Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00379
StatusFinaled
Name SHORELINE DESIGN INC
Site Address 3405 W CRESCENT RIM DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 5777 sq. ft. two story single family dwelling with a 3776 sq. ft. basement and 1713 sq. ft. of 1st and 2nd level terrace areas per approved plans, all engineering and attached requirement lists. Underground area will include a 2029 sq. ft. three car garage and 1747 sq. ft. of mechanical, storage, wine cellar, hallway and stair core area. (1st floor 3689 sq. ft.)(2nd floor 2088 sq. ft.) In addition to required reqular inspections by the Inspection Division, this structure will require special inspection in accordance with sheet S-0.0 of approved plans, chapter 17 (1997 UBC) and attached condition lists. A soils investigation report, and a report of satisfactory placement of fill from the geotechnical engineer, must be submitted to the inspector prior to pouring any concrete. The building inspector shall be notified of all required inspections prior to any cover of framing or re-inforcement. The cover of such will not be without the consent of the assigned inspector of this project. PC #112 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/16/2005  
Case Summary (BLD)  2/16/2005  
BLD-Final3/11/20033/12/20033/12/2003APASS
DetailsTom Arcoraci
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore
DOC - Permit Finaled3/12/20033/12/20033/12/2003APASS
DetailsTom Arcoraci
Finaled by inspector at 3/12/2003 10:34:11 AM
BLD-Conference1/17/20031/21/20031/21/2003APASS
DetailsTom Arcoraci
work still in progress--ok per tom
BLD-Conference12/17/200212/18/200212/18/2002APASS
DetailsTom Arcoraci
###-#### after 9am gaurd rail not reqired at drive way
12/18/2002 10:10:07 AM
BLD-Conference9/30/20029/30/20029/30/2002PPASS
DetailsCarl Dependahl
needs to extend permit got post card mailed...large project, WIP. 9/30/2002 1:59:37 PM
PostCard Mailed  9/29/2002 SENT
PostCard has been mailed requesting inspection.
BLD-Energy code compliance3/15/20023/15/20023/15/2002PPART
DetailsCarl Dependahl
###-#### Chris call to meet there ... ok per 408 3/15/2002 3:53:34 PM
BLD-Energy code compliance3/13/20023/13/20023/13/2002PNR
DetailsDave Hannah
###-#### CHRIS
BLD-Framing/Rough-in3/4/20023/5/20023/5/2002PPASS
DetailsTom Arcoraci
fr chris ###-####
BLD-Conference3/5/20023/5/20023/5/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/5/2002 1:50:25 PM w/ bldr, sent insp to 408 3/5/2002 2:50:45 PM
BLD-Conference2/19/20022/20/20022/20/2002APASS
DetailsCarl Dependahl
for conf chris ###-#### install smoke dets per 310.9 2/21/2002 9:23:04 AM
BLD-Framing/Rough-in2/5/20022/7/20022/7/2002APART
DetailsJim Storey
CHRIS - ###-#### framing ok all but perfarated sher panells,steel beam stifners west of entry at basment level missalined, bearing at floor trusses south east basement miss bearing point on paralam. 2/7/2002 11:24:03 AM
BLD-Aging Inspection1/8/20021/8/20021/8/2002 NR
DetailsCarl Dependahl
wip, big sfd 1/8/2002 6:04:57 PM
BLD-Framing/Rough-in11/8/200111/8/200111/8/2001PPART
DetailsTom Arcoraci
###-#### CHRIS EXTERIOR SHEER WALL ok ext shear 11/8/2001 2:09:09 PM
BLD-Framing/Rough-in11/7/200111/7/200111/7/2001PNR
DetailsCarl Dependahl
###-#### chris exterior sheer wall , nr recall. 11/7/2001 5:03:06 PM
BLD-Conference10/15/200110/15/200110/15/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/15/2001 10:43:04 AM w/ bldr re req's for fire doors.
BLD-Concrete9/10/20019/10/20019/10/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/10/2001 4:09:08 PM ok to place non shrink grout at bsmt col bases...will photo.
BLD-Foundation8/15/20018/15/20018/15/2001PPART
DetailsCarl Dependahl
###-#### chris ( special inspection ) wip, pend report 8/15/2001 4:33:55 PM
BLD-Foundation8/8/20018/9/20018/9/2001PPART
DetailsCarl Dependahl
FOUND CHRIS ###-####--UNDER SPECIAL INSP - STRATA WILL BE THERE, pend report, ok 8/9/2001 5:16:42 PM
BLD-Framing/Rough-in8/7/20018/7/20018/7/2001PPART
DetailsCarl Dependahl
partial re-enforcement-- chris ###-#### --if possbile 2?????????????????pend spec insp 8/7/2001 5:03:47 PM
BLD-Foundation7/31/20018/1/20018/1/2001APART
DetailsSteven Webb
special inspection ###-#### Strata to provide report upon completion of project. To inspect every pour. 8/1/2001 9:44:39 AM
BLD-Foundation7/26/20017/26/20017/26/2001PPART
DetailsDave Hannah
foundation reinforcement Chris ###-#### around 4:00 please under special inspection cmu fire place and elevator saft strata will check rebar 7/26/2001 4:12:03 PM
BLD-Foundation7/24/20017/25/20017/25/2001APASS
DetailsDave Hannah
###-#### partial early as possible 7/25/2001 11:18:30 AM strata on site to insp and test 7/25/2001 11:19:27 AM
BLD-Foundation7/20/20017/20/20017/20/2001PPART
DetailsRuss Owen
RE-INFORCEMENT FOR THE FOUND- CHRIS ###-####. cmu ok also will be inspected by strata. 7/20/2001 3:24:10 PM
BLD-Foundation6/21/20016/22/20016/22/2001PPART
DetailsCarl Dependahl
Chris ###-####, spec. insp onsite; walls 6/22/2001 4:25:51 PM
BLD-Foundation6/6/20016/7/20016/7/2001APART
DetailsJim Storey
found --before 12 ???????- chris ###-####covered w special pending report. 6/7/2001 11:18:20 AM
BLD-Foundation6/6/20016/6/20016/6/2001PPART
DetailsCarl Dependahl
Chris ###-####...elev sump; recall for front wall & column when steel in place 6/6/2001 3:38:46 PM
BLD-Foundation5/29/20015/30/20015/30/2001APART
DetailsJim Storey
partial foundation reinforcement Chris ###-####-set up for special inspection for 5/29/01 mud is poured at 12:00 east wall ok for placement lou with mti will be on site. 5/30/2001 9:49:20 AM
BLD-Footing5/1/20015/3/20015/3/2001APART
DetailsTom Arcoraci
###-#### spec insp on site per 340 5/3/2001 1:31:53 PM
BLD-Conference5/2/20015/2/20015/2/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/2/2001 5:14:05 PM w/ Concrete contractor...need spec insp, too.
BLD-Conference4/23/20014/23/20014/23/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/23/2001 11:21:23 AM w/ Chris Walton re soils & spec insps: need approvals for actual site excavations & reinf'd concrete, not just cylinders. Will verify w/ DJO
BLD-Conference4/18/20014/20/20014/20/2001APART
DetailsJim Sly
chris ###-#### Met with Chris and STRATA soil Eng. to reveiw soils test report and Inspection procedures. 4/20/2001 12:22:31 PM
BLD-Footing3/16/20013/16/20013/16/2001PPART
DetailsCarl Dependahl
###-####; privacy fence only...need eng's/spec insp for struct fnd's 3/16/2001 2:55:22 PM
Issue PAID IN FULL permit  3/12/2001  
Plan assigned to (DJO)2/26/20012/26/20013/9/2001 PASS
DetailsDan Overy
3/9/2001 14:52:58 DJO - activity updated through activity BLDA022 from case BLD01-00379.
Case Summary (BLD)  3/9/2001 PEND
Plan Review Report  3/9/2001 PEND
PLANS/APPL TAKEN TO FRONT DESK  3/9/2001 DONE
Inspection Record Card- Bld  3/9/2001 DONE
Telephone call  3/9/2001 DONE
talked to Chris gave dollar amount
Plan Reviewer's activity  3/5/2001 PEND
have left message with Bob Archibald to set up conference with who ever the structural inspector may be in order to word permit to cover complexity of work.
Plan Reviewer's activity  3/2/2001 PEND
Received new soils engineering from Strata indicating 4000 psf soil bearing design. Have also had phone conversation with Chris Walton about length of SSTB anchor bolts used at basement slab area. Where indicated, areas are over excavated to accomodate for anchor embedment. Will continue review monday.
Plan Reviewer's activity  2/28/2001 PEND
initial review started late monday afternoon (02-26-2001) Soils engineering calls out 2000 psf soil bearing capacity. Foundation design based on 4000 psf. Called Bob Howard at Strata wednesday morning (10:15 A.M.) He will contact Pinnacle and get back to me on issue. After problem is resolved, other items need to be discussed.
Plans ACCEPTED BY PLAN CHECK  2/26/2001 PEND
Routing - PUBLIC WORKS2/20/20012/20/20012/21/2001 PASS
Routing - PLANNING2/20/20012/20/20012/21/2001 PASS
Application received  2/20/2001  
came in 2/16/2001 address 2/20/2001/pe
Routing - PLAN CHECK2/21/20012/21/2001  PEND
Pending Assignment by DJO2/20/2001   PEND
DetailsDan Overy