Fee Review-notes | 2/16/2001 | 2/16/2001 | 11/9/2001 | | DONE |
|
|
|
|
BLD-Final | 7/25/2001 | 7/26/2001 | 7/26/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 7/25/2001 1:28:31 PM .permanent oc. 7/26/2001 10:37:59 AM
|
Letter of compliance | | | 7/26/2001 | | DONE |
|
|
|
Letter of Compliance #21613 issued 7-26-01.
|
BLD-Final | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | FAIL |
Russ Owen
|
|
|
needs zoning and health dept approval. 7/24/2001 3:06:43 PM
|
FIRE-Final Inspection | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | PASS |
Joe Tawney
|
|
|
Final OK for certificate of completion 7/24/2001 2:29:25 PM
|
BLD-Final | 6/12/2001 | 6/13/2001 | 6/13/2001 | P | PART |
Russ Owen
|
|
|
partial food crt. ###-#### needs health dpt ok . 1/13/2002 4:27:07 PM
|
FIRE-Final Inspection | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | PART |
Joe Tawney
|
|
|
###-#### OK to occupy Food Court area 6/13/2001 3:55:23 PM
|
BLD-Framing/Rough-in | 6/5/2001 | 6/6/2001 | 6/6/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 13:16:02. Contact: . small wall at front area communication room. 1/6/2002 12:39:32 PM
|
BLD-Framing/Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 13:03:53. Contact: . OK TO COVER BATH DRESSING ROOMS AND KIT WALLS 6/1/2001 9:26:10 AM
|
BLD-Framing/Rough-in | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 08:48:24. Contact: .ok to cover front of kitchen. 12/17/2001 9:46:11 AM
|
BLD-Framing/Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 07:48:50. Contact: . rear walls at non rated area at rear store room. 12/2/2001 4:29:36 PM
|
Issue PAID IN FULL permit | | | 3/30/2001 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 2/20/2001 | | 3/20/2001 | | PASS |
Dan Stuart
|
|
|
3/20/2001 13:45:48 DRS - activity updated through activity BLDA022 from case BLD01-00366.
|
Routing - PLAN CHECK | 3/19/2001 | | 3/20/2001 | | PASS |
|
|
|
Approved as noted on plans and attached plan review conditions / comments.
|
Telephone call | | | 3/20/2001 | | DONE |
|
|
|
Called Eric Lang - Ed Silver & Associates - structural engineer for the Target T-617 interior remodel refurbish. Reviewed the last sheet of structural engineering stating the new expansion of the door opening in the West wall at the North end would not be structurally efficient without a connection between the corner & perpendicular panel. There was not further analysis of what the required design fix was and that the method called for on the plans was the designed fix. Also the details for the new angle, 6 x 6 x 1/2 with epoxy connections was of such small demension that the required length was not noted, edge distance to connection was not noted - this is the only question remaining to be answered to allow the issuance of the permit. Eric said he would fax me the clarifications & engineering today.
|
Telephone call | | | 3/20/2001 | | DONE |
|
|
|
Call to Ron Dowling, Adolphson-Peterson Construction, to let him know plans had been reviewed and approved as noted by the fire code analyst. All I need is the response fromm Eric Lang, Ed Silverman & Assoc. Strucutral Engineers and I would be able to take the plans to the permit desk for permit processing for issue. Eric Lang stated I would have the engineering data by today and I will review as soon s received. If ok the plans will be taken to the front permit dsk and he will be called with final fee costs and notice that the permit is ready to pick up maybe today or on Wednesday.
|
Additional plans submitted | | | 3/20/2001 | | |
|
|
|
Recieived sheet 5 of structural engineering for the use of the 6" x 6" x 1/2" angle for the full hieght of the wall connecting the perpendicular wall to the wall of opening enlargement as an structural connection to resist the lateral loads per the engineering.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2001 | | PASS |
|
|
|
To permit desk to process for permit.
|
Print Occupancy Form | | | 3/20/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2001 | | DONE |
|
|
|
called permit ready
|
Telephone call | | | 3/20/2001 | | DONE |
|
|
|
called permit ready
|
Plan Review Completed(1st rev) | | | 3/19/2001 | | PASS |
|
|
|
|
Routing - FIRE | 3/16/2001 | | 3/19/2001 | | PASS |
|
|
|
|
Telephone call | | | 3/16/2001 | | DONE |
|
|
|
Call to Ed Silver & Assoc., Structural engineers for more details on the 6x6x1/2 angle to connect two walls together at the enlarged opening of the west wall door. Need engineering connecting the detail to the engineered design and a larger detail of length of angle and the edge distance clearances required.
|
Telephone call | | | 3/16/2001 | | DONE |
|
|
|
Call to Mark Erinberg, RSP Architects to see if the high piled storage and the smoke & heat vents of the 1989 plans are in place or did not occur.
|
Telephone call | | | 3/16/2001 | | DONE |
|
|
|
Adolphson - Petterson const. to let them know the plans were routed to Fire Dept. for review today and that I will be out of office on Monday.
|
Routing - PLAN CHECK | 3/1/2001 | | 3/16/2001 | | PEND |
|
|
|
Approved per notes & attached plan review comments. Routing to fire code analyst for review.
|
Routing - PLANNING | 2/27/2001 | | 3/1/2001 | | PASS |
|
|
|
Approved per building permit plans.
|
Routing - PLUMBING | 2/21/2001 | | 2/27/2001 | | PASS |
|
|
|
pvb required on hose reel in green plant area, relocate carbonator r.p. so that the drain from the drip cup isn't required to be piped across an open floor area to a drain, provide a vent for the floor drain in the restroom at col. 6-J.5, floor drains FS-47and FD-2 must not be located within a cabinet or under equipment, must be in full view.
|
Routing - PUBLIC WORKS | 2/20/2001 | | 2/21/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/16/2001 | | DONE |
|
|
|
CDH signed off on sheet FS-1. KMM
|
Received Certificate of Value | | | 2/16/2001 | | DONE |
|
|
|
|
Application received | | | 2/16/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/16/2001 | | DONE |
|
|
|
|