Permit Information
Permit NumberBLD01-00361
StatusFinaled
Name AAA OREGON/IDAHO
Site Address 7155 W DENTON ST
Project NameAAA OREGON/IDAHO-SHELL
Customer Number 
ePlanReviewNo
Description
AAA OREGON/IDAHO OFFICE BUILDING (SHELL & CORE) TO CONSTRUCT A NEW 14,120 SQ. FT., ONE STORY, STEEL FRAMED OFFICE SHELL AND CORE BUILDING. THIS BUILDING WILL CONTAIN TWO FUTURE OFFICE TENANTS. THIS PERMIT COVERS THE CONSTRUCTION OF THE BUILDING SHELL AND THE COMPLETION OF THE CORE LOBBY AND RESTROOM AREAS AND RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS BUILDING IS FULLY FIRE SPRINKLED. THE AAA OREGON/IDAHO OFFICE AREA IS BEING COMPLETED FOR OCCUPANCY UNDER TENANT IMPROVEMENT PERMIT BLD01-00676). A SEPARATE TENANT IMPROVEMENT PERMIT WILL BE REQUIRED TO FINISH THE REMAINING UNIFINISHED TENANT SPACE. DRH00-00257/PC#126-01/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/15/20012/15/20014/15/2002 DONE
Letter of compliance  2/13/2002 DONE
Letter of Compliance #22072 issued 2-13-02.
BLD-Final2/11/20022/12/20022/12/2002PDONE
DetailsTom Arcoraci
###-####
BLD-Grading Inspection2/12/20022/12/20022/12/2002ACANC
DetailsRita DeYoung
Scheduled by Inspector: 408 On 2/12/2002 9:48:04 AM
BLD-Final2/12/20022/12/20022/12/2002APASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 2/12/2002 9:52:02 AM ok for perm occ 2/12/2002 9:56:24 AM
FIRE-Final Inspection1/15/20021/17/20021/17/2002ACANC
DetailsTroy Cobbley
canceled by contractor 1/17/2002 9:14:42 AM
BLD-Final1/15/20021/17/20021/17/2002PPART
DetailsTom Arcoraci
###-#### install bathroom partations and signage need final letter from spec inspection service and eng for welding instead of bolts at radius ok for temp occ 1/17/2002 2:17:20 PM 1/17/2002 2:18:11 PM 1/17/2002 2:18:46 PM
FIRE-Final Inspection1/17/20021/17/20021/17/2002PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 1/17/2002 2:03:45 PM Fire life/safety, fire alarm and fire sprinkler system finaled.
Code Occupancy Approval1/4/20021/4/20021/4/2002PPASS
DetailsWm. Michael Meloy
Scheduled by Inspector: WMM On 1/4/2002 12:23:41 PM
BLD-Framing/Rough-in11/29/200111/29/200111/29/2001PNR
DetailsTom Arcoraci
CELING GRID ON 1/2 OF BUILDING
BLD-Concrete10/15/200110/16/200110/16/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/15/2001 at 11:08:33. Contact: ###-####. ok to grout 10/16/2001 9:28:22 AM
BLD-Framing/Rough-in10/2/200110/3/200110/3/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/02/2001 at 09:44:13. Contact: ###-####. shear nailing ok grout pour ok wip 10/3/2001 10:26:17 AM
BLD-Other9/24/20019/24/20019/24/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/24/2001 at 08:03:59. Contact: ###-####. wip ok 9/24/2001 2:31:12 PM
BLD-Wall cover9/19/20019/19/20019/19/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/19/2001 at 07:22:39. Contact: ###-####. slip joint installed at roof deck and fire block installed 9/19/2001 2:43:20 PM
BLD-Wall cover9/17/20019/18/20019/18/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/17/2001 at 15:00:35. Contact: ###-####. shear ok partial 9/17/2001 10:51:11 PM
BLD-Wall cover9/12/20019/12/20019/12/2001PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/12/2001 at 07:55:11. Contact: ###-####. no one at site 9/12/2001 4:30:43 AM
BLD-Wall cover9/6/20019/7/20019/7/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/06/2001 at 14:18:21. Contact: ###-####.north wall partial inspection of ext only screws ok to proceed. 9/7/2001 12:19:54 PM
BLD-Wall cover8/30/20018/30/20018/30/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/30/2001 at 07:59:25. Contact: ###-####. wip 8/30/2001 2:58:09 AM
BLD-Conference8/28/20018/28/20018/28/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/28/2001 at 08:58:57. Contact: ###-####. NEEDS 8/28/2001 2:45:31 AM
BLD-Other8/20/20018/20/20018/20/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/20/2001 at 08:43:40. Contact: ###-####. grout 8/20/2001 1:44:11 AM
BLD-Other8/15/20018/15/20018/15/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/15/2001 at 06:54:35. Contact: ###-####. col ok for grout pour 8/14/2001 9:24:45 PM
BLD-Footing8/2/20018/3/20018/3/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/02/2001 at 14:51:53. Contact: ###-####.
BLD-Footing8/1/20018/2/20018/2/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/01/2001 at 14:01:19. Contact: ###-####.
BLD-Footing7/31/20018/1/20018/1/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/31/2001 at 12:46:32. Contact: ###-####.
BLD-Footing7/30/20017/30/20017/30/2001PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/30/2001 at 08:27:08. Contact: ###-####. int footing. 7/30/2001 3:54:38 PM
BLD-Footing7/25/20017/26/20017/26/2001PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/25/2001 at 15:11:12. Contact: ###-####.
BLD-Foundation7/25/20017/26/20017/26/2001PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/25/2001 at 15:13:49. Contact: ###-####.
BLD-Footing7/20/20017/23/20017/23/2001PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/20/2001 at 13:58:49. Contact: ###-####.
BLD-Foundation7/20/20017/23/20017/23/2001PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/20/2001 at 13:59:37. Contact: ###-####.
BLD-Footing7/19/20017/19/20017/19/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/19/2001 at 09:26:52. Contact: ###-####. west angle footing 7/19/2001 4:25:43 AM
BLD-Footing7/17/20017/18/20017/18/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/17/2001 at 11:58:50. Contact: ###-####. north side of building ftgs ok 7/18/2001 10:14:01 AM
BLD-Conference7/9/20017/10/20017/10/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/09/2001 at 11:16:10. Contact: ###-####. pre job conf 7/9/2001 9:18:10 PM
(F) Reprint permit  7/5/2001 DONE
Issue PAID IN FULL permit  7/3/2001 DONE
Telephone call  6/13/2001 DONE
left mess that permit is ready
Routing - PLAN CHECK5/1/2001 5/2/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/2/2001 PASS
Inspection Record Card- Bld  5/2/2001 DONE
Print Occupancy Form  5/2/2001 DONE
Telephone call  5/2/2001 DONE
left mess for steve that permit is ready
Plan assigned to (JCM)2/16/2001 5/2/2001 PASS
DetailsJohn Menard
5/2/01 08:44:11 JCM - activity updated through activity BLDA022 from case BLD01-00361.
Routing - FIRE5/1/20015/1/20015/1/2001 PASS
Copy of review also attahced to BLD00-00676.
Routing - PLAN CHECK3/26/2001 5/1/2001 PASS
Routing Off Site - STRUCTURAL4/3/2001 4/4/2001 PASS
sent resubs to consultanting engineer via PDQ. 4/3/01 DAR Received a fax from the consulting engineer approving the resubmittals. JCM
Plan Reviewer's activity  4/3/2001 PASS
Reviewed and approved resubmitted plan sheets. JCM
Plan resubmittals received  4/2/2001 DONE
Received plan resubmittals from Lombard Conrad Architects two sets, frowarded same to John Menard. 4/2/01 DAR
Routing - PUBLIC WORKS3/23/2001 3/23/2001 PASS
Routing - FIRE3/19/2001 3/21/2001 FAIL
need waterflow data
Plan Review Completed(1st rev)  3/21/2001 FAIL
Plan resubmittals requested  3/19/2001 FAIL
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK2/27/2001 3/19/2001  
Routing - PLUMBING2/23/2001 2/27/2001 PASS
Routing - PLANNING2/22/2001 2/23/2001 PASS
Approve per DRH00-257
Routing - PUBLIC WORKS2/16/2001 2/22/2001 FAIL
Requires drainage plan per Brian Murphy.
Routing Off Site - STRUCTURAL2/16/2001 2/22/2001 FAIL
Contacted pdq to take plans to outside eng. KMM Received a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  2/22/2001  
Faxed a copy of the consulting stuctural engineer's comment list to the architect of record requesting structural revisions. JCM
Plans ACCEPTED BY PLAN TECH  2/16/2001 DONE
Received Certificate of Value  2/16/2001 DONE
Plan routing begun/NEW & ADDTN  2/16/2001 DONE
Application received  2/15/2001  
Recd Pcfee & Taken To Pln CK  2/15/2001 DONE
Routing - PLAN CHECK3/21/2001