Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00452
StatusFinaled
Name DUBLIN UP IRISH PUB AND EATERY
Site Address 800 W IDAHO ST 2ND FLOOR
Project NameTHE MODE BLDG-2ND FLR
Customer Number 
ePlanReviewNo
Description
(DUBLIN UP IRISH PUB & EATERY) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To remodel a 5,618 square foot restaurant tenant space on the 2nd floor of the "Mode Building" for a new tenant. This space was formerly occupied by "Noodles Restaurant". The 1,700 square foot kitchen will remain virtually unchanged. Work is to include guardrails, interior nonbearing walls, floor coverings, a bar, a 1,000 gallon grease interceptor, and furniture all per approved drawings, engineering, and plan review conditions on file. The capacity of the assembly area (250) shall be posted on an approved sign near the main exit from the restaurant. Fire sprinkler heads shall be located per NFPA 13-1999 as regulated by the Fire Department. PC-0162-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  6/4/2008  
Fee Review-notes2/23/20012/23/20011/29/2002 DONE
(F) Reprint permit  8/10/2001 DONE
Permanent Occupancy 8/9/20018/9/2001 DONE
Details
BLD-Final8/9/20018/9/20018/9/2001PPASS
DetailsCarl Dependahl
###-#### ; c/n ok, card to contractor. 8/9/2001 5:13:41 PM
Permanent occupancy  8/9/2001 DONE
Perm. Occ. Cert. #8785 issued 8-9-01 to the Dublin Up Irish Pub and Eatery.
FIRE-Final Inspection6/25/20016/25/20016/25/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 6/25/2001 7:37:22 AM
BLD-Final6/15/20016/15/20016/15/2001PPART
DetailsCarl Dependahl
###-#### keep c/n, kitchen ok for t/o 6/15/2001 6:20:34 PM
BLD-Conference6/12/20016/13/20016/13/2001APASS
DetailsCarl Dependahl
Jeff, ###-####; keep c/n...consult w/ fire insp. 6/13/2001 9:10:49 AM
BLD-Conference5/18/20015/21/20015/21/2001APASS
DetailsCarl Dependahl
for conf-- ###-####- jeff ...obtain other sig's for final...ok for bar area 5/21/2001 3:49:37 PM
BLD-Final5/21/20015/21/20015/21/2001PPART
DetailsCarl Dependahl
temp occ Jeff ###-#### ...see c/n 5/21/2001 5:15:34 PM
BLD-Framing/Rough-in5/21/20015/21/20015/21/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/21/2001 10:30:37 AM ok to cover wall at hall; maintain exit req's
BLD-Conference5/18/20015/18/20015/18/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/18/2001 1:18:56 PM w/ bldr...need clarify fire issues
FIRE-Sprinkler Rough-in5/18/20015/18/20015/18/2001PPART
DetailsRick Jackson
Randy ###-#### temp issued per Dave Miler and alarm issues resolved 5/21/2001 7:12:00 AM
BLD-Conference5/15/20015/15/20015/15/2001PPASS
DetailsCarl Dependahl
###-#### Conference ...w/ bldr, returned approved resub 5/15/2001 2:51:27 PM
BLD-Conference5/11/20015/11/20015/11/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/11/2001 10:20:00 AM
BLD-Conference5/9/20015/9/20015/9/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/9/2001 3:49:55 PM w/ Carl Westfall, submittal re entry/exit doors; ok as shown to sing entry doors in if signed and pemanently open during business.
BLD-Framing/Rough-in5/7/20015/8/20015/8/2001APART
DetailsCarl Dependahl
Jeff Inman ###-#### please call 15 minutes before you go out; rec'd resub for entry door & fix for glu lam drilled 5/8/2001 11:43:38 AM
BLD-Framing/Rough-in5/8/20015/8/20015/8/2001PPART
DetailsCarl Dependahl
jeff ###-####, beam repaired per eng'r 5/8/2001 2:25:19 PM
BLD-Conference5/4/20015/4/20015/4/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/4/2001 8:37:50 AM w/ Jeff & eng'r re fix for bored glu-lam..submit spec.
BLD-Framing/Rough-in5/2/20015/3/20015/3/2001APART
DetailsCarl Dependahl
###-#### please call 15 minutes before you go out ok to cover bar soffit, kitchen side floors; eng'r to ok beam fix in writing 5/3/2001 12:24:07 PM
BLD-Framing/Rough-in5/1/20015/2/20015/2/2001APART
DetailsCarl Dependahl
###-#### please call first 15 min. prior to meet there...conf w/ eng'r re 5/2/2001 12:40:30 PM c/n...holes at beam 5/2/2001 12:40:47 PM
BLD-Framing/Rough-in4/30/20015/1/20015/1/2001APART
DetailsCarl Dependahl
###-#### ok to cover walls at hallway & kitchen, keep c/n. ok to rock above soffit. 5/1/2001 2:26:10 PM
BLD-Framing/Rough-in4/27/20014/30/20014/30/2001APART
DetailsCarl Dependahl
###-#### call 15min before you go, c/n: nee deng'g for holes in beam for plbg, verify hood operation, submit for main doors. Ok to cover other walls 4/30/2001 1:23:16 PM
BLD-Conference4/26/20014/27/20014/27/2001APASS
DetailsCarl Dependahl
jeff Inman ###-####, need other r/i's & arch's detail for walls prior to frame insp. 4/26/2001 2:27:10 PM
BLD-Conference4/26/20014/26/20014/26/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/26/2001 10:30:49 AM w/jeff re insp process
Issue PAID IN FULL permit  4/18/2001 DONE
Routing - PLAN CHECK4/16/2001 4/17/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/17/2001 PASS
Print Occupancy Form  4/17/2001 DONE
Inspection Record Card- Bld  4/17/2001 DONE
Telephone call  4/17/2001 DONE
permit ready
Plan assigned to (CJW)3/5/2001 4/17/2001 PASS
DetailsCarl Westfall
4/17/01 10:20:26 CJW - activity updated through activity BLDA022 from case BLD01-00452.
Routing - PLUMBING4/13/2001 4/16/2001 PASS
To review resubmitted drawing. interceptor relocation resub ok
Plan resubmittals received  4/13/2001 DONE
Received 3 sets of P1.0 resubmittals from CSHQA, forwarded same to Carl Westfall. 4/13/01 DAR
Routing - PUBLIC WORKS4/13/2001 4/13/2001 PASS
To review resubmitted drawing.
Routing - PLAN CHECK3/29/2001 4/13/2001 PASS
Second UBC plan review completed April 9, 2001. Drawings were approved. Called architect and explained that since the grease interceptor was being moved, resubmitted Sheet P1.0 was required. The Fire Department still needed information about the grease hood. Central District Health may want kitchen drawings. Drawings will be stalled until these issues are resolved.
Routing - FIRE4/11/20014/11/20014/11/2001 PASS
Plan resubmittals received  4/5/2001  
2 copies of a2.1/took to carl w
Plan Review Completed(1st rev)  3/29/2001  
Failed first UBC and UFC review.
Routing - FIRE3/27/2001 3/29/2001  
Failed first UFC review. need kitchen hood info
Plan Reviewer's activity  3/28/2001  
Faxed failed items, as listed on the plan review report, to Stephen Green with CSHQA.
Routing - PLAN CHECK3/7/2001 3/27/2001  
Failed first UBC review.
Plan Reviewer's activity  3/26/2001  
Failed first UBC review. UBC plan review started March 26, 2001 and finished the next day. A response was required from the architect. See the conditions list. A plan review report was sent to the architect.
Routing - PLUMBING3/6/2001 3/7/2001 PASS
indirect waste receptors are to be located in full view, not under equipment or with in cabinets, additional cross connection protection may be required, foot vents for bar area floor sinks must be 6' above flood level prior to reconnection, grease interceptor vent must tie in above flood level of fixtures.
Routing - PUBLIC WORKS3/5/2001 3/6/2001 PASS
Plans ACCEPTED BY PLAN TECH  2/28/2001 PASS
Received a new set of plans with Plumb. and a new application. KMM 2/28/01-Signed by Carol Johnson, Central District Health.
Received Certificate of Value  2/23/2001 DONE
Application received  2/23/2001  
Recd Pcfee & Taken To Pln CK