Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00505
StatusFinaled
Name SHILOH DEVELOPMENT LTD CO
Site Address 3820 E PECAN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2602 sq. ft. two story single family dwelling with a 1213 sq. ft. finished basement, a 807 sq. ft. attached three car garage, a 296 sq. ft. covered entry porch and free-form concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1220 sq. ft.)(2nd floor 1382 sq. ft.) PC #141 SOLAR PROTECTED DJO 5/11/01 BASEMENT, 1213 sq. ft., is now going to be unfinished area. A separate permit is REQUIRED to FINISH the basement area. All structural, electrical and machanical codes for unfinished area to be met. (sam)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20017/18/20017/18/2001APASS
DetailsRuss Owen
randy ###-#### reinspection ###-#### cell- code for garage 7550 .N 7/18/2001 10:32:29 AM issued lc. 7/18/2001 10:45:47 AM
DOC - Permit Finaled7/18/20017/18/20017/18/2001APASS
DetailsRuss Owen
Finaled by inspector at 7/18/2001 10:45:52 AM
BLD-Final7/16/20017/17/20017/17/2001AFAIL
DetailsSteven Webb
dan ###-#### 7550 garage code C/N on site 7/17/2001 8:42:09 AM
BLD-Final7/17/20017/17/20017/17/2001PFAIL
DetailsSteven Webb
Troy ###-#### or office ###-#### code to get into the garage door is 7550
BLD-Aging Inspection7/16/20017/16/20017/16/2001 PART
DetailsSteven Webb
wip 7/16/2001 7:53:58 AM
Fee Review-notes5/16/20015/16/20015/16/2001 DONE
called to get refund -- value included basement being finish and they are not finishing it...there would have been a 42.00 admin fee for refund and review time and the refund would have been 42. lh
BLD-Energy code compliance5/15/20015/15/20015/15/2001PPART
DetailsSteven Webb
###-#### 5/15/2001 2:03:01 PM
BLD-Framing/Rough-in5/15/20015/15/20015/15/2001PPASS
DetailsSteven Webb
REINSPECTION ###-####
BLD-Framing/Rough-in5/11/20015/14/20015/14/2001APART
DetailsSteven Webb
Troy ###-#### C/N issued--ok to insulate AFTER mechanical r. i. 5/14/2001 8:57:01 AM
BLD-Framing/Rough-in5/11/20015/11/20015/11/2001PCANC
DetailsSteven Webb
troy ###-#### Cancelled by contractor Troy 5/11/2001 12:55:58 PM
Print Pending Permit.LaserJet4  5/11/2001  
Case Summary (BLD)  5/11/2001  
Inspection Record Card- Bld  5/11/2001 DONE
BLD-Framing/Rough-in5/1/20015/2/20015/2/2001APASS
DetailsSteven Webb
###-#### SHEAR -- OK TO SIDE. 5/2/2001 10:06:20 AM
BLD-Foundation3/26/20013/27/20013/27/2001PPART
DetailsSteven Webb
michael ###-#### wip-hd not installed at time of inspection. 3/27/2001 12:05:29 PM
BLD-Footing3/21/20013/22/20013/22/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/21/2001 at 20:39:30. Contact: ###-####. wip 3/22/2001 10:32:48 AM
Issue PAID IN FULL permit  3/21/2001 DONE
Plan assigned to (DJO)3/6/20013/6/20013/7/2001 PASS
DetailsDan Overy
3/7/2001 08:53:22 DJO - activity updated through activity BLDA022 from case BLD01-00505.
PLANS/APPL TAKEN TO FRONT DESK  3/7/2001 DONE
Print Pending Permit.LaserJet4  3/7/2001 DONE
Plan Review Report  3/7/2001 DONE
Inspection Record Card- Bld  3/7/2001 DONE
Telephone call  3/7/2001 DONE
left mess that permit is ready
Plans ACCEPTED BY PLAN CHECK  3/6/2001  
Routing - PUBLIC WORKS3/1/20013/1/20013/2/2001 PASS
Routing - PLANNING3/1/20013/1/20013/1/2001 PASS
Application received  3/1/2001  
Routing - PLAN CHECK3/2/20013/2/2001  PEND
Pending Assignment by DJO3/1/2001   PEND
DetailsDan Overy