Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00491
StatusFinaled
Name ESI
Site Address 5230 W FRANKLIN RD
Project NameFRED MEYER
Customer Number 
ePlanReviewNo
Description
FRED MEYER RETAIL STORE * TO CONSTRUCT A NEW 176,700 SQ. FT., ONE STORY RETAIL BUILDING WHICH INCLUDES GROCERY, BAKERY, DELI, STARBUCKS COFFEE BAR, CLOTHING, BUILDING MATERIALS, GARDEN SHOP AND GENERAL MECHANDISE. THIS BUILDING WILL ALSO INCLUDE FOUR FUTURE TENANT SHELL SPACES WITH VANILLA FINISH. CONSTRUCTED OF CONCRETE SLAB FLOORS, MASONRY EXTERIOR WALLS AND STRUCTURAL STEEL FRAME AND STEEL JOISTS WITH METAL ROOF DECK AND SINGLE PLY ROOFING SYSTEM. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR UNLIMITED AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THE FUTURE TENANT SPACES REQUIRE SEPARATE TENANT IMPROVEMENT PERMITS TO FINISH FOR OCCUPANCY. DRH00-00101/#01-172/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/3/2002 DONE
(F) Reprint permit  2/28/2002 DONE
(F) Reprint permit  2/28/2002 DONE
Fee Review-notes2/28/20012/28/20012/1/2002 DONE
11-26--called esi they said they are done with the paper work and are checking on the owner supplied equipment contact permit.
Permanent Occupancy 12/17/200112/17/2001 DONE
Details
BLD-Final12/14/200112/17/200112/17/2001APASS
DetailsTom Arcoraci
###-#### ok for perm 12/17/2001 9:30:38 AM hen others sign 12/17/2001 9:30:53 AM
Permanent occupancy UNPAID FEE  12/17/2001 DONE
Perm. Occ. Cert. #8962 issued 12-17-01 to Fred Meyer.
Print Occupancy Form  11/14/2001 DONE
BLD-Final11/13/200111/13/200111/13/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 11/13/2001 11:36:42 AM ok for perm occ when others sign perm occ
Temporary occupancy  11/13/2001 PART
Temp. Occ. Cert. #4638 issued 11-13-01 to Fred Meyer.
BLD-Conference11/9/200111/9/200111/9/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 11/9/2001 11:25:54 AM
BLD-Final11/9/200111/9/200111/9/2001PCANC
DetailsTom Arcoraci
###-####this insp was added after 3 pm?????
11/9/2001 4:26:11 PM
Code Occupancy Approval  11/9/2001 PASS
FINAL OCCUPANCY SIGNED OFF.
FIRE-Final Inspection11/2/200111/5/200111/5/2001PFAIL
DetailsTroy Cobbley
add extinguisher at customer service and relocate one in the home stockroom, add exit sign at employee exit, repair exit sign in EPM, main entrance, and home entry, paint curbs and post signs, install knox box 11/6/2001 8:57:37 AM
FIRE-Final Inspection11/2/200111/5/200111/5/2001PCANC
DetailsTroy Cobbley
duplicate inspection 11/6/2001 8:55:29 AM
BLD-Framing/Rough-in9/27/20019/27/20019/27/2001PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/27/2001 at 08:30:13. Contact: ###-####. 9/27/2001 2:43:23 PM needs siezmic pods in kitchen. 9/27/2001 3:07:22 PM
BLD-Framing/Rough-in8/15/20018/15/20018/15/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/15/2001 at 10:01:56. Contact: ###-####. partial grid inspection wip 8/15/2001 3:06:11 AM
BLD-Framing/Rough-in8/6/20018/6/20018/6/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/06/2001 at 08:55:34. Contact: ###-####. wip 8/6/2001 4:48:34 AM
BLD-Framing/Rough-in7/23/20017/23/20017/23/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/23/2001 at 09:44:53. Contact: ###-####. ok tocover food entry check for straps, grid in appls ok, ok to start cover at deli area has new detail for entrys 7/23/2001 2:49:28 AM
BLD-Framing/Rough-in7/16/20017/16/20017/16/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/16/2001 at 07:48:05. Contact: ###-####. ITEMS FROM LAST CN COMPLETE 7/16/2001 5:05:14 AM
BLD-Conference7/12/20017/12/20017/12/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 7/12/2001 8:37:19 AM w/ bldr re c/n of 7-11.
BLD-Framing/Rough-in7/11/20017/11/20017/11/2001PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/11/2001 at 09:44:21. Contact: ###-####.c/n, need approved fabricator cert for steel joists, etc...1hr assy at req'd corridors to south side, wrap boxes, add web stiffeners; show frame diagram for entry ceilings, etc...not shown on plans 7/11/2001 6:38:20 PM
BLD-Framing/Rough-in7/5/20017/5/20017/5/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 07/05/2001 at 08:43:45. Contact: ###-####. Check listing for corridor (1hr) Ceiling. Tenant walls and Misc walls 1 side and Recall for insp. 7/5/2001 3:26:46 PM
BLD-Conference6/25/20016/25/20016/25/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 6/25/2001 8:11:39 PM WIP OK
BLD-Wall cover6/20/20016/20/20016/20/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/20/2001 at 10:44:21. Contact: ###-####. ok to cover west walls and messinine 6/20/2001 4:59:46 AM
Plan Reviewer's activity  6/15/2001 PASS
Reviewed and approved structural plans and calculations for the steel structural frame for the garden center plant cover. This is a deferred submittal of the structural frame only. This area was previously approved for foundation and nonstructural building code requirements. JCM
BLD-Conference6/13/20016/13/20016/13/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 6/13/2001 10:49:45 PM mti on site eng aware of all discrips
BLD-Other5/30/20015/31/20015/31/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/30/2001 at 13:56:27. Contact: ###-####. MTI ON SITE 5/31/2001 2:20:38 PM
Plan Reviewer's activity  5/21/2001 PASS
Received copies of the recorded density reduction survey and revised deed for this project. This satisfies the requirement places on the building permit. The parcel tag has been removed. JCM
(F) Reprint permit  5/11/2001 DONE
Override - Parcel Holds  5/10/2001  
Issue PAID IN FULL permit  5/10/2001 DONE
Routing - FIRE5/8/2001 5/9/2001 PASS
Routing - PLAN CHECK5/9/2001 5/9/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/9/2001 PASS
Override - Parcel Holds  5/9/2001  
Inspection Record Card- Bld  5/9/2001 DONE
Print Occupancy Form  5/9/2001 DONE
Telephone call  5/9/2001 DONE
called Wes
Plan assigned to (JCM)3/1/2001 5/9/2001 PASS
DetailsJohn Menard
5/9/01 15:03:41 JCM - activity updated through activity BLDA022 from case BLD01-00491.
Plan Reviewer's activity  5/8/2001 PASS
Resubmitted plans have been reviewed and approved. JCM
Routing - PUBLIC WORKS5/8/2001 5/8/2001 PASS
Routing - PLAN CHECK4/24/2001 5/8/2001  
Routing - PLAN CHECK4/26/2001 5/8/2001  
Plan resubmittals received  5/3/2001 DONE
Received complete plan resubmittals, Stamped only the front page as resubmittals on the four sets we received. Forwarded all the plans to John Menard. 5/3/01 DAR
Routing - PUBLIC WORKS4/24/2001 4/26/2001 FAIL
Requires street light plan per Bill Colson
Routing - FIRE4/19/2001 4/24/2001 FAIL
water flow, high piled storage, refrigeration info
Routing - PLAN CHECK4/2/2001 4/19/2001  
Plan resubmittals requested  4/19/2001 FAIL
Mailed the architect of record a copy of the comment list requesting revisions. JCM
Routing - PLAN CHECK3/29/2001 4/19/2001  
Plan resubmittals received  4/10/2001 DONE
Received electrical plan resubmittals from Fred Meyers. forwarded same to John Menard. 4/10/01 DAR
Routing Off Site - STRUCTURAL4/4/2001 4/9/2001 PASS
Received a fax from the consulting structural engineer approving the structural resubmittals. JCM
Plan resubmittals received  4/3/2001 DONE
Received plan resubmittals 3 copies from Fred Meyers, forwarded same to John Menard. 4/3/01
Routing - PUBLIC WORKS3/26/2001 3/29/2001 FAIL
Requires street light plan per Bill Colson. 3/28/01 DAR
Routing - PLAN CHECK3/20/2001 3/26/2001  
Routing - PLUMBING3/13/2001 3/20/2001 PASS
detail 12 page P3.1- backflow protection required upstream of any chemical injection systems. cleanouts required every 50' on 2" waste lines below grade, area E. all floor sinks and indirect waste receptors must not be installed within a cabinet, must be exposed. premis protection required on main building water supply.
Plan resubmittals requested  3/19/2001  
Faxed a copy of the structural comment list to the architect of record requesting revisions. JCM
Routing Off Site - STRUCTURAL3/1/2001 3/16/2001 FAIL
Contacted PDQ to take plans to outside eng. KMM Received a comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING3/5/2001 3/13/2001 PASS
Approved per CVA00-19 (Dave Abo, analyst), and per DRH00-101 (Marty Santoyo).
Routing - PLANNING3/12/20013/12/20013/12/2001 PASS
Pass as per variance (CVA00-00019) of seven foot (7') parking lot setback from Franklin Road, pending Design Review Approval.
Routing - PUBLIC WORKS3/1/2001 3/5/2001 FAIL
Plan routing begun/NEW & ADDTN  3/1/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/1/2001 DONE
Received Certificate of Value  2/28/2001 DONE
Application received  2/28/2001  
Recd Pcfee & Taken To Pln CK