BLD-Final | 10/17/2001 | 10/18/2001 | 10/18/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 11:42:00. Contact: ###-####. c. of c. #20618 issued 10/18/2001 3:13:09 PM
|
DOC - Permit Finaled | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 10/18/2001 3:13:12 PM
|
BLD-Final | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 07:30:29. Contact: ###-####. C/N issued--tempered glass within 5 ' of tub, need air seal on outside elec. , and shut off needed within 3' of gas range. 9/7/2001 1:50:38 PM
|
BLD-Final | 9/5/2001 | 9/6/2001 | 9/5/2001 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 11:17:59. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/05/2001 at 21:34:20.
|
BLD-Aging Inspection | 7/18/2001 | 7/18/2001 | 7/18/2001 | | PART |
Steven Webb
|
|
|
wip 7/18/2001 7:33:41 AM
|
BLD-Energy code compliance | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 15:22:21. Contact: ###-####. ok to cover 5/18/2001 10:57:46 AM
|
BLD-Framing/Rough-in | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 10:34:05. Contact: ###-####. Ok to insulate 5/16/2001 12:40:51 PM
|
BLD-Framing/Rough-in | 5/14/2001 | 5/15/2001 | 5/15/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 11:42:04. Contact: ###-####. C/N issued--do not insulate. 5/15/2001 9:30:38 AM
|
BLD-Foundation | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | PASS |
Steven Webb
|
|
|
shear insp Greg ###-#### SHEAR- Exterior ok, prior c/n items corrected--Need interior shear on sheetrock at bonus room above garage. 4/27/2001 8:41:25 AM
|
BLD-Framing/Rough-in | 4/25/2001 | 4/26/2001 | 4/26/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### GREG -SHEAR WALL c/n posted on site, 4/26/2001 10:27:53 AM
|
Override - Parcel Holds | | | 4/26/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/26/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/25/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/25/2001 | | |
|
|
|
|
BLD-Foundation | 3/22/2001 | 3/23/2001 | 3/23/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### wip 3/23/2001 10:19:45 AM
|
BLD-Foundation | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | NR |
Steven Webb
|
|
|
###-#### Contractor will call for new inspection. 3/22/2001 2:12:04 PM
|
Override - Parcel Holds | | | 3/22/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 3/22/2001 | | |
|
|
|
|
BLD-Footing | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | PART |
Steven Webb
|
|
|
Clint ###-#### after beep 14236 wip 3/21/2001 11:51:17 AM
|
Override - Parcel Holds | | | 3/20/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 3/14/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/14/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/14/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/8/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/8/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2001 | | DONE |
|
|
|
called permit ready
|
Plan assigned to (SAM) | 3/1/2001 | | 3/8/2001 | | PASS |
Steve Munroe
|
|
|
3/8/2001 10:32:39 SAM - activity updated through activity BLDA022 from case BLD01-00432.
|
Plan Reviewer's activity | | | 3/5/2001 | | PEND |
|
|
|
Plan review is finished. I am waiting for release from Jim Wyllie on flood plain.
|
Pending Assignment by DJO | 2/22/2001 | | 3/1/2001 | | DONE |
Dan Overy
|
|
|
3/1/2001 09:03:48 SAM - activity updated through activity BLDA183 from case BLD01-00432.
|
Routing - PUBLIC WORKS | 2/23/2001 | 2/23/2001 | 2/23/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 2/23/2001 | 2/23/2001 | 2/23/2001 | | PASS |
|
|
|
|
Application received | | | 2/22/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 2/23/2001 | 2/23/2001 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
3/1/01 14:20 Called Matrix and talked to them about footing sizes. They decided to size footings at point load locations rather than having 48" sq. x 12" deep footing put in. They will get back with me.
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|