(F) Reprint permit | | | 6/4/2008 | | |
|
|
|
|
Fee Review-notes | 2/23/2001 | 2/23/2001 | 1/29/2002 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/10/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/9/2001 | 8/9/2001 | | DONE |
|
|
|
|
BLD-Final | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### ; c/n ok, card to contractor. 8/9/2001 5:13:41 PM
|
Permanent occupancy | | | 8/9/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8785 issued 8-9-01 to the Dublin Up Irish Pub and Eatery.
|
FIRE-Final Inspection | 6/25/2001 | 6/25/2001 | 6/25/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 6/25/2001 7:37:22 AM
|
BLD-Final | 6/15/2001 | 6/15/2001 | 6/15/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### keep c/n, kitchen ok for t/o 6/15/2001 6:20:34 PM
|
BLD-Conference | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | PASS |
Carl Dependahl
|
|
|
Jeff, ###-####; keep c/n...consult w/ fire insp. 6/13/2001 9:10:49 AM
|
BLD-Conference | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Carl Dependahl
|
|
|
for conf-- ###-####- jeff ...obtain other sig's for final...ok for bar area 5/21/2001 3:49:37 PM
|
BLD-Final | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Carl Dependahl
|
|
|
temp occ Jeff ###-#### ...see c/n 5/21/2001 5:15:34 PM
|
BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/21/2001 10:30:37 AM ok to cover wall at hall; maintain exit req's
|
BLD-Conference | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/18/2001 1:18:56 PM w/ bldr...need clarify fire issues
|
FIRE-Sprinkler Rough-in | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PART |
Rick Jackson
|
|
|
Randy ###-#### temp issued per Dave Miler and alarm issues resolved 5/21/2001 7:12:00 AM
|
BLD-Conference | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### Conference ...w/ bldr, returned approved resub 5/15/2001 2:51:27 PM
|
BLD-Conference | 5/11/2001 | 5/11/2001 | 5/11/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/11/2001 10:20:00 AM
|
BLD-Conference | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/9/2001 3:49:55 PM w/ Carl Westfall, submittal re entry/exit doors; ok as shown to sing entry doors in if signed and pemanently open during business.
|
BLD-Framing/Rough-in | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Carl Dependahl
|
|
|
Jeff Inman ###-#### please call 15 minutes before you go out; rec'd resub for entry door & fix for glu lam drilled 5/8/2001 11:43:38 AM
|
BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PART |
Carl Dependahl
|
|
|
jeff ###-####, beam repaired per eng'r 5/8/2001 2:25:19 PM
|
BLD-Conference | 5/4/2001 | 5/4/2001 | 5/4/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/4/2001 8:37:50 AM w/ Jeff & eng'r re fix for bored glu-lam..submit spec.
|
BLD-Framing/Rough-in | 5/2/2001 | 5/3/2001 | 5/3/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### please call 15 minutes before you go out ok to cover bar soffit, kitchen side floors; eng'r to ok beam fix in writing 5/3/2001 12:24:07 PM
|
BLD-Framing/Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### please call first 15 min. prior to meet there...conf w/ eng'r re 5/2/2001 12:40:30 PM c/n...holes at beam 5/2/2001 12:40:47 PM
|
BLD-Framing/Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### ok to cover walls at hallway & kitchen, keep c/n. ok to rock above soffit. 5/1/2001 2:26:10 PM
|
BLD-Framing/Rough-in | 4/27/2001 | 4/30/2001 | 4/30/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### call 15min before you go, c/n: nee deng'g for holes in beam for plbg, verify hood operation, submit for main doors. Ok to cover other walls 4/30/2001 1:23:16 PM
|
BLD-Conference | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | PASS |
Carl Dependahl
|
|
|
jeff Inman ###-####, need other r/i's & arch's detail for walls prior to frame insp. 4/26/2001 2:27:10 PM
|
BLD-Conference | 4/26/2001 | 4/26/2001 | 4/26/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/26/2001 10:30:49 AM w/jeff re insp process
|
Issue PAID IN FULL permit | | | 4/18/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/16/2001 | | 4/17/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/17/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/17/2001 | | DONE |
|
|
|
permit ready
|
Plan assigned to (CJW) | 3/5/2001 | | 4/17/2001 | | PASS |
Carl Westfall
|
|
|
4/17/01 10:20:26 CJW - activity updated through activity BLDA022 from case BLD01-00452.
|
Routing - PLUMBING | 4/13/2001 | | 4/16/2001 | | PASS |
|
|
|
To review resubmitted drawing. interceptor relocation resub ok
|
Plan resubmittals received | | | 4/13/2001 | | DONE |
|
|
|
Received 3 sets of P1.0 resubmittals from CSHQA, forwarded same to Carl Westfall. 4/13/01 DAR
|
Routing - PUBLIC WORKS | 4/13/2001 | | 4/13/2001 | | PASS |
|
|
|
To review resubmitted drawing.
|
Routing - PLAN CHECK | 3/29/2001 | | 4/13/2001 | | PASS |
|
|
|
Second UBC plan review completed April 9, 2001. Drawings were approved. Called architect and explained that since the grease interceptor was being moved, resubmitted Sheet P1.0 was required. The Fire Department still needed information about the grease hood. Central District Health may want kitchen drawings. Drawings will be stalled until these issues are resolved.
|
Routing - FIRE | 4/11/2001 | 4/11/2001 | 4/11/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/5/2001 | | |
|
|
|
2 copies of a2.1/took to carl w
|
Plan Review Completed(1st rev) | | | 3/29/2001 | | |
|
|
|
Failed first UBC and UFC review.
|
Routing - FIRE | 3/27/2001 | | 3/29/2001 | | |
|
|
|
Failed first UFC review. need kitchen hood info
|
Plan Reviewer's activity | | | 3/28/2001 | | |
|
|
|
Faxed failed items, as listed on the plan review report, to Stephen Green with CSHQA.
|
Routing - PLAN CHECK | 3/7/2001 | | 3/27/2001 | | |
|
|
|
Failed first UBC review.
|
Plan Reviewer's activity | | | 3/26/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started March 26, 2001 and finished the next day. A response was required from the architect. See the conditions list. A plan review report was sent to the architect.
|
Routing - PLUMBING | 3/6/2001 | | 3/7/2001 | | PASS |
|
|
|
indirect waste receptors are to be located in full view, not under equipment or with in cabinets, additional cross connection protection may be required, foot vents for bar area floor sinks must be 6' above flood level prior to reconnection, grease interceptor vent must tie in above flood level of fixtures.
|
Routing - PUBLIC WORKS | 3/5/2001 | | 3/6/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/28/2001 | | PASS |
|
|
|
Received a new set of plans with Plumb. and a new application. KMM 2/28/01-Signed by Carol Johnson, Central District Health.
|
Received Certificate of Value | | | 2/23/2001 | | DONE |
|
|
|
|
Application received | | | 2/23/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|