Permit Information
Permit NumberBLD01-00460
StatusFinaled
Name LES SCHWAB TIRE CENTERS OF
Site Address 6017 W FAIRVIEW AVE
Project NameLES SCHWAB TIRES
Customer Number 
ePlanReviewNo
Description
(LES SCHWAB TIRES) To add approximately 3,640 sq.ft. to the existing vehicle repair garage and modify existing CMU wall to a two hour area separation wall. The area separation wall will divide this building into two separate buildings. The east portion will be 4,140 sq.ft and the remainder building will be 15,900 sq.ft. Additional work included in this permit is to remodel the interior retail sales area and provide a one-hour occupancy separation wall between the repair garage area and the office, retail areas. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. DRH01-00014 PC#165-01 MJP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/26/20012/26/20015/15/2002 DONE
no valuse entered for fire....7/22/02--left mesg for Tammy(GC) that we need final cert.
Permanent occupancy UNPAID FEE  4/29/2002 DONE
Perm. Occ. #9116 issued 4-29-02 to Les Schwab Tire Co.
Permanent Occupancy 4/26/20024/26/2002 DONE
Details
BLD-Final4/25/20024/26/20024/26/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/25/2002 at 13:13:26. Contact: ###-####. ok for perm 4/26/2002 4:56:35 PM
FIRE-Final Inspection4/26/20024/26/20024/26/2002APASS
DetailsTroy Cobbley
fire life/safety, fire alarm and fire sprinkler finaled
BLD-Final4/12/20024/15/20024/15/2002PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/12/2002 at 15:16:42. Contact: ###-####.
BLD-Final1/30/20021/31/20021/31/2002AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/30/2002 at 09:48:13. Contact: ###-####. needs door label ect in 2 hr wall 1/31/2002 12:19:37 PM
BLD-Framing/Rough-in1/14/20021/15/20021/15/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/14/2002 at 12:14:07. Contact: ###-####. wip ok to cover bath walls and ceiling 1/15/2002 10:17:39 AM
BLD-Framing/Rough-in12/27/200112/28/200112/28/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/27/2001 at 15:01:24. Contact: ###-####. wip 1 hr occ sep wall 12/28/2001 9:23:38 AM
BLD-Wall cover12/17/200112/18/200112/18/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/17/2001 3:35:24 PM partial occ sep wall ok 12/18/2001 2:39:09 PM
BLD-Framing/Rough-in12/17/200112/18/200112/18/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/17/2001 at 09:18:59. Contact: ###-####. wip 12/18/2001 8:34:52 AM
BLD-Wall cover12/17/200112/17/200112/17/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/17/2001 3:34:42 PM
BLD-Wall cover12/14/200112/14/200112/14/2001PCANC
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/14/2001 9:33:05 AM wip 12/14/2001 1:52:03 PM
BLD-Conference11/30/200111/30/200111/30/2001APASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 11/30/2001 8:13:43 AM occ sep ok to have truss pass thru if fire stopped around truss per mike phillips 11/30/2001 8:40:21 AM
BLD-Framing/Rough-in11/28/200111/29/200111/29/2001PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/28/2001 at 14:57:40. Contact: ###-####. need new detail for occ wall
cn issued 11/29/2001 12:42:01 PM
BLD-Framing/Rough-in10/31/200111/1/200111/1/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/31/2001 at 09:06:58. Contact: ###-####. wip 11/1/2001 9:30:06 AM
BLD-Conference10/19/200110/19/200110/19/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 10/19/2001 3:20:21 PM wip 10/19/2001 4:44:32 PM
BLD-Framing/Rough-in10/12/200110/12/200110/12/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/12/2001 at 07:22:43. Contact: ###-####. wip 10/12/2001 11:18:37 AM
BLD-Framing/Rough-in10/12/200110/12/200110/12/2001PPART
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 10/12/2001 10:25:57 AM wip 10/12/2001 2:56:03 PM
BLD-Framing/Rough-in9/26/200110/3/200110/3/2001APART
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 9/26/2001 8:34:05 AM wip 10/3/2001 8:37:23 AM
BLD-Framing/Rough-in9/28/200110/1/200110/1/2001ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/28/2001 at 09:42:49. Contact: ###-####.
BLD-Framing/Rough-in10/1/200110/1/200110/1/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/01/2001 at 10:09:50. Contact: ###-####. roof nailing and straping 10/1/2001 4:49:10 PM
BLD-Framing/Rough-in9/18/20019/26/20019/26/2001APART
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 9/18/2001 4:30:33 PM see randy WIP 9/26/2001 11:24:10 AM
BLD-Framing/Rough-in9/17/20019/18/20019/18/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/17/2001 at 11:45:57. Contact: ###-####. spec insp 9/18/2001 3:27:21 AM
BLD-Footing9/5/20019/6/20019/6/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/05/2001 at 11:24:59. Contact: ###-####.
BLD-Conference8/29/20018/29/20018/29/2001PPASS
DetailsTom Arcoraci
for conf --randy-- ###-#### pre job conf 8/29/2001 5:07:01 AM
Issue PAID IN FULL permit  8/14/2001 DONE
Print Occupancy Form  8/9/2001 DONE
Inspection Record Card- Bld  8/9/2001 DONE
Plan Reviewer's activity  8/8/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/8/2001 DONE
Plan assigned to (M_P)2/27/2001 8/8/2001 PASS
DetailsMike Phillips
8/8/2001 14:49:06 M_P - activity updated through activity BLDA022 from case BLD01-00460.
Plan resubmittals received  7/19/2001 DONE
Received two sets of plan resubmittals from BRS Architects, forwarded same to Mike Phillips. 7/19/01 DAR
Routing - PLAN CHECK6/8/2001 7/9/2001  
Plan resubmittals received  7/9/2001  
submitted 1 c-4 gave to richard
Routing - FIRE7/9/2001 7/9/2001 PASS
Routing - FIRE6/29/20016/29/20016/29/2001 FAIL
Routing - FIRE6/6/2001 6/8/2001 FAIL
water, hydrants, hose stations, detection
Routing - PUBLIC WORKS6/1/2001 6/6/2001 PASS
Plan Reviewer's activity  6/1/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK3/12/2001 6/1/2001 FAIL
Routing to fire.
Plan resubmittals received  5/15/2001 DONE
Received three copies of plans. M-1 sheet is to be removed per Steve Pardue of BRS. Routed to Mike P. KMM
Plan Reviewer's activity  3/26/2001 HOLD
Discussed with architect about building options and fire sprinklers requirements. He will be discussing with owner and getting back aith me for a design change.
Routing - PLUMBING3/8/2001 3/12/2001 PASS
Plan resubmittals received  3/7/2001 DONE
Received three copies of revised sheet L-1. Put with plans. KMM
Routing - PLANNING3/5/2001 3/7/2001 PASS
Approve per DRH01-14 and resubmitted plans.
Routing - PLAN CHECK2/28/2001 3/5/2001 PASS
Waiting for resubmitted SD1, A2.1 before sending to P&Z. Plans on my table. KMM
3/2/01 Resubmittals received, however sheets not stamped or signed. Contacted Kevin McPherson of this need. KMM
3/5/01 Received stamped and signed sheets. KMM
Plan resubmittals received  3/5/2001 DONE
Received six copies of revised stamped and signed sheets SD-1 and A2.1. Put two copies with plans, one extra for tempra with plans and the remaining extra three in box. KMM
Plan resubmittals received  3/2/2001 FAIL
Received plan resubmittals from BRS, 6 sets each of SD-1 and A2-1. Plans not stamped or signed. Contacted BRS. KMM
Telephone call  3/1/2001 DONE
left message with Steve Pardew about the correct A-2.1 L-1, SD-1
Routing - PUBLIC WORKS2/27/2001 2/28/2001 FAIL
Requires drainage plan revisions per brian M. KMM
Plans ACCEPTED BY PLAN TECH  2/27/2001 DONE
Received Certificate of Value  2/27/2001 DONE
Plan routing begun/NEW & ADDTN  2/27/2001 DONE
Application received  2/26/2001  
Recd Pcfee & Taken To Pln CK  2/26/2001 DONE
Routing - PLAN CHECK7/9/2001    
took to mike p