Case Summary (BLD) | | | 2/16/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 2/16/2005 | | |
|
|
|
|
BLD-Final | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | PASS |
Tom Arcoraci
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
DOC - Permit Finaled | 3/12/2003 | 3/12/2003 | 3/12/2003 | A | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 3/12/2003 10:34:11 AM
|
BLD-Conference | 1/17/2003 | 1/21/2003 | 1/21/2003 | A | PASS |
Tom Arcoraci
|
|
|
work still in progress--ok per tom
|
BLD-Conference | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### after 9am gaurd rail not reqired at drive way
12/18/2002 10:10:07 AM
|
BLD-Conference | 9/30/2002 | 9/30/2002 | 9/30/2002 | P | PASS |
Carl Dependahl
|
|
|
needs to extend permit got post card mailed...large project, WIP. 9/30/2002 1:59:37 PM
|
PostCard Mailed | | | 9/29/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Energy code compliance | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### Chris call to meet there ... ok per 408 3/15/2002 3:53:34 PM
|
BLD-Energy code compliance | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | NR |
Dave Hannah
|
|
|
###-#### CHRIS
|
BLD-Framing/Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Tom Arcoraci
|
|
|
fr chris ###-####
|
BLD-Conference | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 3/5/2002 1:50:25 PM w/ bldr, sent insp to 408 3/5/2002 2:50:45 PM
|
BLD-Conference | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | PASS |
Carl Dependahl
|
|
|
for conf chris ###-#### install smoke dets per 310.9 2/21/2002 9:23:04 AM
|
BLD-Framing/Rough-in | 2/5/2002 | 2/7/2002 | 2/7/2002 | A | PART |
Jim Storey
|
|
|
CHRIS - ###-#### framing ok all but perfarated sher panells,steel beam stifners west of entry at basment level missalined, bearing at floor trusses south east basement miss bearing point on paralam. 2/7/2002 11:24:03 AM
|
BLD-Aging Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | | NR |
Carl Dependahl
|
|
|
wip, big sfd 1/8/2002 6:04:57 PM
|
BLD-Framing/Rough-in | 11/8/2001 | 11/8/2001 | 11/8/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### CHRIS EXTERIOR SHEER WALL ok ext shear 11/8/2001 2:09:09 PM
|
BLD-Framing/Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | NR |
Carl Dependahl
|
|
|
###-#### chris exterior sheer wall , nr recall. 11/7/2001 5:03:06 PM
|
BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/15/2001 10:43:04 AM w/ bldr re req's for fire doors.
|
BLD-Concrete | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/10/2001 4:09:08 PM ok to place non shrink grout at bsmt col bases...will photo.
|
BLD-Foundation | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### chris ( special inspection ) wip, pend report 8/15/2001 4:33:55 PM
|
BLD-Foundation | 8/8/2001 | 8/9/2001 | 8/9/2001 | P | PART |
Carl Dependahl
|
|
|
FOUND CHRIS ###-####--UNDER SPECIAL INSP - STRATA WILL BE THERE, pend report, ok 8/9/2001 5:16:42 PM
|
BLD-Framing/Rough-in | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PART |
Carl Dependahl
|
|
|
partial re-enforcement-- chris ###-#### --if possbile 2?????????????????pend spec insp 8/7/2001 5:03:47 PM
|
BLD-Foundation | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PART |
Steven Webb
|
|
|
special inspection ###-#### Strata to provide report upon completion of project. To inspect every pour. 8/1/2001 9:44:39 AM
|
BLD-Foundation | 7/26/2001 | 7/26/2001 | 7/26/2001 | P | PART |
Dave Hannah
|
|
|
foundation reinforcement Chris ###-#### around 4:00 please under special inspection cmu fire place and elevator saft strata will check rebar 7/26/2001 4:12:03 PM
|
BLD-Foundation | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### partial early as possible 7/25/2001 11:18:30 AM strata on site to insp and test 7/25/2001 11:19:27 AM
|
BLD-Foundation | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PART |
Russ Owen
|
|
|
RE-INFORCEMENT FOR THE FOUND- CHRIS ###-####. cmu ok also will be inspected by strata. 7/20/2001 3:24:10 PM
|
BLD-Foundation | 6/21/2001 | 6/22/2001 | 6/22/2001 | P | PART |
Carl Dependahl
|
|
|
Chris ###-####, spec. insp onsite; walls 6/22/2001 4:25:51 PM
|
BLD-Foundation | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | PART |
Jim Storey
|
|
|
found --before 12 ???????- chris ###-####covered w special pending report. 6/7/2001 11:18:20 AM
|
BLD-Foundation | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | PART |
Carl Dependahl
|
|
|
Chris ###-####...elev sump; recall for front wall & column when steel in place 6/6/2001 3:38:46 PM
|
BLD-Foundation | 5/29/2001 | 5/30/2001 | 5/30/2001 | A | PART |
Jim Storey
|
|
|
partial foundation reinforcement Chris ###-####-set up for special inspection for 5/29/01 mud is poured at 12:00 east wall ok for placement lou with mti will be on site. 5/30/2001 9:49:20 AM
|
BLD-Footing | 5/1/2001 | 5/3/2001 | 5/3/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### spec insp on site per 340 5/3/2001 1:31:53 PM
|
BLD-Conference | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/2/2001 5:14:05 PM w/ Concrete contractor...need spec insp, too.
|
BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/23/2001 11:21:23 AM w/ Chris Walton re soils & spec insps: need approvals for actual site excavations & reinf'd concrete, not just cylinders. Will verify w/ DJO
|
BLD-Conference | 4/18/2001 | 4/20/2001 | 4/20/2001 | A | PART |
Jim Sly
|
|
|
chris ###-#### Met with Chris and STRATA soil Eng. to reveiw soils test report and Inspection procedures. 4/20/2001 12:22:31 PM
|
BLD-Footing | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | PART |
Carl Dependahl
|
|
|
###-####; privacy fence only...need eng's/spec insp for struct fnd's 3/16/2001 2:55:22 PM
|
Issue PAID IN FULL permit | | | 3/12/2001 | | |
|
|
|
|
Plan assigned to (DJO) | 2/26/2001 | 2/26/2001 | 3/9/2001 | | PASS |
Dan Overy
|
|
|
3/9/2001 14:52:58 DJO - activity updated through activity BLDA022 from case BLD01-00379.
|
Case Summary (BLD) | | | 3/9/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 3/9/2001 | | PEND |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/9/2001 | | DONE |
|
|
|
talked to Chris gave dollar amount
|
Plan Reviewer's activity | | | 3/5/2001 | | PEND |
|
|
|
have left message with Bob Archibald to set up conference with who ever the structural inspector may be in order to word permit to cover complexity of work.
|
Plan Reviewer's activity | | | 3/2/2001 | | PEND |
|
|
|
Received new soils engineering from Strata indicating 4000 psf soil bearing design. Have also had phone conversation with Chris Walton about length of SSTB anchor bolts used at basement slab area. Where indicated, areas are over excavated to accomodate for anchor embedment. Will continue review monday.
|
Plan Reviewer's activity | | | 2/28/2001 | | PEND |
|
|
|
initial review started late monday afternoon (02-26-2001) Soils engineering calls out 2000 psf soil bearing capacity. Foundation design based on 4000 psf. Called Bob Howard at Strata wednesday morning (10:15 A.M.) He will contact Pinnacle and get back to me on issue. After problem is resolved, other items need to be discussed.
|
Plans ACCEPTED BY PLAN CHECK | | | 2/26/2001 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 2/20/2001 | 2/20/2001 | 2/21/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 2/20/2001 | 2/20/2001 | 2/21/2001 | | PASS |
|
|
|
|
Application received | | | 2/20/2001 | | |
|
|
|
came in 2/16/2001 address 2/20/2001/pe
|
Routing - PLAN CHECK | 2/21/2001 | 2/21/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 2/20/2001 | | | | PEND |
Dan Overy
|
|
|
|