Permit Information
Permit NumberBLD01-00445
StatusFinaled
Name DAY ROBERT L &
Site Address 6679 S SUPPLY WAY
Project NameMJ'S BACKHOE
Customer Number 
ePlanReviewNo
Description
To construct a new 5,175 square foot, two story, engineered metal building, vehicle repair garage, with related office area. The first floor is 4,200 sq.ft. the second floor is 975 sq.ft., 3,000 sq.ft on the first floor is an Group H-4 repair garage with approximately 1,200 sq.ft. of office area the second floor is office area. All construction is per the approved plans, attached comment list and CABO/ANSI A117.1. DRH00-00138, PC#0157-01 MJP Grading and Drainage Permit # is BLD 01-00414
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/23/20012/23/20017/19/2002 DONE
BLD-Final1/28/20021/28/20021/28/2002 DONE
Final, ok per Jim Storey.
Permanent Occupancy 1/28/20021/28/2002 DONE
Details
Permanent occupancy  1/28/2002 DONE
Perm. Occ. Cert. #9005 issued 1-28-02 to MJ's Backhoe.
Temporary occupancy  1/4/2002 DONE
Temp occ #4698 issued to MJ's Backhoe Service on 1-4-02.
BLD-Final12/27/200112/28/200112/28/2001APART
DetailsJim Storey
###-#### TEMPORARY OCCUPANCY temp ok pending achd and p&z sign off. 12/28/2001 11:11:03 AM
FIRE-Final Inspection12/28/200112/28/200112/28/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 12/28/2001 9:25:38 AM
BLD-Final12/28/200112/28/200112/28/2001PDONE
DetailsJim Storey
CARL ###-####
FIRE-Conference12/21/200112/26/200112/26/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/21/2001 at 11:04:11. Contact: ###-####. need address, hang extinguishers; 12/26/2001 8:25:36 AM
BLD-Final12/21/200112/26/200112/26/2001AFAIL
DetailsJim Storey
temp occ ###-#### fire stopping and handraillings/ ada gragbar and under sink protection. 12/26/2001 9:11:05 AM 12/26/2001 9:12:38 AM
BLD-Other12/21/200112/26/200112/26/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/21/2001 at 15:01:28. Contact: . door sign/temp glazing/pending others. 12/26/2001 9:14:00 AM
BLD-Wall cover11/7/200111/9/200111/9/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/07/2001 at 14:34:22. Contact: ###-####. Ok to cover office area--short guardrail was to short verbal correction given to correct--will verify correct height at final. 11/9/2001 9:58:45 AM
BLD-Framing/Rough-in10/30/200110/31/200110/31/2001AFAIL
DetailsSteven Webb
###-#### c/n posted-no approved plans or the prior c/n. Do not cover. 10/31/2001 9:05:35 AM
BLD-Framing/Rough-in10/17/200110/18/200110/18/2001AFAIL
DetailsJim Storey
###-####\\ steal stud c/n on site. 10/18/2001 3:52:37 PM
BLD-Foundation9/20/20019/21/20019/21/2001APASS
DetailsJim Storey
###-#### wall ok for cover south side of project. 9/21/2001 2:34:23 PM
BLD-Footing9/18/20019/18/20019/18/2001PPASS
DetailsJim Storey
###-#### carl rebar south ft retaining wall ft ok 9/18/2001 11:43:26 AM
BLD-Conference9/13/20019/14/20019/14/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/13/2001 at 13:47:52. Contact: ###-####. placed with special insp. pending report for slab. 9/14/2001 10:03:19 AM
BLD-Footing8/28/20018/29/20018/29/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/28/2001 at 13:43:36. Contact: ###-####. mat rebar ok special insp. to be on site. 8/29/2001 9:57:30 AM
BLD-Footing8/23/20018/27/20018/24/2001ACANC
DetailsJim Storey
FT INSP SKIP ###-#### Disp set to [CANC] by a contractor via Hello! on 08/24/2001 at 16:43:20.
(F) Reprint permit  8/7/2001 DONE
Issue PAID IN FULL permit  8/2/2001 DONE
Routing - PLAN CHECK7/13/2001 7/19/2001 DONE
Plan Reviewer's activity  7/19/2001 PASS
Print Pending Permit.LaserJet4  7/19/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/19/2001 DONE
Case Summary (BLD)  7/19/2001 DONE
Inspection Record Card- Bld  7/19/2001 DONE
Print Occupancy Form  7/19/2001 DONE
Telephone call  7/19/2001 DONE
Larry Sundell at ###-####
Plan assigned to (M_P)2/26/2001 7/19/2001 PASS
DetailsMike Phillips
7/19/2001 10:30:01 M_P - activity updated through activity BLDA022 from case BLD01-00445.
Routing - FIRE7/18/20017/18/20017/18/2001 PASS
DetailsBill Alexander
Routing - FIRE7/12/2001 7/13/2001 FAIL
APPLICANT STILL DID NOT RESPOND TO FIRE DEPARTMENT PLAN REVIEW QUESTIONS.
Plan Reviewer's activity  7/12/2001 PEND
Waiting for others to approve prior to issuing permit.
Routing - PLAN CHECK6/19/2001 7/12/2001 DONE
Plan resubmittals received  6/28/2001 DONE
Received plan resubmittals from Sundell Architecture, two copies of one and 5 copies of Structural plans, forwarded same to Mike Phillips with small documents. 6/28/01 DAR
Routing - FIRE6/15/2001 6/19/2001 FAIL
client didn't respond to items in plan review letter by JWA
Plan Reviewer's activity  6/15/2001 FAIL
Additional information required for third review.
Routing - PLAN CHECK5/10/2001 6/15/2001 FAIL
Routing to fire for second review.
Plan resubmittals received  6/8/2001 DONE
Received two sets of plan resubmittals from Sundell Architecture plus small documents, fordwarded same to Mike Phillips. 6/8/01 DAR
Routing - FIRE5/7/20015/10/20015/10/2001 FAIL
DetailsBill Alexander
Routing Off Site - STRUCTURAL3/28/20014/10/20015/7/2001 FAIL
Sent plans for structural review to consultanting engineer via PDQ
Second review not required by outside engineering firm. MJP
Plan Reviewer's activity  5/7/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK4/10/2001 5/7/2001 FAIL
Routing to fire.
Routing - PLUMBING4/6/2001 4/10/2001 PASS
vent upper end of branch lines in garage drainage system, use pvc or c.i. or other approved material in garage drainage system, not abs, pan drain required for water heater on 2nd floor, pipe to garage floor, thermol expantion protection required.
Routing - PLANNING4/4/2001 4/6/2001 PASS
Approved per DRH00-138.
Routing - PUBLIC WORKS3/28/2001 4/5/2001 PASS
Additional plans submitted  3/27/2001 PASS
Received required numbers of plans from Mike Apostolou, 3 sets of everything . 3/27/01 DAR
Additional plans submitted  3/22/2001 FAIL
Received 3 sets of shop drawings for steel building and 2 structural caculations from Larry Sundell, Architect. 3/22/01 DAR
Plans ACCEPTED BY PLAN TECH  2/26/2001 FAIL
Requested Engineered drawings for steel building and 3 complete sets of plans from Larry Sundell, Architect. 2/26/01 DAR
Application received  2/23/2001  
Recd Pcfee & Taken To Pln CK     
Routing - PLAN CHECK7/18/2001