Case Summary (BLD) | | | 9/3/2003 | | |
|
|
|
|
Fee Review-notes | 2/16/2001 | 2/16/2001 | 1/29/2002 | | DONE |
|
|
|
|
BLD-Final | 1/8/2002 | 1/8/2002 | 1/8/2002 | | DONE |
|
|
|
Final, ok for perm. occ.
|
Letter of compliance | | | 1/8/2002 | | DONE |
|
|
|
Letter of Compliance #22105 issued 1-8-02.
|
BLD-Aging Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/1/2001 | 10/1/2001 | 10/1/2001 | | PART |
Tom Arcoraci
|
|
|
letter from spec insp expected in mail 10/3/2001 8:34:50 AM
|
BLD-Final | 7/31/2001 | 8/1/2001 | 8/1/2001 | P | PART |
Russ Owen
|
|
|
fn occ don-- ###-####. ok temp occupancy plan review notes indicate special inspection was required left note to provide final report. 8/1/2001 2:54:45 PM
|
FIRE-Final Inspection | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Final OK for permanant occupancy 7/26/2001 11:34:32 AM
|
BLD-Final | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/24/2001 at 15:08:29. Contact: ###-####.
|
Print Occupancy Form | | | 7/25/2001 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 7/25/2001 | | PASS |
|
|
|
Inspected today, passed.
|
BLD-Concrete | 6/13/2001 | 6/13/2001 | 6/13/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 06:50:20. Contact: ###-####. flat work 6/13/2001 3:46:09 AM
|
BLD-Foundation | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PASS |
Tom Arcoraci
|
|
|
any time after 11:00\\###-####
|
BLD-Footing | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PASS |
Tom Arcoraci
|
|
|
Donald ###-#### mud at 1:30
|
BLD-Other | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 07:25:47. Contact: ###-####. wip 5/16/2001 3:19:48 PM
|
BLD-Other | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PASS |
Tom Arcoraci
|
|
|
lid on a search tank ###-####
|
BLD-Concrete | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 10:46:17. Contact: ###-####. ok to pour lid of vault of mech room 5/8/2001 10:47:21 AM
|
BLD-Footing | 4/30/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Tom Arcoraci
|
|
|
BOYD ###-#### walls for vault 5/1/2001 2:40:09 PM
|
BLD-Footing | 4/26/2001 | 4/27/2001 | 4/27/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | PASS |
Dave Hannah
|
|
|
rebar Boyd ###-####
|
BLD-Footing | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | PART |
Tom Arcoraci
|
|
|
Boyd ###-#### pump ft and wall ok 4/24/2001 8:37:52 AM
|
Issue & PRINT to be Invoiced | | | 4/20/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/12/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/12/2001 | | DONE |
|
|
|
LEFT MESS FOR ELIZABETH COOPER THAT PERMIT IS READY TO PICK-UP
|
Print Occupancy Form | | | 3/12/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/12/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/12/2001 | | DONE |
|
|
|
|
Routing - FIRE | 3/9/2001 | 3/9/2001 | 3/9/2001 | | PASS |
Bill Alexander
|
|
|
|
Plan Reviewer's activity | | | 3/9/2001 | | DONE |
|
|
|
additional information reviewed regarding hazardous materials and current conditions at the site with architect. No changes are being made with chlorine system and sodium hydroxide is 55%. Sent project back to fire. MLO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 2/20/2001 | | 3/9/2001 | | PASS |
Mike Otto
|
|
|
3/9/2001 13:37:48 MLO - activity updated through activity BLDA022 from case BLD01-00373.
|
Routing - FIRE | 3/5/2001 | 3/6/2001 | 3/6/2001 | | FAIL |
Bill Alexander
|
|
|
Over the limits for usage without verification of requirements needed per UFC Article 80.
|
Plan resubmittals received | | | 3/5/2001 | | DONE |
|
|
|
received hazmat info
|
Routing - FIRE | 2/27/2001 | 3/2/2001 | 3/2/2001 | | FAIL |
Bill Alexander
|
|
|
LACK UFC ARTICLE 1 AND 80 VERIFICATION. FAXED COPY OF REVIEW 8:20 AM TO THE ARCHITECT.
|
Plan Review Completed(1st rev) | | | 3/2/2001 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 3/2/2001 | | 3/2/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/2/2001 | | DONE |
|
|
|
Received plan resubmittals from TSE Architecture Small Documents and Two sets of sheets S1.0 and S2.0, forwarded same to Mike Otto. 3/2/01 DAR
|
Plan resubmittals requested | | | 2/27/2001 | | FAIL |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 2/26/2001 | | 2/27/2001 | | FAIL |
|
|
|
corrections mailed and faxed to architect. MLO
|
Routing - PLUMBING | 2/21/2001 | | 2/23/2001 | | FAIL |
|
|
|
rp required on domestic water makeup to pool equipment, dirrect connection between stk-1 and sewer prohibited, provide information on drainage of waste pit in mech room
|
Routing - PLANNING | 2/21/2001 | 2/21/2001 | 2/21/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 2/20/2001 | | 2/21/2001 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/20/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/20/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 2/16/2001 | | DONE |
|
|
|
|
Application received | | | 2/16/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/16/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/9/2001 | | | | |
|
|
|
|