response required for further review.
|
Routing - PLAN CHECK | 3/19/2001 | | 4/30/2001 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
|
Plan resubmittals received | | | 4/24/2001 | | DONE |
|
|
|
Received two sets of plan resubmittals from Design Resources, Rocky Towel, forwarded same to Jason Blais
|
Routing - PLAN CHECK | 3/9/2001 | | 3/19/2001 | | HOLD |
|
|
|
Cursory review of project indicated that there were numerous problems. Met with architect and he acknowledged the problem issues and also stated that there were several owner changes. It was agreed that new plans were to be submitted. Project on hold until new plans submitted.
|
Meeting | | | 3/19/2001 | | |
|
|
|
Met with architect on project. Cursory review indicated numerous problems. Architect acknowledged and also stated that there would be owner changes. It was agreed that the project would be put on hold until new plans were submitted.
|
Routing - PLANNING | 3/6/2001 | | 3/9/2001 | | FAIL |
|
|
|
Site/landscape plan needs to be revised so that it complies with Community Forestry's comments.
|
Routing - PUBLIC WORKS | 2/20/2001 | | 3/6/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/9/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 2/9/2001 | | DONE |
|
|
|
|
Application received | | | 2/9/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 2/9/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/9/2001 | | DONE |
|
|
|
|